← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2095 CRUGER AVENUE
BRONX · BIN 2048793
💬 Discuss this project
1939Year Built
6Stories
D1Building Class
R7-1Zoning
53,400 sfGross Floor Area
42Units
LL97 CoveredRent Stabilized14 Active Violations 12 unresolved · 2 paperwork only ▸FISP: UNSAFE
Elevator apt, semi-fireproof without stores · Owner of record: Emerald 2095 Cruger · 10,000 sf lot · 5.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSuspended scaffold installation1p · 2 filings · 7 docs
Site & exteriorFacade repairs and window frame replacementUnder Construction21p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Emerald 2095 Cruger103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Urban Integrations109/12/2025
Rigid Structural Design108/21/2025
Aaxd108/20/2025
AP Professional Engineering105/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design603/21/2026
Sandeep Kaur103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Apex Group NYScaffold510/29/2026
Canido Basonas Construction ServiceGeneral Contractor311/13/2026
High Quality ElectricElectrical103/21/2026
Canido Basonas Construction ServiceScaffold104/09/2026
M.S.S. ConstructionGeneral Contractor105/01/2009
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Concrete Testing and I6252108/20/2025
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 10, sub-cycle B)
The filing window opened 02/21/2026. 1 Cycle 10 filing on record, latest 07/02/2025, status Unsafe
11/13/2026
Signed off — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
X01285979-I1
11/12/2026
Permit renewed — General Construction
Renewed without changes
X01272008-I1-GC
10/28/2026
Permit renewed — Sidewalk Shed
Renewed without changes
X01233597-I1-SH
08/21/2026
Permit expired, never signed off — Supported Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
X01268500-I1-SF
224 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCanido Basonas Construction Service11/12/2026
DOB NOWSidewalk ShedPermit IssuedApex Group NY10/28/2026
DOB NOWSidewalk ShedPermit IssuedApex Group NY08/10/2026
DOB NOWSidewalk ShedPermit IssuedApex Group NY05/15/2026
DOB NOWSidewalk ShedPermit IssuedApex Group NY02/17/2026
DOB NOWSuspended ScaffoldSigned-offCanido Basonas Construction02/12/2026
DOB NOWGeneral ConstructionPermit IssuedCanido Basonas Construction Service11/17/2025
DOB NOWGeneral ConstructionPermit IssuedCanido Basonas Construction Service09/16/2025
DOB NOWSuspended ScaffoldSigned-offCanido Basonas Construction09/15/2025
DOB NOWSuspended ScaffoldSigned-offCanido Basonas Construction08/26/2025
DOB NOWSupported ScaffoldPermit IssuedCanido Basonas Construction Service08/21/2025
DOB NOWSidewalk ShedPermit IssuedApex Group NY06/02/2025
BISEQISSUEDM.S.S. Construction05/01/2009
1 project · most recent 06/02/2025
FiledStatusContractorScope
06/02/2025Permit IssuedHigh Quality Electric of NYC—
2 projects · most recent 08/21/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/21/2025Permit IssuedCanido Basonas Construction ServiceScaffold
05/30/2025Permit IssuedApex Group NYSidewalk Shed
2 projects · most recent 09/12/2025
Suspended Scaffold Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/12/2025Signed-offCanido Basonas ConstructionSuspended Scaffold
08/20/2025Permit IssuedCanido Basonas Construction ServiceTenant Protection Plan 72 Hour
1 project · most recent 09/12/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/12/2025Signed-offCanido Basonas ConstructionSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/14/2025MasonryINDARDEO PARBHUNATHspecial
08/14/2025Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
08/14/2025FinalDAMIR RAHMANprogress
32 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account