← Back
Elevator apt, semi-fireproof with stores
209 WEST 106 STREET
MANHATTAN · Upper West Side-Manhattan Valley · BIN 1056635
💬 Discuss this project
1925Year Built
16Stories
D7Building Class
R8AZoning
106,149 sfGross Floor Area
78Units
LL97 CoveredRent Stabilized29 Open Violations ▸FISP: SAFE
Elevator apt, semi-fireproof with stores · Owner of record: 207-211 FO LLC · 10,092 sf lot · 10.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentCivilGeneralOther
Roof1p · 1 filing · 2 docs
Floor 151p · 1 filing · 8 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar1p · 1 filing · 2 docs
Site & exterior27p · 3 filings · 14 docs
Filed — no permit issued5p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ABRO MANAGEMENT403/21/2026
207-211 W 106403/21/2026
RIMA 106 L P303/21/2026
207-211 FO LL C/O ABRO MANAGEMEN203/21/2026
207-211 WEST 106203/21/2026
UNITED CAPITAL203/21/2026
207-211 FO LL C O ABRO MANAGEMEN203/21/2026
207-211 FO LLC103/22/2026
A.F MANAGEMENT CO103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STRUCTURAL ENGINEERING BURO206/01/2026
PAUL PERDEK, PROF. ENG. PLLC301/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE NY INSTALLATIONS INCGeneral Contractor903/21/2026
ROBINSON, PHILIPElectrical503/21/2026
DUNCAN, JAMESElectrical503/21/2026
WINDHAM RESTORATION CORPGeneral Contractor307/08/2026
JOSEPH ADAMOElectrical203/21/2026
SENAD MEHOVICElectrical103/21/2026
MARTINEZ, FERNANDOFire Protection103/21/2026
NICHOLAS BLASONEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRUCTURAL ENGINEERING BU5883206/01/2026
Building Lifecycle
All (92)Filed (5)Permit Issued (5)Signed Off (3)Facade (FISP) (12)Violation (60)Special Inspection (7)
06/01/2026
Filed — Alteration
Rebuild Brickwork single wythe, cut and point bricks. Replace the existing steel lintels with new galvanized ones. Patch chipped or cracked facade stones
M01395740-I1
06/01/2026
Special inspection requirement — Masonry
Ruslan Solovyev
05/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/30/2026
Special inspection requirement — Final
Ruslan Solovyev
05/28/2024
Violation issued (HPD, open)
C
03/05/2024
Signed off — Alteration
M08052541-I1
03/05/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00742413-I1
11/16/2023
Cycle 9 facade report submitted
11/16/2023
Cycle 9 facade inspection completed
10/25/2023
Cycle 9 facade report signed — SAFE
09/22/2023
Signed off — Alteration
LIMITED FACADE REPAIRS: BRICK POINTING, STONE REPAIRS, AND REPLACEMENT, BRICK REPLACEMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00520174-I1
09/15/2023
Permit issued — General Construction
M00520174-I1-GC
05/22/2023
Permit issued — Sidewalk Shed
M00742413-I1-SH
02/23/2023
Cycle 9 facade report signed — SWARMP
02/03/2023
Cycle 9 facade report submitted
01/26/2023
Cycle 9 facade inspection completed
01/18/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00742413-P1
01/07/2023
Permit issued — Supported Scaffold
M08052541-I1-SF
01/06/2023
Filed — Alteration
M08052541-I1
09/15/2022
Permit issued — General Construction
M00520174-I1-GC
05/27/2022
Permit issued — Sidewalk Shed
M00742413-I1-SH
05/26/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00742413-I1
06/17/2021
Filed — Alteration
LIMITED FACADE REPAIRS: BRICK POINTING, STONE REPAIRS, AND REPLACEMENT, BRICK REPLACEMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00520174-I1
05/17/2021
Special inspection requirement — Masonry
Ruslan Solovyev
05/17/2021
Special inspection requirement — Air barrier - visual inspection
Ruslan Solovyev
05/17/2021
Special inspection requirement — Final
Ruslan Solovyev
05/17/2021
Special inspection requirement — Energy Code Compliance Inspections
Ruslan Solovyev
08/24/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/24/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/21/2019
Violation issued (HPD, closed)
B
07/21/2019
Violation issued (HPD, closed)
B
07/21/2019
Violation issued (HPD, open)
B
07/21/2019
Violation issued (HPD, open)
B
07/21/2019
Violation issued (HPD, open)
B
07/21/2019
Violation issued (HPD, open)
B
07/21/2019
Violation issued (HPD, open)
B
07/21/2019
Violation issued (HPD, open)
B
07/21/2019
Violation issued (HPD, open)
B
07/21/2019
Violation issued (HPD, open)
B
07/19/2019
Violation issued (HPD, closed)
C
07/19/2019
Violation issued (HPD, closed)
C
06/28/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/28/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/31/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/15/2018
Cycle 8 facade report signed — SWARMP
11/01/2018
Cycle 8 facade inspection completed
10/28/2018
Violation issued (HPD, open)
B
10/28/2018
Violation issued (HPD, open)
B
10/28/2018
Violation issued (HPD, open)
B
10/28/2018
Violation issued (HPD, open)
B
10/28/2018
Violation issued (HPD, open)
A
10/28/2018
Violation issued (HPD, open)
B
10/09/2018
Violation issued (ECB, closed)
Construction
10/05/2018
Violation issued (HPD, open)
A
10/05/2018
Violation issued (HPD, closed)
C
10/05/2018
Violation issued (HPD, open)
A
10/05/2018
Violation issued (HPD, open)
A
10/05/2018
Violation issued (HPD, open)
A
10/05/2018
Violation issued (HPD, open)
A
10/05/2018
Violation issued (HPD, open)
A
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWINDHAM RESTORATION CORP09/15/2023
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I05/22/2023
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I01/07/2023
DOB NOWGeneral ConstructionSigned-offWINDHAM RESTORATION CORP09/15/2022
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I05/27/2022
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM10/19/2016
BISOTISSUEDRAPID MASONRY RESTORATION CORP09/13/2016
BISPLISSUEDP.S.I. MECHANICAL10/21/2015
BISOTISSUEDE & D GENERAL CONTRACTOR10/07/2015
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM08/06/2015
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM08/19/2014
BISPLISSUEDBAUER MECHANCIAL LLC08/20/2013
BISPLISSUEDBAUER MECHANCIAL LLC08/12/2013
BISPLISSUEDORBIT PLBG & HTG INC07/15/2013
BISOTISSUEDPAMI CONSTRUCTION CORP07/12/2013
BISPLISSUEDKIMMEL PLUMBING08/09/2012
BISPLISSUEDAMR MECHANICAL INC09/12/2011
BISEQISSUEDSPRING ENTERPRIS INC.10/06/2000
BIS—ISSUEDRIMA 106 LP05/07/1996
BISPLISSUEDMARTINEZ PLG & HTG CO02/06/1996
BISEQISSUEDBRIDGEWORKS INC07/07/1994
1 project · most recent 05/16/2022
FiledStatusContractorScope
05/16/2022CompleteMEGA ELEC'L CONTR'G, INC—
1 project · most recent 06/01/2026
Sidewalk Shed
FiledStatusContractorScope
06/01/2026——Sidewalk Shed
1 project · most recent 06/01/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/01/2026——Suspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/01/2026MasonryRuslan Solovyevspecial
05/29/2026Tenant Protection Plan Compliance—special
04/30/2026FinalRuslan Solovyevprogress
05/17/2021MasonryRuslan Solovyevspecial
05/17/2021Air barrier - visual inspectionRuslan Solovyevenergy_progress
05/17/2021FinalRuslan Solovyevprogress
05/17/2021Energy Code Compliance InspectionsRuslan Solovyevprogress
▾Documents — 134 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026M00520174-I1Request digital key ↗
09/02/2026M00742413-I1Request digital key ↗
09/02/2026M00742413-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits21
▸BISWORK PERMIT APPLICATION11
09/29/2016122139701Open ↗
10/31/2015122416625Open ↗
10/30/2015122416625Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
10/12/2015122416625Open ↗
10/10/2015122416625Open ↗
09/29/2014122139701Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications37
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
11/17/2017140241511Open ↗
11/02/2017122416625Open ↗
11/02/2017122416625Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/02/2026M00742413-P1Open ↗
09/02/2026M00742413-I1Open ↗
09/01/2026M08052541-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026M01395740-I1Open ↗
08/25/2026M00520174-I1Open ↗
08/25/2026M00520174-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/29/2014122139701Open ↗
08/13/2012121337865Open ↗
09/16/2011120816359Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
09/29/2014122139701Open ↗
08/13/2012121337865Open ↗
09/16/2011120816359Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026M01395740-I1Open ↗
08/25/2026M00520174-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/18/2014140241511Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/18/2014140241511Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/18/2014140241511Open ↗
▸Trade Schedules & Equipment15
▸BISSELF-CERT PLUMBING NOTICE6
12/31/2013121641358Open ↗
12/17/2013121337865Open ↗
10/04/2013121337865Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING6
11/20/2013121641358Open ↗
06/25/2013121641358Open ↗
08/13/2012121337865Open ↗
Showing 3 of 6 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
01/16/2014121337865Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/29/2013121337865Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/10/2015122416625Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
10/10/2015122416625Open ↗
10/10/2015122416625Open ↗
08/13/2012121337865Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026M01395740-I1Open ↗
08/13/2026M00520174-I1Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
11/02/2017122416625Open ↗
11/02/2017122416625Open ↗
05/15/2017122139701Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections4
09/29/2014122139701Open ↗
02/05/2014121641358Open ↗
02/05/2014121641358Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/02/2017122416625Open ↗
05/15/2017122139701Open ↗
02/05/2014121641358Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/18/2014140241511Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00520174-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/18/2014140241511Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/17/2017140241511Open ↗
11/02/2017122416625Open ↗
05/15/2017122139701Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
06/25/2013121641358Open ↗
08/13/2012121337865Open ↗
09/16/2011120816359Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/07/2016140241511Open ↗
09/02/2015140241511Open ↗
▸BISSUPERSEDING LETTER1
09/05/2013121337865Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT9
11/02/2017122416625Open ↗
05/15/2017122139701Open ↗
10/10/2015122416625Open ↗
Showing 3 of 9 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
07/19/2013121641358Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET5
10/10/2015122416625Open ↗
09/29/2014122139701Open ↗
06/25/2013121641358Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
12/04/2013121641358Open ↗
10/29/2013121337865Open ↗
10/29/2013121337865Open ↗
▸BISBOROUGH INTAKE FORM2
11/17/2017140241511Open ↗
11/02/2017122416625Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/18/2014140241511Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/05/2012120816359Open ↗
03/29/2012120816359Open ↗