← Back
BuildNYC
Over six families without stores
21-06 LINDEN STREET
QUEENS · Ridgewood · BIN 4083464
💬 Discuss this project
1930Year Built
4Stories
C1Building Class
R6BZoning
14,300 sfGross Floor Area
24Units
Rent Stabilized0 Active Violations
Over six families without stores · Owner of record: Mundus Realty Corp % Werba Property Management · 4,864 sf lot · 2.94 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDecommission existing telecom site and remove equipment3p · 2 filings · 9 docs
Floor 1Boiler replacement and gas piping1p · 1 filing · 20 docs
CellarBoiler replacement and gas piping2p · 1 filing · 20 docs
BasementDecommission existing telecom site and remove equipment2p · 1 filing · 6 docs
Sub-BasementDecommission existing telecom site and remove equipment1 filing · 6 docs
Site & exteriorDecommission existing telecom site and remove equipment1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mundus Realty1203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMB Design Group304/12/2023
Hugh Chrysler Engineering Co405/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Hugh Chrysler Engineering803/21/2026
Construction Permit Services303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Squan Construction ServicesGeneral Contractor707/08/2026
Garofalo Master P&HPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMB Design Group513304/12/2023
Hugh Chrysler Engineering4251405/18/2022
Building Lifecycle
08/10/2026
Boiler inspection report filed
Initial · no defects · Accepted
09/04/2025
Boiler inspection report filed
Initial · no defects · Accepted
03/06/2025
§ 53, 187, 231 m/d law and department rules and regulations. Provide a stop at top of guide rods so as to prevent removal of dropladder building…
HPD violation · closed
03/06/2025
§ 27-2005 ADM code fire escape defective. Replace with new the broken, defective and/or missing gusset plate from top front rail to top return rail…
HPD violation · closed
03/06/2025
§ 27-2005 ADM code fire escape defective. Adjust the dropladder so that it will slide easily in the guide rods building south at fire escape
HPD violation · closed
69 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offSquan Construction Services09/28/2022
DOB NOWPlumbingSigned-offGarofalo Master P&H08/02/2021
DOB NOWBoiler EquipmentSigned-offGarofalo Master P&H08/02/2021
DOB NOWAntennaSigned-offSquan Construction Services01/22/2020
DOB NOWAntennaSigned-offSquan Construction Services04/16/2019
DOB NOWAntennaSigned-offSquan Construction Services10/01/2018
BISOTISSUEDKlem Tech Construction05/12/2017
BISOTISSUEDAllform Construction06/26/2012
BISEQISSUEDEverest Scaffolding06/25/2012
BISEQISSUEDEverest Scaffolding06/22/2012
BISOTISSUEDRamapo Communication01/15/2010
BISCCISSUEDPea02/27/2002
BISPLISSUEDJ Jekowsky & Sons02/26/1998
BISBLISSUEDJ Jekowsky & Sons02/26/1998
1 project · most recent 10/05/2021
Boiler Controls
FiledStatusContractorScope
10/05/2021CompleteDelta Phase ElectricalBoiler Controls
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/06/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/19/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/20/2022Fire-Resistant Penetrations and JointsHUGH CHRYSLERspecial
05/20/2022HVAC-R and service water heating equipmentHUGH CHRYSLERenergy_progress
05/20/2022HVAC-R and service water heating system controlsHUGH CHRYSLERenergy_progress
05/20/2022Energy Code Compliance InspectionsHUGH CHRYSLERprogress
05/13/2022Fire-Resistant Penetrations and JointsHUGH CHRYSLERspecial
05/13/2022Energy Code Compliance InspectionsHUGH CHRYSLERprogress
05/13/2022HVAC-R and service water heating equipmentHUGH CHRYSLERenergy_progress
05/13/2022HVAC-R and service water heating system controlsHUGH CHRYSLERenergy_progress
04/21/2022Heating SystemsHUGH CHRYSLERspecial
04/21/2022HVAC-R and service water heating equipmentHUGH CHRYSLERenergy_progress
04/21/2022HVAC-R and service water heating system controlsHUGH CHRYSLERenergy_progress
04/21/2022Fire-Resistant Penetrations and JointsHUGH CHRYSLERspecial
04/20/2022Fire-Resistant Penetrations and JointsHUGH CHRYSLERspecial
04/20/2022Heating SystemsHUGH CHRYSLERspecial
04/20/2022HVAC-R and service water heating system controlsHUGH CHRYSLERenergy_progress
04/20/2022HVAC-R and service water heating equipmentHUGH CHRYSLERenergy_progress
101 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account