ECB08/05/202628-105.12.8 SITE SAFETY PLAN@ACTIVE 7STORY NB SITE OBSERVE UNSAFE CONDITIONS THROUGHOUT&SITE FAILED TO ADHERE TO PROVIDED SAFETY PLAN TO ENSURE SAFETY-SUPPORTED SCAFFOLD NOT IN PLACE FOR ACTIVE EXTERIOR/FACADE$2K due
ECB08/05/2026BC3301.13.5 ALTERNATE CONSTRUCTION SUPERINTENDENT.@ACTIVE SITE OBSERVE UNSAFE CONDITIONS THROUGHOUT(HOUSEKEEP,FALL PROTECTION/GUARDRAIL,&ETC)&UPON REVIEW THE PRE-SHIFT SAFETY MEETING&SUPERINTENDENT LOGS I DISCO$5K due
ECB08/05/2026@7STORY NB SITE OBSERVE SITES HOUSEKEEPING NOT MAINTAINED THROUGHOUT AFFECTING HEALTH&LIFE SAFETY OF ALL-DEBRIS CONTAINER ON ROAD FILLED OVER BRIM W/ NO COVER(DISLODGEMENT HAZARD),DEBRIS/MATERIAL ON SIDEWALK(TR$2K due
ECB08/05/2026SIDEWALK SHED. @7STORY NB SITE OBSERVE SIDEWALK SHED IN PLACE COVERING EXP#1-2 AND I VERIFIED PER DOB RECORDS(DOB NOW)THE SIDEWALK SHED PERMIT JOB# Q01098336 HAD EXPIRED SINCE 6/7/26 WHERE NB GC FAILED TO ENSUR$1K due
ECB08/05/2026/VERTICAL SAFETY NETTING/FALL PROTECTION.@7STORY NB SITE OBSERVE ACTIVE EXTERIOR WORK OPERATIONS@LEADING EDGE&WORK WITHIN UNENCLOSED PERIMETER THROUGHOUT LEVELS ABOVE 1ST FL W/ HAZARDS OF FALL-WORKER WITHOUT FA$5K due
ECB04/15/20267 STORY NEW BUILDING. ACTIVE SITE DURING SUPERSTRUCTURE PHASE, OBSERVE SIDEWALK SHED AT EXP#3 WITH VERTICAL MEMBERS OUT OF PLUMB, JUNIOR BEAMS OUT OF ALIGNMENT, FRACTURED MUDSILLS, LOOSE PLANKS AND BEND CORRUGA$3K due
ECB11/20/2025DURING INSPECTION OF A PROPOSED 7 STORY BUILDING I OBSERVED THAT THERE WAS DEBRIS THROUGHOUT THE SITE ON ALL FLOORS. THE MATERIAL (WOOD, METAL, GARBAGE BAGS) CREATES TRIP AND FALL HAZARDS TO ANYONE WALKING AROU$12K due
ECB11/20/2025BC3307.4.7 PUBLIC WALKWAY: DURING INSPECTION OF A PROPOSED 7 STORY BUILDING WITH A STORAGE WORK ZONE AREA AT EXPOSURE #1 AND #2 ADJACENT TO THE SIDEWALK SHED, I OBSERVED THAT THE 4 FOOT FENCE WITH DEBRIS NETTIN$10K due
ECB11/20/2025BC3301.7TEMP PLATFORM: INSPECTION OF A 7 STORY BUILDING W/CONCRETE FORM WORK TAKING PLACE, THE STAIRCASE WAS BEING MEASURED OUT FOR CONCRETE FORM WORK & THE FLOOR ABOVE WAS OPEN WERE A WORKER WAS FORMING OUT FO$10K due
ECB11/20/2025BC3301.2 OVER HEAD PROTECTION: DURING INSPECTION OF A PROPOSED 7 STORY BUILDING, I OBSERVED AT EXPOSURE #2 THERE WAS MISSING OVER HEAD PROTECTION WHEN ENTERING THE SITE. EX#2 WAS FULLY OPEN TO THE OVER HEAD CON$5K due
ECB07/02/20263307.4.7 WORK OR STORAGE ZONES. OBSERVED PILE OF ROCKS AT EXP 2 STREET LEVEL STORED IN AN INADEQUATE STORAGE AREA, EASILY ACCESSIBLE TO THE PUBLIC DUE TO YODOCK BARRIERS NOT BEING CONNECTED AND SEPARATED CREATIHearing held — result not yet published$2K proposed
ECB12/08/2025OBSERVED NO PARAPET INFORMATION PANEL ON PERMITTED SIDEWALK SHED. THIS CREATES HAZARDOUS CONDITIONS TO THE PUBLIC OR EMERGENCY SERVICES TRYING TO LOCATE THE BUILDING.PROVIDE SIDEWALK SHED PARAPET PANEL INFOMATINothing owed — awaiting certificate of correction
ECB01/10/2025DURING INSPECTION OF A SITE THAT WAS PARTIALLY GRADED AND PARTIALLY EXCAVATED DEEPER THEN 5 FEET, I OBSERVED THAT THE CONSTRUCTION FENCE IN PLACE AT EX#3 HAD LOOSE AND MISSING PANELS. THE MISSING PANELS LEFT THNothing owed — awaiting certificate of correction
Zoned commercial or Manhattan residential · Owner of record: FBL ROWAN LLC · 18,757 sf lot · 0 FAR built · Flood zone X