← Back
Office only, 7-19 stories
209 WEST 40 STREET
MANHATTAN · BIN 1024646
💬 Discuss this project
1912Year Built
7Stories
O3Building Class
M1-9A/R12Zoning
32,237 sfGross Floor Area
7Units
LL97 Covered34 Open Violations 21 unresolved · 13 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Office only, 7-19 stories · Owner of record: 211 WEST 40TH STREET, INC. · 4,938 sf lot · 6.53 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 1 filing · 2 docs
Floor 33p · 2 filings · 18 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHAH GROUP ENTERPRISES IN407/08/2026
KAJ NY CONSTRUCTION607/08/2026
211 WEST 40TH STREET3103/22/2026
211 WEST 40 ST INC403/22/2026
211 W 40TH ST. INC303/22/2026
211 W 40 STREET403/22/2026
211 WEST 40 STREET COR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC CONTRACTINGGeneral Contractor407/08/2026
KAJ NY CONSTRUCTION INCGeneral Contractor407/08/2026
PHOENIX SUTTON STR INCGeneral Contractor407/08/2026
RC3 ELECTRIC, LLCGeneral Contractor303/21/2026
UNIVERSAL CONSTRUCTIONGeneral Contractor107/08/2026
HEMANCHAL DEONARINEElectrical103/21/2026
PREMIER FLOW PLBG AND HTGPlumbing107/08/2026
RICHARD NEUElectrical103/21/2026
ROBERT MARCHISOTTOElectrical103/21/2026
HOME AIR INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
1+1 DESIGN STUDIO LLC1039104/28/2026
GREAT WALL CONSULTANT P.E5633402/18/2020
STRUCTURAL CONSULTING SER1919112/20/2019
Building Lifecycle
All (93)Filed (10)Permit Issued (11)Signed Off (3)Facade (FISP) (9)Violation (60)
06/12/2026
Cycle 9 facade report submitted
06/12/2026
Cycle 9 facade report signed — UNSAFE
06/08/2026
Signed off — Alteration
DIRECT REPLACE TWO INDOOR AIR HANDLER UNITS ON 007 AND TWO CONDENSERS. NO CHANGE IN USE, EGRESS, OCCUPANCY AND BULK.
M01381251-I1
05/26/2026
Cycle 9 facade inspection completed
05/08/2026
Permit issued — Mechanical Systems
M01381251-I1-MS
04/30/2026
Filed — Alteration
Facade Repairs Including but not limited to brick masonry repairs in kind (brick repointing and replacement); post-installed masonry anchors, lintel replacement, curtain wall repairs and coating restoration. Roof replacement & parapet reconstruction at 7
M01382835-I1
04/28/2026
Filed — Alteration
DIRECT REPLACE TWO INDOOR AIR HANDLER UNITS ON 007 AND TWO CONDENSERS. NO CHANGE IN USE, EGRESS, OCCUPANCY AND BULK.
M01381251-I1
01/16/2026
Permit issued — Sidewalk Shed
M01012604-I1-SH
07/24/2025
Cycle 9 facade report submitted
07/24/2025
Cycle 9 facade report signed — UNSAFE
07/02/2025
Cycle 9 facade inspection completed
06/30/2025
Violation issued (ECB, open)
Construction
03/07/2025
Violation issued (ECB, closed)
Construction
02/24/2025
Permit issued — Sidewalk Shed
M01012604-I1-SH
02/29/2024
Filed — Alteration
M01012604-I1
02/29/2024
Permit issued — Sidewalk Shed
M01012604-I1-SH
02/16/2024
Cycle 9 facade report submitted
02/16/2024
Cycle 9 facade report signed — UNSAFE
02/16/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/10/2024
Cycle 9 facade inspection completed
10/19/2022
Violation issued (ECB, open)
Local Law
05/18/2022
Violation issued (ECB, closed)
Elevators
04/20/2022
Signed off — Alteration
M00503201-I1
11/04/2021
Permit issued — Sidewalk Shed
M00503201-I1-SH
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/20/2021
Permit issued — Sidewalk Shed
M00503201-I1-SH
04/13/2021
Filed — Alteration
M00503201-I1
11/13/2020
Violation issued (FDNY_NOV, closed)
07/24/2020
Violation issued (ECB, closed)
Construction
07/10/2020
Signed off — Alteration
Modification to existing Verizon site. Replace 2 antennas and relocate 2 sectors (8 antennas, 8 RRH units, and 4 GPS antennas total) on roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
M00078159-I1
06/29/2020
Violation issued (ECB, closed)
Construction
06/17/2020
Violation issued (ECB, open)
Local Law
02/18/2020
Filed — Alteration
PROPOSE MECHANICAL WORK IN CONJUNCTION WITH A2 #123886786 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00285032-P1
02/18/2020
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH A2 #123886786 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00282522-P1
02/13/2020
Permit issued — Mechanical Systems
M00285032-I1-MS
01/06/2020
Permit issued — Antenna
M00078159-I1-AN
12/24/2019
Permit issued — Plumbing
M00282522-I1-PL
12/20/2019
Filed — Alteration
Modification to existing Verizon site. Replace 2 antennas and relocate 2 sectors (8 antennas, 8 RRH units, and 4 GPS antennas total) on roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
M00078159-I1
12/20/2019
Filed — Alteration
PROPOSE MECHANICAL WORK IN CONJUNCTION WITH A2 #123886786 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00285032-I1
12/19/2019
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH A2 #123886786 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00282522-I1
12/03/2019
Violation issued (ECB, open)
Local Law
09/18/2019
Permit issued — Sidewalk Shed
M00086550-I1-SH
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/22/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/30/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/16/2018
Permit issued — Sidewalk Shed
M00086550-I1-SH
10/14/2018
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE
M00086550-I1
04/05/2018
Violation issued (ECB, open)
Local Law
02/05/2018
Violation issued (ECB, open)
Construction
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/17/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/18/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/11/2017
Violation issued (FDNY_NOV, closed)
04/11/2017
Violation issued (FDNY_NOV, closed)
12/28/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/28/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHOME AIR INC05/08/2026
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC01/16/2026
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC02/24/2025
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC02/29/2024
DOB NOWSidewalk ShedSigned-offKAJ NY CONSTRUCTION INC11/04/2021
DOB NOWSidewalk ShedSigned-offKAJ NY CONSTRUCTION INC04/20/2021
DOB NOWMechanical SystemsPermit IssuedUNIVERSAL CONSTRUCTION02/13/2020
DOB NOWAntennaSigned-offRC3 ELECTRIC, LLC01/06/2020
DOB NOWPlumbingPermit IssuedGALICJA PLBG AND HTG.CORP12/24/2019
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING09/18/2019
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING10/16/2018
BISOTISSUEDUNIVERSAL CONSTRUCTION12/12/2019
BISOTISSUEDWAMO BUILDING LLC09/18/2018
BISOTISSUEDRC3 ELECTRIC, LLC12/07/2017
BISSPISSUEDRRP PLUMBING CORP10/28/2015
BISOTISSUEDBARMOR REHAB INC10/21/2015
BISPLISSUEDBARMOR REHAB INC10/21/2015
BISOTISSUEDARETE DEVELOPMENT INC08/06/2014
BISOTISSUEDARETE DEVELOPMENT INC08/02/2013
BISOTISSUEDHS VENUS CORP06/21/2013
BISSPISSUEDPREFERERED SP.02/01/2006
BISOTISSUEDARETE DEVELOPMENT, INC.01/31/2006
BISOTISSUEDICON INTERIORS INC05/17/2005
BISOTISSUEDICON INTERIORS INC05/16/2005
BISOTISSUEDGREAT WALL WOODCRAFT INC09/30/1998
BISEQISSUEDGREAT WALL WOODCRAFT INC09/30/1998
BISEQISSUEDCOLGATE SCAFFOLDING09/30/1994
BISOTISSUEDCHONGS HOME INPROVEMENT09/29/1994
1 project · most recent 02/18/2020
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/18/2020Permit IssuedUNIVERSAL CONSTRUCTIONVentilation Systems
Ventilation
Carrier 50BZN00851 8 tons · Packaged Unit ×1
1 project · most recent 02/18/2020
Water/Sanitary
FiledStatusContractorScope
02/18/2020Permit IssuedGALICJA PLBG AND HTG.CORPWater/Sanitary
5 projects · most recent 02/28/2024
General Wiring
FiledStatusContractorScope
02/28/2024Permit IssuedELPO ELECTRICAL CONTG INC—
06/12/2023Permit IssuedR.C.M. ELECTRIC CORP.—
04/13/2021Permit IssuedRICHARD NEU—
01/09/2020CompleteR & T ELECTRICAL CORPGeneral Wiring
10/16/2018Permit IssuedRICHARD NEU—
1 project · most recent 04/30/2026
Masonry
FiledStatusContractorScope
04/30/2026——Masonry
1 project · most recent 10/14/2018
Sidewalk Shed
FiledStatusContractorScope
10/14/2018Permit IssuedTOPLINE NYC CONTRACTINGSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
04/03/2026Masonry—special
04/03/2026Final—progress
04/03/2026Structural Steel - Welding—special
04/03/2026Post-installed Anchors—special
04/13/2021FinalRAFI HAMIDprogress
02/18/2020Energy Code Compliance InspectionsXiong Wei Wuprogress
02/18/2020Maintenance informationXiong Wei Wuenergy_progress
02/18/2020FinalXiong Wei Wuprogress
02/18/2020Fire-Resistance Rated ConstructionXiong Wei Wuprogress
02/18/2020Mechanical SystemsXiong Wei Wuspecial
02/18/2020Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch5
09/06/2026M00086550-I1Request digital key ↗
09/03/2026M00503201-I1Request digital key ↗
08/27/2026M01012604-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00282522-P1Request digital key ↗
09/05/2026M00282522-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00285032-I1Request digital key ↗
08/15/2026M00285032-P1Request digital key ↗
▸Applications & Permits19
▸BISWORK PERMIT APPLICATION10
12/13/2019123886786Open ↗
09/18/2018123560182Open ↗
12/08/2017121624901Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
12/03/2019123886786Open ↗
11/19/2019123886786Open ↗
09/19/2018123560182Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications33
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
11/19/2019123886786Open ↗
02/25/2019123560182Open ↗
02/25/2019123560182Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00282522-P1Open ↗
09/05/2026M00282522-I1Open ↗
09/05/2026M00078159-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026M00285032-I1Open ↗
08/28/2026M00285032-I1Open ↗
08/28/2026M00285032-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/19/2018123560182Open ↗
10/30/2015122559310Open ↗
06/24/2013121688744Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/19/2018123560182Open ↗
10/30/2015122559310Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026M00285032-I1Open ↗
08/28/2026M00285032-I1Open ↗
▸BISPC FULL REPORT1
11/14/2007110020450Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/24/2013121688744Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/30/2015122559310Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
11/19/2019123886786Open ↗
09/19/2018123560182Open ↗
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
12/04/2019123886786Open ↗
12/03/2019123886786Open ↗
09/19/2018123560182Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/05/2026M00282522-P1Open ↗
09/05/2026M00282522-I1Open ↗
08/17/2026M01381251-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/14/2007110020450Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
06/27/2013121624901Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026M00078159-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/19/2019123886786Open ↗
09/19/2018123560182Open ↗
08/17/2018121624901Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
06/27/2013121624901Open ↗
06/24/2013121688744Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/17/2018121624901Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026M00078159-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS3
06/27/2013121624901Open ↗
06/24/2013121688744Open ↗
11/14/2007110020450Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/25/2019123560182Open ↗
08/17/2018121624901Open ↗
▸BISSUPERSEDING LETTER1
12/08/2017121624901Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/15/2026M00078159-I1Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
11/19/2019123886786Open ↗
02/25/2019123560182Open ↗
09/19/2018123560182Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET5
11/19/2019123886786Open ↗
09/19/2018123560182Open ↗
10/30/2015122559310Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
02/25/2019123560182Open ↗
08/17/2018121624901Open ↗
06/19/2018121624901Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
02/10/2020123886786Open ↗
08/01/2014121624901Open ↗
07/25/2014121624901Open ↗