BRONX
Lambert Houses
2094 BOSTON ROAD · BIN 2013283
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
LL97 CoveredRent Stabilized46 Open Violations ▸FISP: No Report FiledFDNY Report ↗
Flood zone X
Locations of Work
StructuralMechanical
Roof2p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PHIPPS HOUSE SERVICE2607/08/2026
ALBA SERVICES407/08/2026
OWNERS REP807/08/2026
UNITED CONCRETE LLC103/22/2026
BOSTON TREMONT HOUSING DEVELOPME1103/22/2026
MONADNOCK CONSTRUCTION503/22/2026
PHIPPS HOUSING SERVICES103/22/2026
REILLY MORTGAGE ASSOCI103/22/2026
SOLAR ENERGY SYSTEMS103/22/2026
COLGATE ENTERPRISES303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2021$10.5M—BOSTON TREMONT HOUSING DEVELOPMENT FUND CORP → 2080 BOSTON ROAD HOUSING DEVELOPMENT FUND CORP— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PLAN B ENGINEERING411/17/2022
PAUL PERDEK, PROF. ENG. PLLC306/17/2022
HANSEN ENGINEERING, PC112/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EUROCELT EXPEDITING, INC803/21/2026
AE DESIGN SOLUTION603/21/2026
JM ZONING, LLC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATFORM SOLUTIONS, INCGeneral Contractor1507/08/2026
MONADNOCK GEN'L CONT INCGeneral Contractor1203/21/2026
MONADNOCK CONSTRUCTION INGeneral Contractor1107/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1007/08/2026
RO-SAL PLBG HTG INCFire Protection607/08/2026
RO-SAL PLUMBING & HTG INC INC.Plumbing407/08/2026
ALBA SERVICES INCGeneral Contractor307/08/2026
ANTONIO CERIELLO ELEC INCElectrical103/22/2026
PARISI, DINOElectrical103/21/2026
NYC TRANSITElectrical103/21/2026
MAHRAJ, MOHAMMADElectrical103/21/2026
HERMAN, LAWRENCEElectrical103/21/2026
Building Lifecycle
All (140)Filed (8)Permit Issued (34)Signed Off (8)Facade (FISP) (7)Violation (60)Inspection (19)Objection (2)Special Inspection (2)
07/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2024
Signed off — Alteration
INSTALL CONSTRUCTION FENCE IN CONJUNCTION WITH NB#S 210180864 AND 210181426.
X00648570-I1
03/07/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/07/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/06/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/22/2023
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
12/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/01/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00758527-I1
11/22/2023
Signed off — Alteration
INSTALLATION OF A LOADING DOCK FOR THE CONSTRUCTION HOISTS (A&B) AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. LOADING DOCKS TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
X08041857-I1
11/21/2023
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK BRIDGE AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION PARTIALLY INSTALLED IN THE ROADWAY. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK BRIDGE TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00725877-I1
11/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/27/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/27/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/24/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/29/2023
Inspection — Pass-Final SD - More than 10 Requested Floors
Pass
View inspection ↗
09/12/2023
Signed off — Alteration
INSTALLATION OF A P/M HOIST COMPLEX (A) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOIST TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00744478-I1
09/12/2023
Signed off — Alteration
INSTALLATION OF A P/M HOIST COMPLEX (B) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOIST TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00744510-I1
09/12/2023
Inspection — Pass-Final SD - More than 10 Requested Floors
Pass
View inspection ↗
09/06/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/04/2023
Permit issued — Mechanical Systems
X00342725-I1-MS
08/03/2023
Permit issued — Structural
X00342740-I1-ST
08/02/2023
Permit issued — Construction Fence
X00648570-I1-FN
08/02/2023
Permit issued — Earth Work
X00826838-I1-EA
07/26/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/07/2023
Permit issued — Earth Work
X00826838-I1-EA
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Permit issued — Plumbing
X08038236-I1-PL
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/05/2023
Permit issued — Supported Scaffold
X00758527-I1-SF
05/30/2023
Permit issued — Standpipe
X00446953-I1-EW-SD
05/12/2023
Permit issued — Protection and Mechanical Methods
X00744510-I1-PM
05/12/2023
Permit issued — Protection and Mechanical Methods
X00744478-I1-PM
05/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/10/2023
Permit issued — Sprinklers
X00448247-I1-EW-SP
04/07/2023
Permit issued — Standpipe
X00448247-I1-EW-SD
04/06/2023
Permit issued — Sidewalk Shed
X00725877-I1-SH
04/04/2023
Permit issued — Structural
X00342740-I1-ST
04/04/2023
Permit issued — Mechanical Systems
X00342725-I1-MS
03/08/2023
Permit issued — Boiler Equipment
X00757610-I1-BE
02/21/2023
Permit issued — Plumbing
X00342750-I1-PL
11/23/2022
Permit issued — Construction Fence
X00648570-I1-FN
11/18/2022
Permit issued — Protection and Mechanical Methods
X08041857-I1-PMM
11/17/2022
Filed — Alteration
INSTALLATION OF A LOADING DOCK FOR THE CONSTRUCTION HOISTS (A&B) AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. LOADING DOCKS TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
X08041857-I1
11/17/2022
Violation issued (ECB, closed)
Unknown
10/17/2022
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/17/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00758527-I1
06/17/2022
Permit issued — Supported Scaffold
X00758527-I1-SF
06/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/31/2022
Permit issued — Standpipe
X00446953-I1-EW-SD
05/27/2022
Permit issued — Protection and Mechanical Methods
X00744478-I1-PM
05/25/2022
Permit issued — Protection and Mechanical Methods
X00744510-I1-PM
05/24/2022
Filed — Alteration
INSTALLATION OF A P/M HOIST COMPLEX (A) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOIST TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00744478-I1
05/24/2022
Filed — Alteration
INSTALLATION OF A P/M HOIST COMPLEX (B) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOIST TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
X00744510-I1
05/06/2022
Violation issued (ECB, closed)
Cranes and Derricks
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMONADNOCK GEN'L CONT INC08/04/2023
DOB NOWStructuralSigned-offMONADNOCK GEN'L CONT INC08/03/2023
DOB NOWConstruction FenceSigned-offMONADNOCK GEN'L CONT INC08/02/2023
DOB NOWEarth WorkSigned-offMONADNOCK GEN'L CONT INC08/02/2023
DOB NOWEarth WorkSigned-offMONADNOCK CONSTRUCTION IN07/07/2023
DOB NOWPlumbingSigned-offRO-SAL PLUMBING & HTG INC06/20/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC06/05/2023
DOB NOWStandpipeSigned-offRO-SAL PLBG HTG INC05/30/2023
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC05/12/2023
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC05/12/2023
DOB NOWSprinklersSigned-offRO-SAL PLBG HTG INC04/10/2023
DOB NOWStandpipeSigned-offRO-SAL PLBG HTG INC04/07/2023
DOB NOWSidewalk ShedSigned-offPLATFORM SOLUTIONS, INC04/06/2023
DOB NOWStructuralSigned-offMONADNOCK CONSTRUCTION IN04/04/2023
DOB NOWMechanical SystemsSigned-offMONADNOCK CONSTRUCTION IN04/04/2023
DOB NOWBoiler EquipmentSigned-offRO-SAL PLUMBING & HTG INC03/08/2023
DOB NOWPlumbingSigned-offRO-SAL PLUMBING & HTG INC02/21/2023
DOB NOWConstruction FenceSigned-offMONADNOCK CONSTRUCTION IN11/23/2022
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC11/18/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC06/17/2022
DOB NOWStandpipeSigned-offRO-SAL PLBG HTG INC05/31/2022
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC05/27/2022
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC05/25/2022
DOB NOWStructuralSigned-offMONADNOCK CONSTRUCTION IN04/28/2022
DOB NOWSidewalk ShedSigned-offPLATFORM SOLUTIONS, INC04/28/2022
DOB NOWMechanical SystemsSigned-offMONADNOCK CONSTRUCTION IN04/22/2022
DOB NOWSprinklersSigned-offRO-SAL PLBG HTG INC04/08/2022
DOB NOWStandpipeSigned-offRO-SAL PLBG HTG INC04/07/2022
DOB NOWPlumbingSigned-offRO-SAL PLUMBING & HTG INC02/28/2022
DOB NOWConstruction FenceSigned-offMONADNOCK CONSTRUCTION IN12/28/2021
DOB NOWConstruction FenceSigned-offALBA SERVICES INC04/05/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC02/25/2021
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC02/24/2021
DOB NOWConstruction FenceSigned-offALBA SERVICES INC02/24/2021
BIS—ISSUEDALBA SERVICES INC07/23/2021
BISEQISSUEDALBA SERVICES INC07/15/2021
BISOTISSUEDTITAN CONSTRUCTION SERVIC08/12/2013
BISEQISSUEDCOLGATE ENTERPRISE CORP02/27/2013
2 projects · most recent 09/01/2022
FiledStatusContractorScope
09/01/2022CompleteCORPORATE ELEC. GROUP INC—
02/10/2021CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
07/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/07/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/22/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/24/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2023Pass-Final SD - More than 10 Requested FloorsPassView ↗
09/12/2023Pass-Final SD - More than 10 Requested FloorsPassView ↗
09/06/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/26/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/17/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
06/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
02/19/2021FinalPaul Perdekprogress
02/19/2021FinalPaul Perdekprogress
▾Documents — 101 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/25/2026X00473673-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/25/2026X00473679-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/23/2026X08041857-I1Request digital key ↗
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION15
04/01/2024210077101Open ↗
04/01/2024200811265Open ↗
04/01/2024220238678Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION4
07/29/2021220735159Open ↗
07/29/2021220735159Open ↗
08/16/2013220321195Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications23
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
07/29/2021220735159Open ↗
08/14/2018220254837Open ↗
08/14/2018220254837Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026X00473679-I1Open ↗
08/23/2026X08041857-I1Open ↗
08/13/2026X00744510-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/10/2018220254837Open ↗
06/26/2013220321195Open ↗
02/27/2013220254837Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/26/2013220321195Open ↗
02/27/2013220254837Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X00473679-I1Open ↗
08/25/2026X00473673-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/10/2018220254837Open ↗
▸Safety & Tenant Protection2
▸BISANTI-HARASSMENT CHECKLIST1
07/28/2021220735159Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/28/2021220735159Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/28/2021220735159Open ↗
06/26/2013220321195Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/06/2008210077101Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/12/2011220144617Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/26/2013220321195Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/04/2014220321195Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/12/2011220144617Open ↗
▸Approvals, Objections & Sign-offs31
▸BISLETTERS - SUPPORTING DOCUMENTATION17
07/29/2021220735159Open ↗
07/29/2021220735159Open ↗
07/28/2021220735159Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026X00473679-I1Open ↗
08/13/2026X08041857-I1Open ↗
08/13/2026X00744510-I1Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
02/27/2013220254837Open ↗
10/23/2012220238678Open ↗
10/12/2011220144617Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/14/2018220254837Open ↗
06/04/2015220321195Open ↗
02/04/2014220321195Open ↗
▸BISLANDMARKS APPROVAL1
07/29/2021220735159Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT5
02/04/2014220321195Open ↗
01/16/2014220321195Open ↗
06/26/2013220321195Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
07/28/2021220735159Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
07/28/2021220735159Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET5
10/21/2020220735159Open ↗
06/26/2013220321195Open ↗
02/27/2013220254837Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION2
08/10/2018220254837Open ↗
01/16/2014220321195Open ↗
▸BISBOROUGH INTAKE FORM1
08/14/2018220254837Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/07/2008210077101Open ↗