Office only, 7-19 stories
209 WEST 40 STREET
MANHATTAN · Midtown-Times Square · BIN 1024646
💬 Discuss this project
1912Year Built
7Stories
O3Building Class
M1-9A/R12Zoning
32,237 sfGross Floor Area
7Units
LL97 Covered34 Open Violations 21 unresolved · 13 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Office only, 7-19 stories · Owner of record: 211 WEST 40TH STREET, INC. · 4,938 sf lot · 6.53 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 1 filing · 2 docs
Floor 33p · 2 filings · 18 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHAH GROUP ENTERPRISES IN407/08/2026
KAJ NY CONSTRUCTION607/08/2026
211 WEST 40TH STREET3103/22/2026
211 WEST 40 ST INC403/22/2026
211 W 40TH ST. INC303/22/2026
211 W 40 STREET403/22/2026
211 WEST 40 STREET COR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC CONTRACTINGGeneral Contractor407/08/2026
KAJ NY CONSTRUCTION INCGeneral Contractor407/08/2026
PHOENIX SUTTON STR INCGeneral Contractor407/08/2026
RC3 ELECTRIC, LLCGeneral Contractor303/21/2026
UNIVERSAL CONSTRUCTIONGeneral Contractor107/08/2026
HEMANCHAL DEONARINEElectrical103/21/2026
PREMIER FLOW PLBG AND HTGPlumbing107/08/2026
RICHARD NEUElectrical103/21/2026
ROBERT MARCHISOTTOElectrical103/21/2026
HOME AIR INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
1+1 DESIGN STUDIO LLC1039104/28/2026
GREAT WALL CONSULTANT P.E5633402/18/2020
STRUCTURAL CONSULTING SER1919112/20/2019
Building Lifecycle
All (112)Filed (10)Permit Issued (11)Signed Off (3)Facade (FISP) (9)Violation (60)Inspection (2)Objection (6)Special Inspection (11)
07/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/12/2026
Cycle 9 facade report submitted
06/12/2026
Cycle 9 facade report signed — UNSAFE
06/08/2026
Signed off — Alteration
DIRECT REPLACE TWO INDOOR AIR HANDLER UNITS ON 007 AND TWO CONDENSERS. NO CHANGE IN USE, EGRESS, OCCUPANCY AND BULK.
M01381251-I1
06/05/2026
Objection resolved — Addressed
06/02/2026
Objection resolved — Addressed
05/26/2026
Cycle 9 facade inspection completed
05/21/2026
Objection raised — Other
05/21/2026
Objection raised — Cost
05/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2026
Permit issued — Mechanical Systems
M01381251-I1-MS
04/30/2026
Filed — Alteration
Facade Repairs Including but not limited to brick masonry repairs in kind (brick repointing and replacement); post-installed masonry anchors, lintel replacement, curtain wall repairs and coating restoration. Roof replacement & parapet reconstruction at 7
M01382835-I1
04/28/2026
Filed — Alteration
DIRECT REPLACE TWO INDOOR AIR HANDLER UNITS ON 007 AND TWO CONDENSERS. NO CHANGE IN USE, EGRESS, OCCUPANCY AND BULK.
M01381251-I1
04/03/2026
Special inspection requirement — Masonry
04/03/2026
Special inspection requirement — Final
04/03/2026
Special inspection requirement — Structural Steel - Welding
04/03/2026
Special inspection requirement — Post-installed Anchors
01/16/2026
Permit issued — Sidewalk Shed
M01012604-I1-SH
07/24/2025
Cycle 9 facade report submitted
07/24/2025
Cycle 9 facade report signed — UNSAFE
07/02/2025
Cycle 9 facade inspection completed
06/30/2025
Violation issued (ECB, open)
Construction
03/07/2025
Violation issued (ECB, closed)
Construction
02/24/2025
Permit issued — Sidewalk Shed
M01012604-I1-SH
02/29/2024
Filed — Alteration
M01012604-I1
02/29/2024
Permit issued — Sidewalk Shed
M01012604-I1-SH
02/16/2024
Cycle 9 facade report submitted
02/16/2024
Cycle 9 facade report signed — UNSAFE
02/16/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/10/2024
Cycle 9 facade inspection completed
10/19/2022
Violation issued (ECB, open)
Local Law
05/18/2022
Violation issued (ECB, closed)
Elevators
04/20/2022
Signed off — Alteration
M00503201-I1
11/04/2021
Permit issued — Sidewalk Shed
M00503201-I1-SH
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/20/2021
Permit issued — Sidewalk Shed
M00503201-I1-SH
04/13/2021
Filed — Alteration
M00503201-I1
04/13/2021
Special inspection requirement — Final
RAFI HAMID
11/13/2020
Violation issued (FDNY_NOV, closed)
07/24/2020
Violation issued (ECB, closed)
Construction
07/10/2020
Signed off — Alteration
Modification to existing Verizon site. Replace 2 antennas and relocate 2 sectors (8 antennas, 8 RRH units, and 4 GPS antennas total) on roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
M00078159-I1
06/29/2020
Violation issued (ECB, closed)
Construction
06/17/2020
Violation issued (ECB, open)
Local Law
02/18/2020
Filed — Alteration
PROPOSE MECHANICAL WORK IN CONJUNCTION WITH A2 #123886786 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00285032-P1
02/18/2020
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH A2 #123886786 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00282522-P1
02/18/2020
Special inspection requirement — Energy Code Compliance Inspections
Xiong Wei Wu
02/18/2020
Special inspection requirement — Maintenance information
Xiong Wei Wu
02/18/2020
Special inspection requirement — Final
Xiong Wei Wu
02/18/2020
Special inspection requirement — Fire-Resistance Rated Construction
Xiong Wei Wu
02/18/2020
Special inspection requirement — Mechanical Systems
Xiong Wei Wu
02/18/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
02/13/2020
Permit issued — Mechanical Systems
M00285032-I1-MS
01/06/2020
Permit issued — Antenna
M00078159-I1-AN
01/02/2020
Objection resolved — Addressed
12/24/2019
Permit issued — Plumbing
M00282522-I1-PL
12/23/2019
Objection raised — 2014-AN AC 28-104.7.1-Administ
12/20/2019
Filed — Alteration
Modification to existing Verizon site. Replace 2 antennas and relocate 2 sectors (8 antennas, 8 RRH units, and 4 GPS antennas total) on roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
M00078159-I1
12/20/2019
Filed — Alteration
PROPOSE MECHANICAL WORK IN CONJUNCTION WITH A2 #123886786 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00285032-I1
12/19/2019
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH A2 #123886786 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00282522-I1
12/03/2019
Violation issued (ECB, open)
Local Law
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHOME AIR INC05/08/2026
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC01/16/2026
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC02/24/2025
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC02/29/2024
DOB NOWSidewalk ShedSigned-offKAJ NY CONSTRUCTION INC11/04/2021
DOB NOWSidewalk ShedSigned-offKAJ NY CONSTRUCTION INC04/20/2021
DOB NOWMechanical SystemsPermit IssuedUNIVERSAL CONSTRUCTION02/13/2020
DOB NOWAntennaSigned-offRC3 ELECTRIC, LLC01/06/2020
DOB NOWPlumbingPermit IssuedGALICJA PLBG AND HTG.CORP12/24/2019
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING09/18/2019
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING10/16/2018
BISOTISSUEDUNIVERSAL CONSTRUCTION12/12/2019
BISOTISSUEDWAMO BUILDING LLC09/18/2018
BISOTISSUEDRC3 ELECTRIC, LLC12/07/2017
BISSPISSUEDRRP PLUMBING CORP10/28/2015
BISOTISSUEDBARMOR REHAB INC10/21/2015
BISPLISSUEDBARMOR REHAB INC10/21/2015
BISOTISSUEDARETE DEVELOPMENT INC08/06/2014
BISOTISSUEDARETE DEVELOPMENT INC08/02/2013
BISOTISSUEDHS VENUS CORP06/21/2013
BISSPISSUEDPREFERERED SP.02/01/2006
BISOTISSUEDARETE DEVELOPMENT, INC.01/31/2006
BISOTISSUEDICON INTERIORS INC05/17/2005
BISOTISSUEDICON INTERIORS INC05/16/2005
BISOTISSUEDGREAT WALL WOODCRAFT INC09/30/1998
BISEQISSUEDGREAT WALL WOODCRAFT INC09/30/1998
BISEQISSUEDCOLGATE SCAFFOLDING09/30/1994
BISOTISSUEDCHONGS HOME INPROVEMENT09/29/1994
1 project · most recent 02/18/2020
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/18/2020Permit IssuedUNIVERSAL CONSTRUCTIONVentilation Systems
Ventilation
Carrier 50BZN00851 8 tons · Packaged Unit ×1
1 project · most recent 02/18/2020
Water/Sanitary
FiledStatusContractorScope
02/18/2020Permit IssuedGALICJA PLBG AND HTG.CORPWater/Sanitary
5 projects · most recent 02/28/2024
General Wiring
FiledStatusContractorScope
02/28/2024Permit IssuedELPO ELECTRICAL CONTG INC—
06/12/2023Permit IssuedR.C.M. ELECTRIC CORP.—
04/13/2021Permit IssuedRICHARD NEU—
01/09/2020CompleteR & T ELECTRICAL CORPGeneral Wiring
10/16/2018Permit IssuedRICHARD NEU—
1 project · most recent 04/30/2026
Masonry
FiledStatusContractorScope
04/30/2026——Masonry
1 project · most recent 10/14/2018
Sidewalk Shed
FiledStatusContractorScope
10/14/2018Permit IssuedTOPLINE NYC CONTRACTINGSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
04/03/2026Masonry—special
04/03/2026Final—progress
04/03/2026Structural Steel - Welding—special
04/03/2026Post-installed Anchors—special
04/13/2021FinalRAFI HAMIDprogress
02/18/2020Energy Code Compliance InspectionsXiong Wei Wuprogress
02/18/2020Maintenance informationXiong Wei Wuenergy_progress
02/18/2020FinalXiong Wei Wuprogress
02/18/2020Fire-Resistance Rated ConstructionXiong Wei Wuprogress
02/18/2020Mechanical SystemsXiong Wei Wuspecial
02/18/2020Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch5
09/06/2026M00086550-I1Request digital key ↗
09/03/2026M00503201-I1Request digital key ↗
08/27/2026M01012604-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00282522-P1Request digital key ↗
09/05/2026M00282522-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00285032-I1Request digital key ↗
08/15/2026M00285032-P1Request digital key ↗
▸Applications & Permits19
▸BISWORK PERMIT APPLICATION10
12/13/2019123886786Open ↗
09/18/2018123560182Open ↗
12/08/2017121624901Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
12/03/2019123886786Open ↗
11/19/2019123886786Open ↗
09/19/2018123560182Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications33
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
11/19/2019123886786Open ↗
02/25/2019123560182Open ↗
02/25/2019123560182Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00282522-P1Open ↗
09/05/2026M00282522-I1Open ↗
09/05/2026M00078159-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026M00285032-I1Open ↗
08/28/2026M00285032-I1Open ↗
08/28/2026M00285032-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/19/2018123560182Open ↗
10/30/2015122559310Open ↗
06/24/2013121688744Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/19/2018123560182Open ↗
10/30/2015122559310Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026M00285032-I1Open ↗
08/28/2026M00285032-I1Open ↗
▸BISPC FULL REPORT1
11/14/2007110020450Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/24/2013121688744Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/30/2015122559310Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
11/19/2019123886786Open ↗
09/19/2018123560182Open ↗
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
12/04/2019123886786Open ↗
12/03/2019123886786Open ↗
09/19/2018123560182Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/05/2026M00282522-P1Open ↗
09/05/2026M00282522-I1Open ↗
08/17/2026M01381251-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/14/2007110020450Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
06/27/2013121624901Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026M00078159-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/19/2019123886786Open ↗
09/19/2018123560182Open ↗
08/17/2018121624901Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
06/27/2013121624901Open ↗
06/24/2013121688744Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/17/2018121624901Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026M00078159-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS3
06/27/2013121624901Open ↗
06/24/2013121688744Open ↗
11/14/2007110020450Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/25/2019123560182Open ↗
08/17/2018121624901Open ↗
▸BISSUPERSEDING LETTER1
12/08/2017121624901Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/15/2026M00078159-I1Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
11/19/2019123886786Open ↗
02/25/2019123560182Open ↗
09/19/2018123560182Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET5
11/19/2019123886786Open ↗
09/19/2018123560182Open ↗
10/30/2015122559310Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
02/25/2019123560182Open ↗
08/17/2018121624901Open ↗
06/19/2018121624901Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
02/10/2020123886786Open ↗
08/01/2014121624901Open ↗
07/25/2014121624901Open ↗