← Back
Two stories - detached, small or mid-size
209-45 112 AVENUE
QUEENS · Queens Village · BIN 4239794
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3-2Zoning
1,340 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,871 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONSTRUCTION & DESIGN1207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/29/2015$465K—BARCA DEVELOPMENT LLC → Private party$347/sf building
02/13/2015$100K—Private party → BARCA DEVELOPMENT LLC$75/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOTIR ASSOCIATES405/22/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URENA CONST & DESIGN INCGeneral Contractor207/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050305/22/2024
Building Lifecycle
All (63)Filed (4)Permit Issued (3)Signed Off (3)Inspection (6)Objection (21)Special Inspection (26)
10/28/2025
Signed off — Alteration
PROPOSED INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE. REMOVAL AND INSTALLATION OF NEW PLUMBING FIXTURES TO BE FILED SEPARATELY UNDER Q00961242-S1.
Q00961242-S2
09/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/13/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE. REMOVAL AND INSTALLATION OF NEW PLUMBING FIXTURES TO BE FILED SEPARATELY UNDER Q00961242-S1.
Q00961242-I1
12/13/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE. REMOVAL AND INSTALLATION OF NEW PLUMBING FIXTURES TO BE FILED SEPARATELY UNDER Q00961242-S1.
Q00961242-S3
12/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/04/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/24/2024
Permit issued — General Construction
Q00961242-S3-GC
07/10/2024
Special inspection requirement — Subgrade Inspections
PAUL MARINO
07/10/2024
Special inspection requirement — Concrete - Cast-In-Place
PAUL MARINO
06/17/2024
Objection raised — Zoning
06/17/2024
Objection resolved — Addressed
06/17/2024
Special inspection requirement — Insulation placement and R values
PAUL MARINO
06/03/2024
Objection raised — Scope
06/03/2024
Objection resolved — Addressed
06/03/2024
Objection raised — Structural
06/03/2024
Objection resolved — Addressed
06/03/2024
Objection raised — Zoning
06/03/2024
Objection resolved — Addressed
06/03/2024
Objection raised — Admin
06/03/2024
Objection resolved — Addressed
06/03/2024
Objection raised — Inspections
06/03/2024
Objection resolved — Addressed
05/24/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/22/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE. REMOVAL AND INSTALLATION OF NEW PLUMBING FIXTURES TO BE FILED SEPARATELY UNDER Q00961242-S1.
Q00961242-S3
05/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
05/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
05/14/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
05/14/2024
Special inspection requirement — Fenestration air leakage
PAUL MARINO
05/14/2024
Special inspection requirement — Fenestration areas
PAUL MARINO
05/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
05/14/2024
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
05/03/2024
Objection raised — Admin
04/22/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE. REMOVAL AND INSTALLATION OF NEW PLUMBING FIXTURES TO BE FILED SEPARATELY UNDER Q00961242-S1.
Q00961242-P1
04/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
04/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
04/19/2024
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
04/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
04/19/2024
Special inspection requirement — Fenestration air leakage
PAUL MARINO
04/19/2024
Special inspection requirement — Fenestration areas
PAUL MARINO
04/19/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
04/19/2024
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
04/10/2024
Permit issued — Plumbing
Q00961242-S2-PL
03/20/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE. REMOVAL AND INSTALLATION OF NEW PLUMBING FIXTURES TO BE FILED SEPARATELY UNDER Q00961242-S1.
Q00961242-S2
03/20/2024
Permit issued — General Construction
Q00961242-I1-GC
03/08/2024
Objection resolved — Addressed
02/26/2024
Objection resolved — Addressed
02/26/2024
Objection resolved — Addressed
01/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
12/07/2023
Objection resolved — Addressed
11/28/2023
Objection raised — Inspections
11/28/2023
Objection raised — Energy
11/28/2023
Objection raised — Zoning
11/28/2023
Objection raised — Scope
11/13/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE. REMOVAL AND INSTALLATION OF NEW PLUMBING FIXTURES TO BE FILED SEPARATELY UNDER Q00961242-S1.
Q00961242-I1
11/10/2023
Special inspection requirement — Fenestration areas
PAUL MARINO
11/10/2023
Special inspection requirement — Fenestration air leakage
PAUL MARINO
11/10/2023
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
11/10/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC10/24/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR04/10/2024
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC03/20/2024
BISOTISSUEDSUNPOWER CORPORATION, SYS07/26/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/04/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/24/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
07/10/2024Subgrade InspectionsPAUL MARINOspecial
07/10/2024Concrete - Cast-In-PlacePAUL MARINOspecial
06/17/2024Insulation placement and R valuesPAUL MARINOenergy_progress
05/14/2024Fire-Resistant Penetrations and JointsPAUL MARINOspecial
05/14/2024Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
05/14/2024Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
05/14/2024Fenestration air leakagePAUL MARINOenergy_progress
05/14/2024Fenestration areasPAUL MARINOenergy_progress
05/14/2024Fire-Resistance Rated ConstructionPAUL MARINOprogress
05/14/2024Energy Code Compliance InspectionsPAUL MARINOprogress
04/19/2024Fire-Resistant Penetrations and JointsPAUL MARINOspecial
04/19/2024Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
04/19/2024Energy Code Compliance InspectionsPAUL MARINOprogress
04/19/2024Fire-Resistance Rated ConstructionPAUL MARINOprogress
04/19/2024Fenestration air leakagePAUL MARINOenergy_progress
04/19/2024Fenestration areasPAUL MARINOenergy_progress
04/19/2024Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
04/19/2024Lighting in dwelling unitsPAUL MARINOenergy_progress
01/24/2024Fire-Resistance Rated ConstructionPAUL MARINOprogress
11/10/2023Fenestration areasPAUL MARINOenergy_progress
11/10/2023Fenestration air leakagePAUL MARINOenergy_progress
11/10/2023Lighting in dwelling unitsPAUL MARINOenergy_progress
11/10/2023Energy Code Compliance InspectionsPAUL MARINOprogress
11/10/2023Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
11/10/2023Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
Latest 25 of 26.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026Q00961242-S2Request digital key ↗
08/22/2026Q00961242-I1Request digital key ↗
08/22/2026Q00961242-S3Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
08/22/2024440792180Open ↗
06/27/2024440792180Open ↗
07/24/2023440792180Open ↗
▸BISWORK PERMIT APPLICATION1
07/26/2023440792180Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1131
08/23/2024440792180Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00961242-S3Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature6
09/22/2026Q00961242-S3Open ↗
09/22/2026Q00961242-S3Open ↗
09/01/2026Q00961242-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026Q00961242-I1Open ↗
08/13/2026Q00961242-S3Open ↗
08/13/2026Q00961242-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/22/2026Q00961242-S3Open ↗
09/01/2026Q00961242-I1Open ↗
08/26/2026Q00961242-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/24/2023440792180Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/24/2023440792180Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/24/2023440792180Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
07/26/2023440792180Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026Q00961242-I1Open ↗
08/13/2026Q00961242-P1Open ↗
08/13/2026Q00961242-S2Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/24/2023440792180Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/24/2023440792180Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/26/2023440792180Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/24/2023440792180Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/24/2023440792180Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/26/2023440792180Open ↗
▸Inspections & Test Reports4
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
07/26/2023440792180Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/26/2023440792180Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
07/26/2023440792180Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/24/2023440792180Open ↗
▸Approvals, Objections & Sign-offs1
▸BISFINAL1
07/26/2023440792180Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/24/2023440792180Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/24/2023440792180Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram1
08/13/2026Q00961242-S3Open ↗
▸DOB NOWPW1 (from plan PDF)1
08/16/2026Q00961242-P1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00961242-S3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00961242-S3Open ↗