209-51 34 AVENUE
QUEENS · BIN 4135715
💬 Discuss this project
1950Year Built
1.5Stories
A0Building Class
R2AZoning
1,451 sfGross Floor Area
1Units
Cape Cod · 4,000 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/28/2023$875K—THE JEAN STERN TRUST → Private party$603/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC111/27/2024
HWL ENGINEERING PC411/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HWL ENGINEERING803/21/2026
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINLI.CONSTRUCTION LLCGeneral Contractor303/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272111/27/2024
HWL ENGINEERING PC3894411/27/2023
Building Lifecycle
All (31)Filed (5)Permit Issued (3)Signed Off (3)Inspection (2)Special Inspection (18)
03/04/2025
Signed off — Alteration
Q01146504-I1
12/02/2024
Permit issued — Solar
Q01146504-I1-SL
11/27/2024
Filed — Alteration
Q01146504-I1
11/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/22/2024
Special inspection requirement — Final
Walid Abdulla
11/22/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
02/01/2024
Signed off — Alteration
Remove Oil tank and oil fired boiler; install new gas-fired boiler and hot water heater and install new Half Bathroom fixtures (Lav. & WC) at Cellar, Kitchen and bathroom renovation at 1st floor; bathroom renovation at 2nd Floor. Relocate gas meter to OSP
Q00854917-S1
01/29/2024
Signed off — Alteration
Remove Oil tank and oil fired boiler; install new gas-fired boiler and hot water heater and install new Half Bathroom fixtures (Lav. & WC) at Cellar, Kitchen and bathroom renovation at 1st floor; bathroom renovation at 2nd Floor. Relocate gas meter to OSP
Q00854917-I1
11/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WANLONG HE
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
WANLONG HE
11/28/2023
Special inspection requirement — Maintenance information
WANLONG HE
11/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WANLONG HE
11/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
WANLONG HE
11/27/2023
Filed — Alteration
Remove Oil tank and oil fired boiler; install new gas-fired boiler and hot water heater and install new Half Bathroom fixtures (Lav. & WC) at Cellar, Kitchen and bathroom renovation at 1st floor; bathroom renovation at 2nd Floor. Relocate gas meter to OSP
Q00854917-P2
11/15/2023
Filed — Alteration
Remove Oil tank and oil fired boiler; install new gas-fired boiler and hot water heater and install new Half Bathroom fixtures (Lav. & WC) at Cellar, Kitchen and bathroom renovation at 1st floor; bathroom renovation at 2nd Floor. Relocate gas meter to OSP
Q00854917-P1
11/13/2023
Special inspection requirement — Maintenance information
WANLONG HE
11/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WANLONG HE
11/13/2023
Special inspection requirement — Energy Code Compliance Inspections
WANLONG HE
11/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
WANLONG HE
11/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WANLONG HE
07/18/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/26/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/23/2023
Permit issued — Plumbing
Q00854917-S1-PL
05/18/2023
Filed — Alteration
Remove Oil tank and oil fired boiler; install new gas-fired boiler and hot water heater and install new Half Bathroom fixtures (Lav. & WC) at Cellar, Kitchen and bathroom renovation at 1st floor; bathroom renovation at 2nd Floor. Relocate gas meter to OSP
Q00854917-S1
05/05/2023
Permit issued — General Construction
Q00854917-I1-GC
04/25/2023
Filed — Alteration
Remove Oil tank and oil fired boiler; install new gas-fired boiler and hot water heater and install new Half Bathroom fixtures (Lav. & WC) at Cellar, Kitchen and bathroom renovation at 1st floor; bathroom renovation at 2nd Floor. Relocate gas meter to OSP
Q00854917-I1
04/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WANLONG HE
04/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
WANLONG HE
04/04/2023
Special inspection requirement — Final
WANLONG HE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC12/02/2024
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG05/23/2023
DOB NOWGeneral ConstructionSigned-offXINLI.CONSTRUCTION LLC05/05/2023
2 projects · most recent 11/27/2024
General Wiring
FiledStatusContractorScope
11/27/2024CompleteSUNRUN SOLAR ELECTL CORP—
06/09/2023CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/18/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/26/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
11/22/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/22/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/22/2024Energy Code Compliance InspectionsWalid Abdullaprogress
11/22/2024FinalWalid Abdullaprogress
11/22/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
11/28/2023Fire-Resistant Penetrations and JointsWANLONG HEspecial
11/28/2023Energy Code Compliance InspectionsWANLONG HEprogress
11/28/2023Maintenance informationWANLONG HEenergy_progress
11/28/2023HVAC-R and service water piping design and insulationWANLONG HEenergy_progress
11/28/2023HVAC-R and service water heating equipmentWANLONG HEenergy_progress
11/13/2023Maintenance informationWANLONG HEenergy_progress
11/13/2023Fire-Resistant Penetrations and JointsWANLONG HEspecial
11/13/2023Energy Code Compliance InspectionsWANLONG HEprogress
11/13/2023HVAC-R and service water heating equipmentWANLONG HEenergy_progress
11/13/2023HVAC-R and service water piping design and insulationWANLONG HEenergy_progress
04/25/2023Fire-Resistant Penetrations and JointsWANLONG HEspecial
04/25/2023Structural Stability – Alterations of existing buildingsWANLONG HEspecial
04/04/2023FinalWANLONG HEprogress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026Q00854917-I1Request digital key ↗
08/23/2026Q00854917-S1Request digital key ↗
08/23/2026Q00854917-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature12
08/29/2026Q00854917-I1Open ↗
08/28/2026Q00854917-S1Open ↗
08/28/2026Q00854917-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026Q00854917-I1Open ↗
08/29/2026Q00854917-I1Open ↗
08/28/2026Q00854917-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026Q00854917-I1Open ↗
08/23/2026Q00854917-S1Open ↗
08/23/2026Q00854917-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026Q00854917-P2Open ↗
08/23/2026Q00854917-S1Open ↗
08/23/2026Q00854917-P1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01146504-I1Open ↗