One family attached or semi-detached
209-70 45 ROAD
QUEENS · BIN 4156816
💬 Discuss this project
1945Year Built
1Stories
A5Building Class
R3-1Zoning
800 sfGross Floor Area
1Units
One family attached or semi-detached · 1,900 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 06/08/2026
FiledStatusContractorScope
06/08/2026Permit IssuedISLAND ELECTRIC CORP—
1 job · most recent 06/08/2026
FiledStatusContractorScope
06/08/2026——10 panels, 4.1 kw, 176 roof_area_sqft
Building Lifecycle
All (8)Filed (1)Special Inspection (7)
06/08/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 10 MODULES, 4.1KW
Q01412341-I1
06/08/2026
Special inspection requirement — Post-installed Anchors
Mina Makar
06/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
06/08/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
06/08/2026
Special inspection requirement — Adhesive-Based Solar Pedestal Bonding Systems
Mina Makar
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
06/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
06/04/2026
Special inspection requirement — Final
Mina Makar
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR106/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281106/08/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/08/2026Post-installed AnchorsMina Makarspecial
06/08/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
06/08/2026Air barrier - visual inspectionMina Makarenergy_progress
06/08/2026Adhesive-Based Solar Pedestal Bonding SystemsMina Makarspecial
06/04/2026Fire-Resistant Penetrations and JointsMina Makarspecial
06/04/2026Energy Code Compliance InspectionsMina Makarprogress
06/04/2026FinalMina Makarprogress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01412341-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026Q01412341-I1Open ↗
08/29/2026Q01412341-I1Open ↗
08/29/2026Q01412341-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026Q01412341-I1Open ↗
08/29/2026Q01412341-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01412341-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01412341-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/16/2026Q01412341-I1Open ↗