← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2086 VALENTINE AVENUE
BRONX · BIN 2130391
💬 Discuss this project
2021Year Built
9Stories
D1Building Class
R7-1Zoning
37,205 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized8 Active Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: Noa-Lior · 6,853 sf lot · 5.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsMechanical systems work including kitchen exhaust and toilet3 filings
Floor 1Curb cut and driveway2 filings · 2 docs
Site & exteriorTemporary wood construction fence for new building1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Noa-Lior603/22/2026
BCN Development503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/03/2019$350K—Private party → NOA-LIOR LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JRS Consulting412/08/2021
BGM Engineering204/13/2021
Edifice Drafting and Services102/11/2021
Enthink Engineers310/19/2020
Bernard Ocasio Architect201/22/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Pine NY703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
StructurelineScaffold603/21/2026
United King ConstructionScaffold303/21/2026
Gagan G.CGeneral Contractor207/08/2026
S & J Construction ServiceScaffold107/08/2026
Martinez Electrical ContElectrical103/22/2026
Five Borough NYCFire Protection107/08/2026
Brookyln SolarworksElectrical103/21/2026
StructurelineGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM Engineering1514512/08/2021
Building Lifecycle
05/27/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · open
05/05/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM…
HPD violation · closed
03/29/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM…
HPD violation · closed
03/29/2026
§ 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 1st…
HPD violation · closed
03/29/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM…
HPD violation · closed
220 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offGagan G.C11/15/2021
DOB NOWMechanical SystemsSigned-offGagan G.C11/12/2021
DOB NOWStructuralSigned-offStructureline04/21/2021
DOB NOWSprinklersSigned-offFive Borough NYC01/27/2021
DOB NOWConstruction FenceSigned-offStructureline10/06/2020
DOB NOWSidewalk ShedSigned-offUnited King Construction09/18/2020
DOB NOWSidewalk ShedSigned-offS & J Construction Service09/16/2020
DOB NOWConstruction FenceSigned-offStructureline03/18/2020
DOB NOWConstruction FenceSigned-offStructureline01/16/2020
BISPLISSUEDAqueduct Mechanical10/13/2021
BIS—ISSUEDCanal Construction10/07/2021
BIS—ISSUEDStructureline03/02/2021
BIS—ISSUEDStructureline10/30/2020
BISPLISSUEDAqueduct Mechanical08/26/2020
BIS—ISSUEDStructureline06/11/2020
BISOTISSUEDStructureline03/25/2020
BISOTISSUEDStructureline02/14/2020
BISEQISSUEDA2Z Construction Group01/05/2016
BIS—ISSUEDA2Z Construction Group01/05/2016
8 projects · most recent 10/04/2023
General Wiring
FiledStatusContractorScope
10/04/2023CancelledBrookyln Solarworks—
06/10/2022CompleteTitan Electrical & Elev Contracting—
03/23/2022CompleteMartinez Electrical ContGeneral Wiring
01/27/2022CompleteMartinez Electrical Cont—
01/27/2022CompleteMartinez Electrical Cont—
09/30/2020CompleteRichard Neu—
07/06/2020CompleteMartinez Electrical Cont—
11/06/2019CompleteO.K. Electrical Service—
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
12/12/2021Fire-Resistant Penetrations and JointsJOSEPH BADINTERspecial
12/12/2021Sprinkler SystemsJOSEPH BADINTERspecial
12/06/2021Sprinkler SystemsRAUL VELASQUEZ MARTINEZspecial
12/06/2021Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
11/09/2021Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
11/09/2021Sprinkler SystemsRAUL VELASQUEZ MARTINEZspecial
10/18/2021Maintenance informationJOSEPH BADINTERenergy_progress
10/18/2021HVAC-R and service water heating equipmentJOSEPH BADINTERenergy_progress
10/18/2021HVAC-R and service water heating system controlsJOSEPH BADINTERenergy_progress
10/18/2021HVAC-R and service water piping design and insulationJOSEPH BADINTERenergy_progress
10/18/2021Shutoff dampersJOSEPH BADINTERenergy_progress
10/18/2021Mechanical SystemsJOSEPH BADINTERspecial
10/18/2021Fire-Resistant Penetrations and JointsJOSEPH BADINTERspecial
10/18/2021Heating SystemsJOSEPH BADINTERspecial
10/18/2021Smoke Control Systems TestingJOSEPH BADINTERspecial
10/18/2021FinalJOSEPH BADINTERprogress
10/18/2021Energy Code Compliance InspectionsJOSEPH BADINTERprogress
04/16/2021FinalJOSEPH BADINTERprogress
04/16/2021MasonryJOSEPH BADINTERspecial
04/16/2021Concrete - Cast-In-PlaceJOSEPH BADINTERspecial
01/24/2020FinalBERNARD OCASIOprogress
287 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account