ECB05/01/2026DURING INSPECTION OF AN ACTIVE PROPOSED 10-STORY NB, AND UPON REVIEWING DOB RECORDS, IT WAS REVEALED TO ME THAT THE PRIMARY SITE SAFETY STAKEHOLDER WAS ACTIVE ON MULTIPLE JOB SITES. STOP ALL WORK UNDER APPLICAT$3K due
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB03/06/2023EMER WORK.BLDG SUFFRD A 5-ALARM FIRE ON3/5/23&SUSTAINEDSEVERE STRCTRL DMGE.ENTRE ROOD CLLPSD W/SOME UNSTBLE STEEL FRMINGREMAINING PRTLLY CLLPSD.RMAINING MSONRY WALLS UNBRACED W/AREAS OF DMGE.1.IMMED INTALL TGHTBOARD FENCE@EXP1TO CLOSE SDEWALK/SERVICE ROAD ON GRAND CONCOURSE& @EXP3 TO CLOSE OFF PRKING LANE@ANT
DOB03/06/2023EMER WORK.BLDG SUFFRD A5-ALARM FIRE ON 3/5/23&SUSTAINED SEVERE STRCTRL DAMAGE.THERE'S A PARTY WALL@EXP2(NORTH)&INDEPENDENTWALL@EXP4 WAS DMGD BY STEEL FRMNG CLLPSES.PERMITER WALLS UNBRACD.1.IMMED FULLY DEMO BLDG UNDR DRCT SPRVSN&DRECTION OF ONSITE PE STRCTRL ENGNEER W/ALL WRK PRFRMD BY DEMO ENDRSD CNTRCTR
DOB03/05/2023STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE AND FIRE FIGHTING OPERATION - FULL VACATE DUE TO A FIRE WITH TOTAL COLLAPSE OF THE ROOF
DOB12/15/2022FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
ECB05/23/2026AT THE TIME OF INSPECTION, I OBSERVED PEDESTRIAN WALKWAY WAS NOT MAINTAINED IN ACCORDANCE WITH BC 3307.2.6 IN THAT THE REQUIRED 5-FOOT CLEAR PATH WAS OBSTRUCTED WITH PLASTIC JERSEY BARRIERS, CREATING A HAZARDOUHearing held — result not yet published$2K proposed
ECB05/23/2026AT THE TIME OF INSPECTION, AT AN 10-STORY PROPOSED NB. PLASTIC JERSEY BARRIERS PLACED IN THE ROADWAY WERE NOT IN ACCORDANCE WITH BC 3301.1.3 BARRIERS WERE NOT PROPERLY INTERLOCK OR FILLED WITH WATER OR SAND, CRHearing held — result not yet published$2K proposed
ECB03/13/20251RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECEIVED A RETAINING WALL CONDITION ASSESSNothing owed — awaiting certificate of correction
Zoned commercial or Manhattan residential · Owner of record: 2092 GC REALTY LLC · 14,882 sf lot · 0 FAR built · Flood zone X