← Back
BuildNYC
BRONX
Lambert Houses
2082 BOSTON ROAD · BIN 2013283
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
LL97 CoveredRent Stabilized43 Active Violations ▸FISP: No Report FiledFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsMechanical work6 filings
RoofConstruction hoist and loading dock logistics2p · 3 filings
Floor 16Construction hoist and loading dock logistics1p · 1 filing
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6Temporary pipe scaffold installation1 filing
Floor 5Temporary pipe scaffold installation1 filing
Floor 4Temporary pipe scaffold installation1 filing
Floor 3Temporary pipe scaffold installation1 filing
Floor 2Temporary pipe scaffold installation1 filing
Floor 1Construction hoist loading dock installation1p · 2 filings
CellarDrainage and utilities installation1 filing
Sub-BasementTemporary pipe scaffold installation1 filing · 4 docs
Site & exteriorConstruction fence installation10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Phipps Houses Services2407/08/2026
Lambert House Redevelopment Co603/21/2026
Boston Tremont HDFC203/21/2026
Solar Energy Systems103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2021$10.5M—BOSTON TREMONT HOUSING DEVELOPMENT FUND CORP → 2080 BOSTON ROAD HOUSING DEVELOPMENT FUND CORP— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Plan B Engineering411/17/2022
Paul Perdek, Prof. Engineering306/17/2022
Hansen Engineering112/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Eurocelt Expediting803/21/2026
AE Design Solution603/21/2026
JM Zoning103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platform SolutionsScaffold1507/08/2026
Core Scaffold SystemsScaffold1007/08/2026
Monadnock ConstructionGeneral Contractor907/08/2026
Monadnock General ContGeneral Contractor903/21/2026
RO-Sal Plumbing & HeatingFire Protection607/08/2026
RO-Sal Plumbing & HeatingPlumbing407/08/2026
Alba ServicesScaffold307/08/2026
Monadnock General ContScaffold303/21/2026
Monadnock ConstructionScaffold207/08/2026
Maximum ElectricElectrical103/21/2026
Applied ElectricElectrical103/21/2026
Antonio Ceriello ElectricElectrical103/22/2026
Building Lifecycle
All (140)Filed (8)Permit Issued (34)Signed Off (8)Facade (FISP) (7)Violation (60)Inspection (19)Objection (2)Special Inspection (2)
07/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2024
Signed off — Alteration
INSTALL CONSTRUCTION FENCE IN CONJUNCTION WITH NB#S 210180864 AND 210181426.
X00648570-I1
03/07/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/07/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/06/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/22/2023
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
12/19/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/01/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00758527-I1
11/22/2023
Signed off — Alteration
INSTALLATION OF A LOADING DOCK FOR THE CONSTRUCTION HOISTS (A&B) AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. LOADING DOCKS TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
X08041857-I1
11/21/2023
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK BRIDGE AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION PARTIALLY INSTALLED IN THE ROADWAY. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK BRIDGE TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00725877-I1
11/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/29/2023
Inspection — Pass-Final SD - More than 10 Requested Floors
Pass
View inspection ↗
09/29/2023
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
09/12/2023
Signed off — Alteration
INSTALLATION OF A P/M HOIST COMPLEX (A) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOIST TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00744478-I1
09/12/2023
Signed off — Alteration
INSTALLATION OF A P/M HOIST COMPLEX (B) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOIST TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00744510-I1
09/12/2023
Inspection — Pass-Final SD - More than 10 Requested Floors
Pass
View inspection ↗
09/06/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/06/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/04/2023
Permit issued — Mechanical Systems
X00342725-I1-MS
08/03/2023
Permit issued — Structural
X00342740-I1-ST
08/02/2023
Permit issued — Construction Fence
X00648570-I1-FN
08/02/2023
Permit issued — Earth Work
X00826838-I1-EA
07/26/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/07/2023
Permit issued — Earth Work
X00826838-I1-EA
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Permit issued — Plumbing
X08038236-I1-PL
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/05/2023
Permit issued — Supported Scaffold
X00758527-I1-SF
05/30/2023
Permit issued — Standpipe
X00446953-I1-EW-SD
05/12/2023
Permit issued — Protection and Mechanical Methods
X00744510-I1-PM
05/12/2023
Permit issued — Protection and Mechanical Methods
X00744478-I1-PM
05/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/10/2023
Permit issued — Standpipe
X00448247-I1-EW-SP
04/07/2023
Permit issued — Sprinklers
X00448247-I1-EW-SD
04/06/2023
Permit issued — Sidewalk Shed
X00725877-I1-SH
04/04/2023
Permit issued — Mechanical Systems
X00342725-I1-MS
04/04/2023
Permit issued — Structural
X00342740-I1-ST
03/08/2023
Permit issued — Boiler Equipment
X00757610-I1-BE
02/21/2023
Permit issued — Plumbing
X00342750-I1-PL
11/23/2022
Permit issued — Construction Fence
X00648570-I1-FN
11/18/2022
Permit issued — Protection and Mechanical Methods
X08041857-I1-PMM
11/17/2022
Filed — Alteration
INSTALLATION OF A LOADING DOCK FOR THE CONSTRUCTION HOISTS (A&B) AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. LOADING DOCKS TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
X08041857-I1
11/17/2022
Violation issued (ECB, closed)
Unknown
10/17/2022
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/17/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00758527-I1
06/17/2022
Permit issued — Supported Scaffold
X00758527-I1-SF
06/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/31/2022
Permit issued — Standpipe
X00446953-I1-EW-SD
05/27/2022
Permit issued — Protection and Mechanical Methods
X00744478-I1-PM
05/25/2022
Permit issued — Protection and Mechanical Methods
X00744510-I1-PM
05/24/2022
Filed — Alteration
INSTALLATION OF A P/M HOIST COMPLEX (A) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOIST TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00744478-I1
05/24/2022
Filed — Alteration
INSTALLATION OF A P/M HOIST COMPLEX (B) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOIST TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00744510-I1
05/06/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMonadnock General Cont08/04/2023
DOB NOWStructuralSigned-offMonadnock General Cont08/03/2023
DOB NOWConstruction FenceSigned-offMonadnock General Cont08/02/2023
DOB NOWEarth WorkSigned-offMonadnock General Cont08/02/2023
DOB NOWEarth WorkSigned-offMonadnock Construction07/07/2023
DOB NOWPlumbingSigned-offRO-Sal Plumbing & Heating06/20/2023
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems06/05/2023
DOB NOWStandpipeSigned-offRO-Sal Plumbing & Heating05/30/2023
DOB NOWProtection and Mechanical MethodsSigned-offPlatform Solutions05/12/2023
DOB NOWProtection and Mechanical MethodsSigned-offPlatform Solutions05/12/2023
DOB NOWSprinklersSigned-offRO-Sal Plumbing & Heating04/10/2023
DOB NOWStandpipeSigned-offRO-Sal Plumbing & Heating04/07/2023
DOB NOWSidewalk ShedSigned-offPlatform Solutions04/06/2023
DOB NOWMechanical SystemsSigned-offMonadnock Construction04/04/2023
DOB NOWStructuralSigned-offMonadnock Construction04/04/2023
DOB NOWBoiler EquipmentSigned-offRO-Sal Plumbing & Heating03/08/2023
DOB NOWPlumbingSigned-offRO-Sal Plumbing & Heating02/21/2023
DOB NOWConstruction FenceSigned-offMonadnock Construction11/23/2022
DOB NOWProtection and Mechanical MethodsSigned-offPlatform Solutions11/18/2022
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems06/17/2022
DOB NOWStandpipeSigned-offRO-Sal Plumbing & Heating05/31/2022
DOB NOWProtection and Mechanical MethodsSigned-offPlatform Solutions05/27/2022
DOB NOWProtection and Mechanical MethodsSigned-offPlatform Solutions05/25/2022
DOB NOWStructuralSigned-offMonadnock Construction04/28/2022
DOB NOWSidewalk ShedSigned-offPlatform Solutions04/28/2022
DOB NOWMechanical SystemsSigned-offMonadnock Construction04/22/2022
DOB NOWSprinklersSigned-offRO-Sal Plumbing & Heating04/08/2022
DOB NOWStandpipeSigned-offRO-Sal Plumbing & Heating04/07/2022
DOB NOWPlumbingSigned-offRO-Sal Plumbing & Heating02/28/2022
DOB NOWConstruction FenceSigned-offMonadnock Construction12/28/2021
DOB NOWConstruction FenceSigned-offAlba Services04/05/2021
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems02/25/2021
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems02/24/2021
DOB NOWConstruction FenceSigned-offAlba Services02/24/2021
BIS—ISSUEDAlba Services07/23/2021
BISEQISSUEDAlba Services07/15/2021
BISOTISSUEDTitan Construction Services08/12/2013
BISEQISSUEDColgate Enterprise02/27/2013
2 projects · most recent 09/01/2022
FiledStatusContractorScope
09/01/2022CompleteCorporate Electric Group—
02/10/2021CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
07/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/07/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/22/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/19/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2023Pass-Final SD - More than 10 Requested FloorsPassView ↗
09/29/2023Pass-Final SP - More than 10 Requested FloorsPassView ↗
09/12/2023Pass-Final SD - More than 10 Requested FloorsPassView ↗
09/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/06/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/26/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/17/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
06/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
02/19/2021FinalPaul Perdekprogress
02/19/2021FinalPaul Perdekprogress
▾Documents — 101 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/25/2026X00473673-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/25/2026X00473679-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/23/2026X08041857-I1Request digital key ↗
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION15
04/01/2024210077101Open ↗
04/01/2024200811265Open ↗
04/01/2024220238678Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION4
07/29/2021220735159Open ↗
07/29/2021220735159Open ↗
08/16/2013220321195Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications23
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
07/29/2021220735159Open ↗
08/14/2018220254837Open ↗
08/14/2018220254837Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026X00473679-I1Open ↗
08/23/2026X08041857-I1Open ↗
08/13/2026X00744510-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/10/2018220254837Open ↗
06/26/2013220321195Open ↗
02/27/2013220254837Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/26/2013220321195Open ↗
02/27/2013220254837Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X00473679-I1Open ↗
08/25/2026X00473673-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/10/2018220254837Open ↗
▸Safety & Tenant Protection2
▸BISANTI-HARASSMENT CHECKLIST1
07/28/2021220735159Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/28/2021220735159Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/28/2021220735159Open ↗
06/26/2013220321195Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/06/2008210077101Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/12/2011220144617Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/26/2013220321195Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/04/2014220321195Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/12/2011220144617Open ↗
▸Approvals, Objections & Sign-offs31
▸BISLETTERS - SUPPORTING DOCUMENTATION17
07/29/2021220735159Open ↗
07/29/2021220735159Open ↗
07/28/2021220735159Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026X00473679-I1Open ↗
08/13/2026X08041857-I1Open ↗
08/13/2026X00744510-I1Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
02/27/2013220254837Open ↗
10/23/2012220238678Open ↗
10/12/2011220144617Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/14/2018220254837Open ↗
06/04/2015220321195Open ↗
02/04/2014220321195Open ↗
▸BISLANDMARKS APPROVAL1
07/29/2021220735159Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT5
02/04/2014220321195Open ↗
01/16/2014220321195Open ↗
06/26/2013220321195Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
07/28/2021220735159Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
07/28/2021220735159Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET5
10/21/2020220735159Open ↗
06/26/2013220321195Open ↗
02/27/2013220254837Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION2
08/10/2018220254837Open ↗
01/16/2014220321195Open ↗
▸BISBOROUGH INTAKE FORM1
08/14/2018220254837Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31