← Back
BuildNYC
Miscellaneous two family
209 BAY 46 STREET
BROOKLYN · BIN 3187275
💬 Discuss this project
1960Year Built
2Stories
B9Building Class
R5Zoning
2,945 sfGross Floor Area
2Units
Miscellaneous two family · 2,900 sf lot · 1.02 FAR built · Flood zone X500
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3p · 1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Etrecte207/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jbi Construction Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.B.I. Construction GroupGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Etrecte8116207/31/2024
Building Lifecycle
09/19/2024
Signed off — Alteration
INSTALLTION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
B01069544-I1
08/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
08/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
08/01/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
08/01/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
14 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. Construction Group07/01/2024
1 project · most recent 06/13/2024
FiledStatusContractorScope
06/13/2024CompleteJSP Electl CNTNG—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/01/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
08/01/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
08/01/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
08/01/2024FinalVYACHESLAV NECHAYEVprogress
08/01/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
07/31/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
07/31/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
07/31/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
07/31/2024FinalVYACHESLAV NECHAYEVprogress
07/31/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
13 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account