← Back
Primarily 4 family with 1 store or office
209 NASSAU AVENUE
BROOKLYN · BIN 3066504
💬 Discuss this project
1931Year Built
3Stories
S4Building Class
R6BZoning
4,775 sfGross Floor Area
5Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Primarily 4 family with 1 store or office · 2,125 sf lot · 2.25 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Floor 28p · 1 filing · 6 docs
Floor 19p · 1 filing · 6 docs
Cellar8p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KPFF CONSULTING ENGINEERS103/10/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WSCONSULTANT & EXPEDITING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKIE LAWRENCEGeneral Contractor603/21/2026
ROOPCHAND SINGHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519103/10/2023
Building Lifecycle
All (36)Filed (1)Permit Issued (2)Violation (25)Special Inspection (8)
05/05/2026
Violation issued (HPD, open)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/10/2025
Violation issued (HPD, closed)
A
11/27/2024
Violation issued (HPD, closed)
I
10/02/2024
Violation issued (FDNY_ORDER, closed)
10/02/2024
Violation issued (FDNY_ORDER, closed)
10/02/2024
Violation issued (FDNY_ORDER, closed)
04/11/2024
Violation issued (HPD, closed)
A
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/29/2023
Permit issued — Structural
B00807582-I1-ST
03/29/2023
Permit issued — General Construction
B00807582-I1-GC
03/24/2023
Violation issued (HPD, closed)
A
03/10/2023
Filed — Alteration
FILING PROJECT CONSISTS OF STRUCTURAL REPAIRS TO THE EXISTING BUILDING. SCOPE OF WORK INCLUDES JOIST SISTERING/REINFORCING, FLOOR LEVELING, AND REPAIR OF EXISTING FRAMED BEARING WALLS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00807582-I1
01/05/2023
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
01/05/2023
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
01/05/2023
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
01/05/2023
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
01/04/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Younes Abouyaala
01/04/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/04/2023
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
01/04/2023
Special inspection requirement — Final
Younes Abouyaala
11/10/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
I
10/18/2018
Violation issued (HPD, closed)
I
11/14/2016
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
02/23/2015
Violation issued (HPD, closed)
I
06/05/2013
Violation issued (HPD, open)
B
02/02/2007
Violation issued (ECB, closed)
Construction
02/02/2007
Violation issued (ECB, closed)
Construction
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/04/1992
Violation issued (ECB, closed)
Construction
05/12/1988
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedAKIE LAWRENCE03/29/2023
DOB NOWGeneral ConstructionPermit IssuedAKIE LAWRENCE03/29/2023
BISOTISSUEDCITYWIDE FIRE SYS.PLBG ENG CORP03/26/2007
1 project · most recent 05/02/2025
General Wiring
FiledStatusContractorScope
05/02/2025CompleteASSET ELECTRIC CORPGeneral Wiring
1 project · most recent 03/10/2023
Steel Concrete
FiledStatusContractorScope
03/10/2023Permit IssuedAKIE LAWRENCESteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
01/05/2023Concrete - Cast-In-PlaceYounes Abouyaalaspecial
01/05/2023Post-installed AnchorsYounes Abouyaalaspecial
01/05/2023Structural Steel - WeldingYounes Abouyaalaspecial
01/05/2023Subgrade InspectionsYounes Abouyaalaspecial
01/04/2023Construction Operations Influencing Adjacent StructuresYounes Abouyaalaspecial
01/04/2023Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/04/2023Structural Steel - DetailsYounes Abouyaalaspecial
01/04/2023FinalYounes Abouyaalaprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/27/2026B00807582-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B00807582-I1Open ↗
08/25/2026B00807582-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B00807582-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B00807582-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00807582-I1Open ↗