← Back
BuildNYC
Condo, residential unit in elevator building
209 WEST 104TH STREET
MANHATTAN · BIN 1075331
💬 Discuss this project
1935Year Built
6Stories
R4Building Class
R8BZoning
26,236 sfGross Floor Area
46Units
LL97 CoveredRent Stabilized39 Active Violations 1 likely answered ▸
Condo, residential unit in elevator building · 7,569 sf lot · 3.47 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBoiler and oil burner replacement16p · 1 filing · 20 docs
Floor 6Boiler and oil burner replacement16p · 1 filing · 20 docs
Floor 5Boiler and oil burner replacement16p · 1 filing · 20 docs
Floor 4Boiler and oil burner replacement16p · 1 filing · 20 docs
Floor 3Boiler and oil burner replacement16p · 1 filing · 20 docs
Floor 2Boiler and oil burner replacement16p · 1 filing · 20 docs
Floor 1Boiler and oil burner replacement16p · 1 filing · 20 docs
CellarBoiler and oil burner replacement16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
209 Condo203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company607/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Century Electric CoElectrical203/22/2026
Mmi Mechanicalspecialty_contractor207/08/2026
AP Plumbing & HVACPlumbing207/08/2026
Cosme Plumbing & HeatingPlumbing203/22/2026
Century ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851607/14/2021
Building Lifecycle
All (90)Filed (6)Permit Issued (7)Signed Off (3)Violation (60)Special Inspection (14)
06/04/2025
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, closed)
A
03/16/2023
Violation issued (HPD, closed)
A
08/31/2022
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING AND CONNECT TO REPLACEMENT BOILER.
M00354149-I1
07/22/2022
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING AND CONNECT TO REPLACEMENT BOILER.
M00354149-S2
07/22/2022
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING AND CONNECT TO REPLACEMENT BOILER.
M00354149-S1
07/08/2022
Violation issued (HPD, open)
B
07/08/2022
Violation issued (HPD, open)
B
07/08/2022
Violation issued (HPD, open)
C
07/08/2022
Violation issued (HPD, open)
B
07/08/2022
Violation issued (HPD, open)
B
05/26/2022
Violation issued (HPD, closed)
C
05/26/2022
Violation issued (HPD, closed)
A
05/26/2022
Violation issued (HPD, open)
B
05/26/2022
Violation issued (HPD, open)
B
05/26/2022
Violation issued (HPD, open)
B
05/26/2022
Violation issued (HPD, open)
B
05/26/2022
Violation issued (HPD, open)
A
05/17/2022
Violation issued (HPD, open)
C
05/17/2022
Violation issued (HPD, open)
B
05/17/2022
Violation issued (HPD, open)
B
05/17/2022
Violation issued (HPD, open)
B
09/01/2021
Violation issued (HPD, open)
B
09/01/2021
Violation issued (HPD, open)
B
09/01/2021
Violation issued (HPD, open)
C
08/31/2021
Permit issued — Plumbing
M00354149-I1-PL
08/18/2021
Violation issued (HPD, open)
B
08/18/2021
Violation issued (HPD, open)
B
08/18/2021
Violation issued (HPD, open)
B
08/18/2021
Violation issued (HPD, closed)
A
08/18/2021
Violation issued (HPD, open)
B
08/18/2021
Violation issued (HPD, open)
B
08/13/2021
Violation issued (HPD, open)
B
08/13/2021
Violation issued (HPD, open)
B
08/13/2021
Violation issued (HPD, open)
A
08/13/2021
Violation issued (HPD, open)
A
08/13/2021
Violation issued (HPD, open)
A
08/13/2021
Violation issued (HPD, open)
B
08/13/2021
Violation issued (HPD, open)
C
08/13/2021
Violation issued (HPD, open)
B
07/22/2021
Permit issued — Mechanical Systems
M00354149-S2-MS
07/22/2021
Permit issued — Boiler Equipment
M00354149-S1-BE
07/21/2021
Permit issued — Boiler Equipment
M00354149-S1-BE
07/16/2021
Special inspection requirement — HVAC and service water heating equipment
LOUIS ARENA
07/16/2021
Special inspection requirement — Chimneys and vents
LOUIS ARENA
07/16/2021
Special inspection requirement — Fire-Resistance Rated Construction
LOUIS ARENA
07/16/2021
Special inspection requirement — Final
LOUIS ARENA
07/16/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
07/16/2021
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
07/16/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
07/16/2021
Special inspection requirement — Mechanical Systems
LOUIS ARENA
07/14/2021
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING AND CONNECT TO REPLACEMENT BOILER.
M00354149-P3
07/14/2021
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING AND CONNECT TO REPLACEMENT BOILER.
M00354149-P1
07/14/2021
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING AND CONNECT TO REPLACEMENT BOILER.
M00354149-P2
07/06/2021
Special inspection requirement — Mechanical Systems
LOUIS ARENA
07/06/2021
Special inspection requirement — Fire-Resistance Rated Construction
LOUIS ARENA
07/06/2021
Special inspection requirement — Final
LOUIS ARENA
07/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
07/06/2021
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
07/06/2021
Special inspection requirement — Chimneys and vents
LOUIS ARENA
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating08/31/2021
DOB NOWMechanical SystemsSigned-offMmi Mechanical07/22/2021
DOB NOWBoiler EquipmentSigned-offMmi Mechanical07/22/2021
DOB NOWBoiler EquipmentSigned-offMmi Mechanical07/21/2021
DOB NOWBoiler EquipmentSigned-offMmi Mechanical07/22/2020
DOB NOWMechanical SystemsSigned-offMmi Mechanical07/21/2020
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating07/10/2020
BISOTISSUEDKay Waterproofing12/03/2003
BISOTISSUEDKay Waterproofing06/24/2003
BISOTISSUEDKay Waterproofing10/02/2001
BISPLISSUEDA. Steinman Plumbing & Heating08/06/1998
BISOTISSUEDSavone Construction07/02/1998
BISEQISSUEDRegional Scaffold & Hoisting Co08/09/1990
3 projects · most recent 03/14/2024
General Wiring Boiler Controls
FiledStatusContractorScope
03/14/2024CompleteGRX Euro ElectricGeneral Wiring
08/16/2022CompleteCentury ElectricGeneral Wiring
07/22/2020CompleteEtricity Electrical CoBoiler Controls
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/16/2021HVAC and service water heating equipment LOUIS ARENAenergy_progress
07/16/2021Chimneys and ventsLOUIS ARENAspecial
07/16/2021Fire-Resistance Rated ConstructionLOUIS ARENAprogress
07/16/2021FinalLOUIS ARENAprogress
07/16/2021Heating SystemsLOUIS ARENAspecial
07/16/2021HVAC and service water heating system controls LOUIS ARENAenergy_progress
07/16/2021Maintenance informationLOUIS ARENAenergy_progress
07/16/2021Mechanical SystemsLOUIS ARENAspecial
07/06/2021Mechanical SystemsLOUIS ARENAspecial
07/06/2021Fire-Resistance Rated ConstructionLOUIS ARENAprogress
07/06/2021FinalLOUIS ARENAprogress
07/06/2021Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
07/06/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
07/06/2021Chimneys and ventsLOUIS ARENAspecial
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/04/2026M00354149-S1Request digital key ↗
08/15/2026M00354149-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00354149-S2Request digital key ↗
08/15/2026M00354149-P3Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00354149-I1Request digital key ↗
08/15/2026M00354149-P2Request digital key ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature8
10/04/2026M00354149-S2Open ↗
10/04/2026M00354149-S2Open ↗
09/01/2026M00354149-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/04/2026M00354149-P3Open ↗
09/04/2026M00354149-P2Open ↗
09/04/2026M00354149-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/04/2026M00354149-S2Open ↗
10/04/2026M00354149-S2Open ↗
09/01/2026M00354149-P3Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan6
08/13/2026M00354149-P1Open ↗
08/13/2026M00354149-S2Open ↗
08/13/2026M00354149-P3Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/04/2026M00354149-S2Open ↗
09/04/2026M00354149-S1Open ↗
09/04/2026M00354149-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00354149-S1Open ↗