2092 GRAND CONCOURSE
BRONX · Mount Hope · BIN 2130943
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R8Zoning
0 sfGross Floor Area
0Units
4 Open Violations 1 unresolved · 3 paperwork only ▸
Zoned commercial or Manhattan residential · Owner of record: 2092 GC REALTY LLC · 14,882 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Roof11p · 1 filing · 12 docs
Floor 111p · 1 filing · 12 docs
Mezzanine11p · 1 filing · 12 docs
Cellar11p · 1 filing · 12 docs
Site & exterior6p · 2 filings · 4 docs
Filed — no permit issued18p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ESQUIRE MANAGEMENT1804/09/2026
ACE GROUP NY404/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/29/2025$9.4M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILD-TECH PROFESSIONALS CORP.103/21/2026
EXPEDITE DEM403/21/2026
4444 PPPP CORP803/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STATE CONTRACTING CORP NYGeneral Contractor404/09/2026
ACE GROUP NY CORPGeneral Contractor104/09/2026
SKF GENERAL CONTRACTORS,General Contractor107/08/2026
METROPOLITAN PLBG AND HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
H & O ENGINEERING, DPC5595107/20/2023
BAZINI ENGINEERING, P.C.1808305/06/2021
Building Lifecycle
All (69)Filed (11)Permit Issued (4)Signed Off (3)Objection (23)Special Inspection (28)
02/06/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00847668-I1
08/05/2024
Filed — New Building
subsequent document filed for sprinkler and standpipe work type in conjunction with NB General Construction application
X00998928-S7
07/01/2024
Objection resolved — Addressed
06/28/2024
Objection raised — C/O of existing property requi
06/26/2024
Filed — New Building
subsequent document filed for sprinkler and standpipe work type in conjunction with NB General Construction application
X00998928-P1
06/10/2024
Special inspection requirement — Air barrier — testing
06/10/2024
Special inspection requirement — Electrical motors and elevators
06/10/2024
Special inspection requirement — Fenestration areas
06/10/2024
Special inspection requirement — Fenestration air leakage
06/10/2024
Special inspection requirement — Lighting controls
06/10/2024
Special inspection requirement — Insulation placement and R values
06/10/2024
Special inspection requirement — Vestibules
06/10/2024
Special inspection requirement — Lighting in dwelling units
06/10/2024
Special inspection requirement — Air barrier - visual inspection
06/10/2024
Special inspection requirement — Metering
06/10/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
06/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/10/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
06/10/2024
Special inspection requirement — Energy Code Compliance Inspections
06/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
06/10/2024
Special inspection requirement — Interior lighting power
06/10/2024
Special inspection requirement — Air barrier continuity plan testing
06/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
06/10/2024
Special inspection requirement — Exterior lighting power
04/16/2024
Special inspection requirement — Standpipe Systems
04/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/16/2024
Special inspection requirement — Sprinkler Systems
03/26/2024
Objection resolved — Addressed
03/26/2024
Objection resolved — Addressed
03/21/2024
Objection raised — Admin
03/21/2024
Objection raised — Admin
03/14/2024
Objection resolved — Addressed
03/13/2024
Objection raised — Admin
03/04/2024
Objection raised — Other
03/04/2024
Objection resolved — Addressed
03/04/2024
Objection resolved — Addressed
03/04/2024
Objection resolved — Addressed
03/01/2024
Filed — New Building
subsequent document filed for sprinkler and standpipe work type in conjunction with NB General Construction application
X00998928-S1
02/27/2024
Objection raised — Admin
02/27/2024
Objection raised — Energy
02/27/2024
Objection raised — Cost
02/26/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
02/15/2024
Filed — New Building
subsequent document filed for sprinkler and standpipe work type in conjunction with NB General Construction application
X00998928-I1
12/06/2023
Signed off — Alteration
X00840252-I1
09/19/2023
Signed off — Full Demolition
full demolition under DOB IED Control #341122
X00840190-I1
08/23/2023
Permit issued — Full Demolition
X00840190-I1-FD
07/31/2023
Permit issued — Construction Fence
X00840252-I1-FN
07/27/2023
Filed — Alteration
X00840252-I1
07/27/2023
Objection raised — Admin
07/27/2023
Objection resolved — Addressed
07/20/2023
Filed — Full Demolition
full demolition under DOB IED Control #341122
X00840190-I1
05/02/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00847668-I1
05/02/2023
Permit issued — Sidewalk Shed
X00847668-I1-SH
03/15/2023
Special inspection requirement — Structural Stability – Alterations of existing Buildings
SANTIAGO HELMAN
03/15/2023
Special inspection requirement — Demolition
SANTIAGO HELMAN
07/20/2021
Objection raised — Structural
07/20/2021
Objection raised — Structural
07/20/2021
Objection raised — Other
07/20/2021
Objection raised — Admin
07/20/2021
Objection raised — Inspections
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offSTATE CONTRACTING CORP NY08/23/2023
DOB NOWConstruction FenceSigned-offSTATE CONTRACTING CORP NY07/31/2023
DOB NOWSidewalk ShedSigned-offACE GROUP NY CORP05/02/2023
DOB NOWPlumbingPermit IssuedMETROPOLITAN PLBG AND HTG03/12/2021
1 project · most recent 08/05/2024
Sprinkler System
FiledStatusContractorScope
08/05/2024——Sprinkler System
2 projects · most recent 07/12/2021
Plumbing-Sprinkler Water/Sanitary Gas
FiledStatusContractorScope
07/12/2021——Plumbing-Sprinkler, Water/Sanitary
05/06/2021Permit IssuedMETROPOLITAN PLBG AND HTGGas
3 projects · most recent 03/14/2023
FiledStatusContractorScope
03/14/2023Permit IssuedHIGH QUALITY ELECTRIC OF—
11/17/2019CompleteALL CITY ELECTRICAL INC—
05/31/2018CompleteALL CITY ELECTRICAL INC—
1 project · most recent 08/05/2024
Steel Concrete
FiledStatusContractorScope
08/05/2024——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
06/10/2024Air barrier — testing —energy_progress
06/10/2024Electrical motors and elevators—energy_progress
06/10/2024Fenestration areas—energy_progress
06/10/2024Fenestration air leakage—energy_progress
06/10/2024Lighting controls—energy_progress
06/10/2024Insulation placement and R values—energy_progress
06/10/2024Vestibules—energy_progress
06/10/2024Lighting in dwelling units—energy_progress
06/10/2024Air barrier - visual inspection—energy_progress
06/10/2024Metering—energy_progress
06/10/2024Exterior Insulation and Finish Systems (EIFS)—special
06/10/2024Fire-Resistant Penetrations and Joints—special
06/10/2024Wall Panels, Curtain Walls, and Veneers—special
06/10/2024Energy Code Compliance Inspections—progress
06/10/2024Fire-Resistance Rated Construction—progress
06/10/2024Interior lighting power—energy_progress
06/10/2024Air barrier continuity plan testing—energy_progress
06/10/2024Fenestration and door U-factor and product ratings—energy_progress
06/10/2024Exterior lighting power—energy_progress
04/16/2024Standpipe Systems—special
04/16/2024Fire-Resistant Penetrations and Joints—special
04/16/2024Sprinkler Systems—special
02/26/2024Excavations - Sheeting, Shoring, and Bracing—special
03/15/2023Structural Stability – Alterations of existing BuildingsSANTIAGO HELMANspecial
03/15/2023DemolitionSANTIAGO HELMANspecial
Latest 25 of 28.
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch4
08/23/2026X00847668-I1Request digital key ↗
08/22/2026X00840190-I1Request digital key ↗
08/22/2026X00840252-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026X00467967-I1Request digital key ↗
08/25/2026X00467967-P2Request digital key ↗
08/15/2026X00467967-P1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026X00467967-I1Open ↗
08/25/2026X00467967-P1Open ↗
08/25/2026X00542909-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026X00840190-I1Open ↗
08/26/2026X00840190-I1Open ↗
08/23/2026X00467967-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/31/2026X00998928-S5Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWSewer Cut-Off1
08/13/2026X00840190-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X00840190-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X00840190-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X00840190-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026X00467967-P1Open ↗
08/25/2026X00467967-I1Open ↗
08/15/2026X00542909-I1Open ↗
Showing 3 of 4 on file for this type