← Back
Predominantly retail with other uses
21-08 COLLEGE POINT BOULEVARD
QUEENS · BIN 4623780
💬 Discuss this project
2024Year Built
2Stories
K4Building Class
R5BZoning
2,976 sfGross Floor Area
1Units
0 Open Violations
Predominantly retail with other uses · Owner of record: 21-02 USA, LLC · 2,997 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionCivilGeneral
Roof3p · 2 filings · 11 docs
Floor 168p · 1 filing · 20 docs
Mezzanine67p · 2 filings · 20 docs
Cellar65p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
21-02 USA1209/13/2026
CTI CONSTRUCTION803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT1107/22/2026
AGT ARCHITECTURE P.C.208/04/2025
Alan Yang Architecture DPC107/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEADING GREEN ENERGY CONSTRUCTION103/21/2026
FANG ARCHITECT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CTI CONSTRUCTION INCGeneral Contractor1407/08/2026
LEADING GREEN ENERGY CONGeneral Contractor303/21/2026
TRI STATE PLBG & HTG INCPlumbing307/08/2026
A.C. MORGAN ELECTRICElectrical103/22/2026
RRP PLUMBING CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A & T DESIGN GROUP LLC10881107/22/2026
TRIANGLE INSPECTION & TES7495208/04/2025
ALAN YANG ARCHITECTURE9490107/16/2025
Building Lifecycle
All (85)Filed (14)Permit Issued (16)Signed Off (6)Violation (9)Inspection (10)Special Inspection (30)
07/30/2026
Special inspection requirement — Shutoff dampers
ROBERT LIN
07/30/2026
Special inspection requirement — Metering
ROBERT LIN
07/30/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ROBERT LIN
07/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
ROBERT LIN
07/30/2026
Special inspection requirement — Fenestration air leakage
ROBERT LIN
07/30/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT LIN
07/30/2026
Special inspection requirement — Masonry
ROBERT LIN
07/30/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ROBERT LIN
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT LIN
07/30/2026
Special inspection requirement — Air barrier — testing
ROBERT LIN
07/30/2026
Special inspection requirement — Lighting controls
ROBERT LIN
07/30/2026
Special inspection requirement — Maintenance information
ROBERT LIN
07/30/2026
Special inspection requirement — Fenestration areas
ROBERT LIN
07/30/2026
Special inspection requirement — Exterior lighting power
ROBERT LIN
07/30/2026
Special inspection requirement — Heating Systems
ROBERT LIN
07/30/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ROBERT LIN
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT LIN
07/30/2026
Special inspection requirement — Mechanical Systems
ROBERT LIN
07/30/2026
Special inspection requirement — Footing and Foundation
ROBERT LIN
07/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
ROBERT LIN
07/30/2026
Special inspection requirement — Final
ROBERT LIN
07/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT LIN
07/30/2026
Special inspection requirement — Concrete - Cast-In-Place
ROBERT LIN
07/30/2026
Special inspection requirement — Protection of exposed foundation insulation
ROBERT LIN
07/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
ROBERT LIN
07/30/2026
Special inspection requirement — Interior lighting power
ROBERT LIN
07/30/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ROBERT LIN
07/30/2026
Special inspection requirement — Insulation placement and R values
ROBERT LIN
07/22/2026
Filed — New Building
PROPOSED A NEW ATTACHED 1-STORY COMMERCIAL BUILDING
Q00561457-P5
05/13/2026
Filed — New Building
PROPOSED A NEW ATTACHED 1-STORY COMMERCIAL BUILDING
Q00561457-P4
03/13/2026
Signed off — Alteration
FILED STRUCTURAL WORK FOR A NEW 1-STORY COMMERCIAL BUILDING
Q00684105-I1
01/29/2026
Signed off — Alteration
Solar panels installation on roof.
Q01252984-I1
01/12/2026
Signed off — Alteration
HEREWITH FILED SPRINKLER WORK FOR A NEW 1-STORY COMMERCIAL BUILDING
Q00577569-I1
01/09/2026
Signed off — Alteration
HEREWITH FILED SPRINKLER WORK FOR A NEW 1-STORY COMMERCIAL BUILDING
Q00577569-S1
01/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/01/2025
Signed off — New Building
PROPOSED A NEW ATTACHED 1-STORY COMMERCIAL BUILDING
Q00561457-S1
11/28/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/14/2025
Signed off — Alteration
INSTALL TEMP. CONSTRUCTION FENCE. FILED IN CONJUNCTION WITH NB #Q00561474, #Q00561470, #Q00561468, #Q00561457.
Q00908907-I1
11/14/2025
Permit issued — Curb Cut
Q00561457-S1-CC
11/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/07/2025
Filed — New Building
PROPOSED A NEW ATTACHED 1-STORY COMMERCIAL BUILDING
Q00561457-P3
10/07/2025
Special inspection requirement — Protection of exposed foundation insulation
ROBERT LIN
10/07/2025
Special inspection requirement — Air barrier - visual inspection
ROBERT LIN
08/28/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/18/2025
Permit issued — Construction Fence
Q00908907-I1-FN
08/14/2025
Permit issued — Plumbing
Q00577569-I1-PL
08/04/2025
Filed — Alteration
HEREWITH FILED SPRINKLER WORK FOR A NEW 1-STORY COMMERCIAL BUILDING
Q00577569-P1
07/24/2025
Permit issued — Solar
Q01252984-I1-SL
07/16/2025
Filed — Alteration
Solar panels installation on roof.
Q01252984-I1
06/17/2025
Violation issued (ECB, closed)
Construction
05/16/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/19/2025
Violation issued (ECB, closed)
Unknown
03/19/2025
Violation issued (ECB, closed)
Construction
03/05/2025
Violation issued (ECB, closed)
Unknown
02/17/2025
Violation issued (ECB, closed)
Unknown
02/11/2025
Permit issued — Foundation
Q00561457-I1-GC-CX
12/06/2024
Inspection — Pass-Final House Connection
Pass
View inspection ↗
11/25/2024
Permit issued — Structural
Q00684105-I1-ST
10/25/2024
Violation issued (ECB, closed)
Unknown
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offCTI CONSTRUCTION INC11/14/2025
DOB NOWConstruction FenceSigned-offCTI CONSTRUCTION INC08/18/2025
DOB NOWPlumbingSigned-offDW PLUMBING INC08/14/2025
DOB NOWSolarSigned-offLEADING GREEN ENERGY CON07/24/2025
DOB NOWFoundationPermit IssuedCTI CONSTRUCTION INC02/11/2025
DOB NOWStructuralSigned-offCTI CONSTRUCTION INC11/25/2024
DOB NOWMechanical SystemsPermit IssuedCTI CONSTRUCTION INC09/27/2024
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.09/27/2024
DOB NOWConstruction FenceSigned-offCTI CONSTRUCTION INC09/11/2024
DOB NOWPlumbingSigned-offDW PLUMBING INC08/06/2024
DOB NOWPlumbingSigned-offDW PLUMBING INC03/28/2024
DOB NOWGeneral ConstructionPermit IssuedCTI CONSTRUCTION INC02/16/2024
DOB NOWStructuralSigned-offCTI CONSTRUCTION INC11/28/2023
DOB NOWEarth WorkPermit IssuedCTI CONSTRUCTION INC11/27/2023
DOB NOWConstruction FenceSigned-offCTI CONSTRUCTION INC09/25/2023
DOB NOWFoundationPermit IssuedCTI CONSTRUCTION INC05/23/2022
1 project · most recent 07/22/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/22/2026Signed-offCTI CONSTRUCTION INCAir Conditioning Systems, Heating Systems
Cooling
Fujitsu MODEL: AOUG12LMAS1 16,000 BTU · Split System ×4
Gree VIR09HP230V1AO 9,900 BTU · Split System ×2
Heating
Modine HD 125AS0111FDAN 125,000 BTU · Unit Heater ×3
HD100 125,000 BTU · Unit Heater ×8
MODEL: HD 125AS0111FDAN, SERIAL # 43010017091625-5353 125,000 BTU · Electric Heater ×1
MODEL: HD 125AS0111FDAN, SERIAL # 43010017091625-5356 125,000 BTU · Electric Heater ×1
2 projects · most recent 10/28/2025
General Wiring
FiledStatusContractorScope
10/28/2025CompleteKWONG MING ELECTRIC INC—
06/04/2025CompleteA.C. MORGAN ELECTRICGeneral Wiring
1 project · most recent 07/22/2026
FiledStatusContractorScope
07/22/2026Signed-offCTI CONSTRUCTION INC5 scope_items
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/28/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
11/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/16/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/06/2024Pass-Final House ConnectionPassView ↗
10/09/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/10/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/05/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 106
DateRequirementInspectorRole
07/30/2026Concrete - Cast-In-PlaceROBERT LINspecial
07/30/2026Air barrier - visual inspectionROBERT LINenergy_progress
07/30/2026Exterior lighting powerROBERT LINenergy_progress
07/30/2026MeteringROBERT LINenergy_progress
07/30/2026Fenestration areasROBERT LINenergy_progress
07/30/2026Insulation placement and R valuesROBERT LINenergy_progress
07/30/2026Fenestration and door U-factor and product ratingsROBERT LINenergy_progress
07/30/2026Fenestration air leakageROBERT LINenergy_progress
07/30/2026Maintenance informationROBERT LINenergy_progress
07/30/2026Interior lighting powerROBERT LINenergy_progress
07/30/2026HVAC-R and service water heating system controlsROBERT LINenergy_progress
07/30/2026Lighting controlsROBERT LINenergy_progress
07/30/2026Protection of exposed foundation insulationROBERT LINenergy_progress
07/30/2026Shutoff dampersROBERT LINenergy_progress
07/30/2026HVAC-R and service water heating equipmentROBERT LINenergy_progress
07/30/2026Air barrier — testing ROBERT LINenergy_progress
07/30/2026HVAC-R and service water piping design and insulationROBERT LINenergy_progress
07/30/2026FinalROBERT LINprogress
07/30/2026Energy Code Compliance InspectionsROBERT LINprogress
07/30/2026Fire-Resistance Rated ConstructionROBERT LINprogress
07/30/2026Footing and FoundationROBERT LINprogress
07/30/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationROBERT LINspecial
07/30/2026Excavations - Sheeting, Shoring, and BracingROBERT LINspecial
07/30/2026Mechanical SystemsROBERT LINspecial
07/30/2026Fire-Resistant Penetrations and JointsROBERT LINspecial
Latest 25 of 106.
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/26/2026Q00684105-P1Request digital key ↗
08/26/2026Q00684105-I1Request digital key ↗
08/24/2026Q00908907-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
03/08/2022440701117Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZoning Exhibit form (1-5)6
08/16/2026Q00561457-P5Open ↗
08/13/2026Q00561457-P3Open ↗
08/13/2026Q00561457-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram6
08/16/2026Q00561457-P5Open ↗
08/13/2026Q00561457-P4Open ↗
08/13/2026Q00561457-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00561457-I1Open ↗
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026Q00577569-I1Open ↗
09/01/2026Q00577569-I1Open ↗
09/01/2026Q00577569-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/26/2026Q00684105-P1Open ↗
08/26/2026Q00684105-I1Open ↗
08/24/2026Q00577569-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026Q00577569-I1Open ↗
09/01/2026Q00577569-I1Open ↗
09/01/2026Q00577569-I1Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/08/2022440701117Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026Q00561457-P1Open ↗
08/13/2026Q00561457-I1Open ↗
08/13/2026Q00561457-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist6
08/16/2026Q00561457-P5Open ↗
08/13/2026Q00561457-P3Open ↗
08/13/2026Q00561457-P4Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREES SITE PLAN1
03/05/2026440701117Open ↗
▸BISSTREET TREE SIGNOFF1
03/05/2026440701117Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00561457-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00561457-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00561457-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00561457-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01252984-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026Q00561457-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026Q00561457-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/08/2022440701117Open ↗
▸Other Documents15
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/16/2026Q00561457-P5Open ↗
08/13/2026Q00561457-P2Open ↗
08/13/2026Q00561457-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
08/16/2026Q00561457-P5Open ↗
08/13/2026Q00561457-I1Open ↗
08/13/2026Q00561457-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey2
08/16/2026Q00561457-I1Open ↗
08/13/2026Q00561457-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026Q00561457-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00561457-I1Open ↗