ECB02/25/20251RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECEIVED A RETAINING WALL CONDITION ASSESS$6K due
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB05/17/1993V-DOB VIOLATION - ACTIVE
ECB04/18/2007FAILURE TO MAINTAIN HAZARDOUS DEFECTS ARE:AT REAR RETAINING WALL HAS VERTICAL & HORIZONTAL CRACKS & IS BULGING OUTWARD TOWARD REAR YARD AL SO FIRE ESCAPE IS RUSTED FROM 1ST TO 4TH FL.REMEDY:MAKE SITE SAFE MAKENothing owed — awaiting certificate of correction