← Back
One story - permanent living quarter
209 BARLOW DRIVE SOUTH
BROOKLYN · Marine Park-Mill Basin-Bergen Beach · BIN 3242910
💬 Discuss this project
1960Year Built
2Stories
A2Building Class
R2Zoning
3,715 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 4,500 sf lot · 0.83 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneralOther
Roof5p · 1 filing · 20 docs
Floor 226p · 1 filing · 20 docs
Floor 140p · 1 filing · 20 docs
Site & exterior54p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/06/2022$926K—— → —$249/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DOV HADAS, ARCHITECT PC607/29/2025
TWIG CONSULTING ENGINEERS PC103/11/2024
AUTOGRAPHIC CO201/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SITE SAFETY BSD903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ELITE GC NY INCGeneral Contractor607/08/2026
YAFE MEOD CORPGeneral Contractor607/08/2026
EXPERT PLUMBING & HEATINGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616807/29/2025
Building Lifecycle
All (144)Filed (9)Permit Issued (10)Signed Off (6)Violation (4)Inspection (5)Objection (80)Special Inspection (30)
10/28/2025
Signed off — Alteration
HEREWITH FILED PLUMBING APPLICATION TO REPLACE EXISTING, CAP AND REMOVE, AND INSTALL NEW PLUMBING AND GAS FIXTURES ON FIRST AND SECOND FLOORS
B00960118-S3
10/28/2025
Signed off — Alteration
HEREWITH FILED PLUMBING APPLICATION TO REPLACE EXISTING, CAP AND REMOVE, AND INSTALL NEW PLUMBING AND GAS FIXTURES ON FIRST AND SECOND FLOORS
B00960118-S2
10/28/2025
Signed off — Alteration
HEREWITH FILED PLUMBING APPLICATION TO REPLACE EXISTING, CAP AND REMOVE, AND INSTALL NEW PLUMBING AND GAS FIXTURES ON FIRST AND SECOND FLOORS
B00960118-S4
10/17/2025
Permit issued — Mechanical Systems
B00960118-S4-MS
10/14/2025
Signed off — Alteration
HEREWITH FILED PLUMBING APPLICATION TO REPLACE EXISTING, CAP AND REMOVE, AND INSTALL NEW PLUMBING AND GAS FIXTURES ON FIRST AND SECOND FLOORS
B00960118-I1
10/14/2025
Signed off — Alteration
HEREWITH FILED PLUMBING APPLICATION TO REPLACE EXISTING, CAP AND REMOVE, AND INSTALL NEW PLUMBING AND GAS FIXTURES ON FIRST AND SECOND FLOORS
B00960118-S1
08/08/2025
Permit issued — Plumbing
B00960118-S1-PL
08/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/29/2025
Filed — Alteration
HEREWITH FILED PLUMBING APPLICATION TO REPLACE EXISTING, CAP AND REMOVE, AND INSTALL NEW PLUMBING AND GAS FIXTURES ON FIRST AND SECOND FLOORS
B00960118-P3
07/29/2025
Signed off — Alteration
HEREWITH FILED PLUMBING APPLICATION TO REPLACE EXISTING, CAP AND REMOVE, AND INSTALL NEW PLUMBING AND GAS FIXTURES ON FIRST AND SECOND FLOORS
B00960118-S5
07/02/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
07/02/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
07/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/02/2025
Special inspection requirement — Metering
FAHAD FATEH
07/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/21/2025
Permit issued — General Construction
B00960118-I1-GC
05/20/2025
Violation issued (ECB, closed)
Construction
12/13/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/30/2024
Special inspection requirement — Masonry
FAHAD FATEH
10/30/2024
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
10/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/30/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
FAHAD FATEH
10/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
10/30/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
10/30/2024
Special inspection requirement — Lowest Floor Elevation
FAHAD FATEH
10/30/2024
Special inspection requirement — Final
FAHAD FATEH
10/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
10/30/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
10/30/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
10/30/2024
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
10/30/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
10/30/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
10/30/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
10/30/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/23/2024
Permit issued — Structural
B00960118-S2-ST
09/23/2024
Permit issued — Construction Fence
B00960118-S5-FN
09/20/2024
Filed — Alteration
HEREWITH FILED PLUMBING APPLICATION TO REPLACE EXISTING, CAP AND REMOVE, AND INSTALL NEW PLUMBING AND GAS FIXTURES ON FIRST AND SECOND FLOORS
B00960118-P2
08/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/31/2024
Permit issued — Plumbing
B00960118-S1-PL
07/11/2024
Filed — Alteration
HEREWITH FILED PLUMBING APPLICATION TO REPLACE EXISTING, CAP AND REMOVE, AND INSTALL NEW PLUMBING AND GAS FIXTURES ON FIRST AND SECOND FLOORS
B00960118-P1
06/18/2024
Violation issued (ECB, closed)
Construction
06/18/2024
Violation issued (ECB, closed)
Unknown
06/18/2024
Violation issued (ECB, closed)
Construction
05/07/2024
Permit issued — Construction Fence
B00960118-S5-FN
04/15/2024
Objection resolved — Addressed
04/15/2024
Objection resolved — Addressed
04/12/2024
Objection raised — Scope
04/12/2024
Objection raised — Other
04/05/2024
Permit issued — General Construction
B00960118-I1-GC
04/05/2024
Permit issued — Foundation
B00960118-S3-FO
04/04/2024
Permit issued — Structural
B00960118-S2-ST
04/02/2024
Filed — Alteration
HEREWITH FILED PLUMBING APPLICATION TO REPLACE EXISTING, CAP AND REMOVE, AND INSTALL NEW PLUMBING AND GAS FIXTURES ON FIRST AND SECOND FLOORS
B00960118-S5
04/02/2024
Objection resolved — Addressed
04/02/2024
Objection resolved — Addressed
03/26/2024
Objection resolved — Addressed
03/11/2024
Filed — Alteration
HEREWITH FILED PLUMBING APPLICATION TO REPLACE EXISTING, CAP AND REMOVE, AND INSTALL NEW PLUMBING AND GAS FIXTURES ON FIRST AND SECOND FLOORS
B00960118-S4
02/12/2024
Objection resolved — Addressed
02/09/2024
Objection resolved — Addressed
Latest 60 of 144 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offYAFE MEOD CORP10/17/2025
DOB NOWPlumbingSigned-offEXPERT PLUMBING & HEATING08/08/2025
DOB NOWGeneral ConstructionSigned-offYAFE MEOD CORP05/21/2025
DOB NOWStructuralSigned-offELITE GC NY INC09/23/2024
DOB NOWConstruction FenceSigned-offELITE GC NY INC09/23/2024
DOB NOWPlumbingSigned-offEXPERT PLUMBING & HEATING07/31/2024
DOB NOWConstruction FenceSigned-offELITE GC NY INC05/07/2024
DOB NOWGeneral ConstructionSigned-offYAFE MEOD CORP04/05/2024
DOB NOWFoundationSigned-offYAFE MEOD CORP04/05/2024
DOB NOWStructuralSigned-offELITE GC NY INC04/04/2024
2 projects · most recent 09/10/2026
General Wiring
FiledStatusContractorScope
09/10/2026Permit IssuedBERGER QUALITY ELEC'L CON—
01/23/2024CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/13/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/07/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
07/02/2025Permanent certificateFAHAD FATEHenergy_progress
07/02/2025Maintenance informationFAHAD FATEHenergy_progress
07/02/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/02/2025MeteringFAHAD FATEHenergy_progress
07/02/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/30/2024MasonryFAHAD FATEHspecial
10/30/2024Concrete - Cast-In-PlaceFAHAD FATEHspecial
10/30/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/30/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)FAHAD FATEHspecial
10/30/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
10/30/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
10/30/2024Lowest Floor ElevationFAHAD FATEHprogress
10/30/2024FinalFAHAD FATEHprogress
10/30/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
10/30/2024Protection of exposed foundation insulationFAHAD FATEHenergy_progress
10/30/2024Fenestration air leakageFAHAD FATEHenergy_progress
10/30/2024Air barrier continuity plan testingFAHAD FATEHenergy_progress
10/30/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
10/30/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
10/30/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
10/30/2024Fenestration areasFAHAD FATEHenergy_progress
01/14/2024FinalFAHAD FATEHprogress
01/14/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
01/14/2024FinalFAHAD FATEHprogress
01/14/2024Footing and FoundationFAHAD FATEHprogress
Latest 25 of 33.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026B00960118-P2Request digital key ↗
08/26/2026B00960118-P1Request digital key ↗
08/26/2026B00960118-S5Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/26/2026B00960118-I1Open ↗
08/13/2026B00960118-P2Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026B00960118-S1Open ↗
08/26/2026B00960118-P1Open ↗
08/26/2026B00960118-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00960118-P3Open ↗
08/26/2026B00960118-S4Open ↗
08/26/2026B00960118-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00960118-P3Open ↗
08/26/2026B00960118-S4Open ↗
08/26/2026B00960118-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/26/2026B00960118-P1Open ↗
08/26/2026B00960118-S1Open ↗
08/26/2026B00960118-I1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents10
▸DOB NOWDOB Form (from plan PDF)3
08/16/2026B00960118-P2Open ↗
08/16/2026B00960118-P2Open ↗
08/16/2026B00960118-P2Open ↗
▸DOB NOWPlot Diagram3
08/26/2026B00960118-I1Open ↗
08/13/2026B00960118-S3Open ↗
08/13/2026B00960118-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/26/2026B00960118-I1Open ↗
08/13/2026B00960118-P2Open ↗
▸DOB NOWSite Survey: Initial2
08/26/2026B00960118-I1Open ↗
08/13/2026B00960118-P2Open ↗