Elevator apt, semi-fireproof with stores
Ravenswood (NYCHA)
21-51 34 AVENUE · BIN 4430879
💬 Discuss this project
1950Year Built
6Stories
D7Building Class
R5Zoning
363,720 sfGross Floor Area
386Units
LL97 Covered13 Open Violations 5 unresolved · 8 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: NYC HOUSING AUTHORITY · 241,500 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 9 docs
Sub-BasementUnder Construction33p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA6007/08/2026
NYC HOUSING AUTHORITY603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THE LIRO GROUP603/23/2026
SYNERGIC DESIGN ARCHITECTS103/21/2025
NYMS CONSULTING, LLC201/29/2024
YSRAEL A. SEINUK, P.C.308/31/2023
LIRO ARCHITECTS + PLANNERS, P.C.405/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN APPROVE BUILD2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARIC MECHANICAL INCGeneral Contractor5407/08/2026
FJP MECHANICAL INCPlumbing607/08/2026
ACCORD POWER INCGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DISTINCT ENGINEERING SOLU26411003/23/2026
SYNERGIC DESIGN LLC8561103/21/2025
Building Lifecycle
All (135)Filed (16)Permit Issued (43)Signed Off (3)Facade (FISP) (9)Violation (18)Inspection (4)Objection (12)Special Inspection (30)
09/11/2026
Signed off — Alteration
NYCHA BOILER_Removal and replacement of existing condensate pump concrete pads
Q00455168-S2
05/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
YAZAN YANES
05/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
YAZAN YANES
05/19/2026
Special inspection requirement — Energy Code Compliance Inspections
YAZAN YANES
05/19/2026
Special inspection requirement — Post-installed Anchors
YAZAN YANES
05/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
YAZAN YANES
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAZAN YANES
05/19/2026
Special inspection requirement — Maintenance information
YAZAN YANES
03/23/2026
Filed — Alteration
NYCHA BOILER_Removal and replacement of existing condensate pump concrete pads
Q00455168-P5
03/19/2026
Permit issued — General Construction
Q00455168-I1-GC
03/18/2026
Permit issued — General Construction
Q00457470-I1-GC
03/18/2026
Permit issued — Mechanical Systems
Q00457470-S1-MS
03/18/2026
Permit issued — Mechanical Systems
Q00455168-S1-MS
03/18/2026
Permit issued — Structural
Q00455168-S3-ST
03/04/2026
Permit issued — Solar
Q01180124-I1-SL
02/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
YAZAN YANES
02/24/2026
Special inspection requirement — Maintenance information
YAZAN YANES
02/24/2026
Special inspection requirement — Post-installed Anchors
YAZAN YANES
02/24/2026
Special inspection requirement — Energy Code Compliance Inspections
YAZAN YANES
02/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAZAN YANES
02/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
YAZAN YANES
02/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
YAZAN YANES
01/07/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/09/2025
Permit issued — Plumbing
Q00455168-S2-PL
09/15/2025
Permit issued — Plumbing
Q00457470-S2-PL
05/12/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/11/2025
Permit issued — General Construction
Q00455168-I1-GC
04/08/2025
Permit issued — Solar
Q01180124-I1-SL
03/26/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/25/2025
Permit issued — Mechanical Systems
Q00455168-S1-MS
03/21/2025
Filed — Alteration
Installation of 77.935 kw solar energy system on roof. No change of occupancy, use or egress
Q01180124-I1
03/21/2025
Permit issued — Mechanical Systems
Q00457470-S1-MS
03/21/2025
Permit issued — General Construction
Q00457470-I1-GC
03/21/2025
Permit issued — Structural
Q00457470-S3-ST
03/18/2025
Permit issued — Structural
Q00455168-S3-ST
03/17/2025
Signed off — Alteration
Q00859086-I1
02/12/2025
Special inspection requirement — Final
Malathi Ananthakrishnan
02/12/2025
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
02/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
02/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
02/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
02/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2025
Permit issued — Structural
Q00455168-S3-ST
01/07/2025
Permit issued — Mechanical Systems
Q00455168-S1-MS
01/07/2025
Permit issued — General Construction
Q00457470-I1-GC
01/07/2025
Permit issued — Structural
Q00457470-S3-ST
01/07/2025
Permit issued — Construction Fence
Q00859086-I1-FN
01/07/2025
Permit issued — Mechanical Systems
Q00457470-S1-MS
01/07/2025
Permit issued — General Construction
Q00455168-I1-GC
01/03/2025
Objection resolved — Addressed
12/31/2024
Objection raised — Scope
12/19/2024
Filed — Alteration
NYCHA BOILER_Removal and replacement of existing condensate pump concrete pads
Q00455168-P3
12/13/2024
Signed off — Alteration
RAVENSWOOD HOUSES - BUILDING #7, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH DOB # Q00455168, Q00859086. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00867072-I1
10/11/2024
Permit issued — Plumbing
Q00455168-S2-PL
09/10/2024
Permit issued — Plumbing
Q00457470-S2-PL
07/16/2024
Permit issued — Support of Excavation
Q00867072-I1-SE
05/29/2024
Permit issued — Support of Excavation
Q00867072-I1-SE
04/17/2024
Violation issued (HPD, closed)
A
04/04/2024
Permit issued — Mechanical Systems
Q00455168-S1-MS
04/04/2024
Permit issued — Structural
Q00455168-S3-ST
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMARIC MECHANICAL INC03/19/2026
DOB NOWGeneral ConstructionPermit IssuedMARIC MECHANICAL INC03/18/2026
DOB NOWMechanical SystemsSigned-offMARIC MECHANICAL INC03/18/2026
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC03/18/2026
DOB NOWStructuralPermit IssuedMARIC MECHANICAL INC03/18/2026
DOB NOWSolarPermit IssuedACCORD POWER INC03/04/2026
DOB NOWPlumbingSigned-offFJP MECHANICAL INC10/09/2025
DOB NOWPlumbingSigned-offFJP MECHANICAL INC09/15/2025
DOB NOWGeneral ConstructionPermit IssuedMARIC MECHANICAL INC04/11/2025
DOB NOWSolarPermit IssuedACCORD POWER INC04/08/2025
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC03/25/2025
DOB NOWMechanical SystemsSigned-offMARIC MECHANICAL INC03/21/2025
DOB NOWGeneral ConstructionPermit IssuedMARIC MECHANICAL INC03/21/2025
DOB NOWStructuralPermit IssuedMARIC MECHANICAL INC03/21/2025
DOB NOWStructuralPermit IssuedMARIC MECHANICAL INC03/18/2025
DOB NOWStructuralPermit IssuedMARIC MECHANICAL INC01/07/2025
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC01/07/2025
DOB NOWGeneral ConstructionPermit IssuedMARIC MECHANICAL INC01/07/2025
DOB NOWStructuralPermit IssuedMARIC MECHANICAL INC01/07/2025
DOB NOWConstruction FenceSigned-offMARIC MECHANICAL INC01/07/2025
DOB NOWMechanical SystemsSigned-offMARIC MECHANICAL INC01/07/2025
DOB NOWGeneral ConstructionPermit IssuedMARIC MECHANICAL INC01/07/2025
DOB NOWPlumbingSigned-offFJP MECHANICAL INC10/11/2024
DOB NOWPlumbingSigned-offFJP MECHANICAL INC09/10/2024
DOB NOWSupport of ExcavationSigned-offMARIC MECHANICAL INC07/16/2024
DOB NOWSupport of ExcavationSigned-offMARIC MECHANICAL INC05/29/2024
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC04/04/2024
DOB NOWStructuralPermit IssuedMARIC MECHANICAL INC04/04/2024
DOB NOWSupport of ExcavationSigned-offMARIC MECHANICAL INC04/01/2024
DOB NOWStructuralPermit IssuedMARIC MECHANICAL INC03/19/2024
DOB NOWMechanical SystemsSigned-offMARIC MECHANICAL INC03/19/2024
DOB NOWConstruction FenceSigned-offMARIC MECHANICAL INC03/19/2024
DOB NOWGeneral ConstructionPermit IssuedMARIC MECHANICAL INC03/19/2024
DOB NOWGeneral ConstructionPermit IssuedMARIC MECHANICAL INC03/19/2024
DOB NOWStructuralPermit IssuedMARIC MECHANICAL INC02/07/2024
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC10/17/2023
DOB NOWPlumbingSigned-offFJP MECHANICAL INC10/11/2023
DOB NOWStructuralPermit IssuedMARIC MECHANICAL INC10/05/2023
DOB NOWGeneral ConstructionPermit IssuedMARIC MECHANICAL INC09/12/2023
DOB NOWPlumbingSigned-offFJP MECHANICAL INC09/11/2023
+ 12 more permits on file
2 projects · most recent 03/23/2026
Ventilation Systems
FiledStatusContractorScope
03/23/2026Permit IssuedMARIC MECHANICAL INCVentilation Systems
05/13/2022Signed-offMARIC MECHANICAL INCVentilation Systems
2 projects · most recent 03/23/2026
Storm Gas Water/Sanitary
FiledStatusContractorScope
03/23/2026Signed-offFJP MECHANICAL INCGas, Storm, Water/Sanitary
05/13/2022Signed-offFJP MECHANICAL INCStorm
5 projects · most recent 03/05/2025
General Wiring Lighting
FiledStatusContractorScope
03/05/2025Permit IssuedACCORD POWER ELECTRIC LLC2 meters, 1 new_meters
01/17/2025CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
08/29/2023CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
08/29/2023CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
05/05/2023Permit IssuedTRU-VAL ELECTRIC CORP.General Wiring, Lighting
2 projects · most recent 03/23/2026
Concrete Steel
FiledStatusContractorScope
03/23/2026Permit IssuedMARIC MECHANICAL INCConcrete
05/13/2022Signed-offMARIC MECHANICAL INCSteel, Concrete
1 project · most recent 03/21/2025
FiledStatusContractorScope
03/21/2025Permit IssuedACCORD POWER INC143 panels, 77.93 kw, 13,924.95 roof_area_sqft
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/07/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/12/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
05/19/2026HVAC-R and service water piping design and insulationYAZAN YANESenergy_progress
05/19/2026HVAC-R and service water heating equipmentYAZAN YANESenergy_progress
05/19/2026Energy Code Compliance InspectionsYAZAN YANESprogress
05/19/2026Post-installed AnchorsYAZAN YANESspecial
05/19/2026HVAC-R and service water heating system controlsYAZAN YANESenergy_progress
05/19/2026Fire-Resistant Penetrations and JointsYAZAN YANESspecial
05/19/2026Maintenance informationYAZAN YANESenergy_progress
02/24/2026HVAC-R and service water piping design and insulationYAZAN YANESenergy_progress
02/24/2026Maintenance informationYAZAN YANESenergy_progress
02/24/2026Post-installed AnchorsYAZAN YANESspecial
02/24/2026Energy Code Compliance InspectionsYAZAN YANESprogress
02/24/2026Fire-Resistant Penetrations and JointsYAZAN YANESspecial
02/24/2026HVAC-R and service water heating system controlsYAZAN YANESenergy_progress
02/24/2026HVAC-R and service water heating equipmentYAZAN YANESenergy_progress
02/12/2025FinalMalathi Ananthakrishnanprogress
02/12/2025Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
02/12/2025Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
02/12/2025Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
02/12/2025Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
01/25/2024Excavations - Sheeting, Shoring, and BracingRamnarayan Tirumalaspecial
01/25/2024Tenant Protection Plan ComplianceRamnarayan Tirumalaspecial
09/26/2023FinalRamnarayan Tirumalaprogress
08/24/2023FinalRamnarayan Tirumalaprogress
05/19/2022Fire-Resistance Rated ConstructionYAZAN YANESprogress
05/19/2022Fire-Resistant Penetrations and JointsYAZAN YANESspecial
Latest 25 of 54.
▾Documents — 143 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch12
08/26/2026Q00457470-S3Request digital key ↗
08/26/2026Q00457470-S2Request digital key ↗
08/26/2026Q00457470-S1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
08/26/2026Q00457470-I1Request digital key ↗
08/26/2026Q00457470-P1Request digital key ↗
08/17/2026Q00455168-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION3
07/02/2014440153548Open ↗
07/01/2014440153156Open ↗
07/06/2013420860697Open ↗
▸BISWORK PERMIT APPLICATION3
04/16/2015420860697Open ↗
07/02/2014440153548Open ↗
07/01/2014440153156Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
11/05/2015440153156Open ↗
10/05/2015440153548Open ↗
▸Seals & Professional Certifications54
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026Q00457470-I1Open ↗
09/02/2026Q00457470-I1Open ↗
09/01/2026Q00455168-S3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026Q00457470-I1Open ↗
08/26/2026Q00457470-S3Open ↗
08/26/2026Q00457470-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026Q00457470-I1Open ↗
09/01/2026Q00455168-S1Open ↗
08/28/2026Q00457470-S2Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
09/23/2015420860697Open ↗
09/23/2015420860697Open ↗
04/16/2015420860697Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/02/2014440153548Open ↗
07/01/2014440153156Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/02/2014440153548Open ↗
07/01/2014440153156Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/02/2014440153548Open ↗
07/01/2014440153156Open ↗
▸Environmental & Asbestos2
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/23/2015420860697Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01180124-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/23/2015420860697Open ↗
04/16/2015420860697Open ↗
10/22/2013420860697Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
09/23/2015420860697Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/01/2014440153156Open ↗
▸Approvals, Objections & Sign-offs42
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/17/2026Q00455168-I1Open ↗
08/17/2026Q00455168-S3Open ↗
08/17/2026Q00455168-P3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)13
08/17/2026Q00455168-S2Open ↗
08/17/2026Q00455168-P3Open ↗
08/17/2026Q00455168-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP Variance (V5) letter8
08/13/2026Q00457470-S1Open ↗
08/13/2026Q00455168-S1Open ↗
08/13/2026Q00455168-I1Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/05/2015440153156Open ↗
10/05/2015440153548Open ↗
09/23/2015420860697Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/16/2015420860697Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/06/2013420860697Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
09/23/2015420860697Open ↗
07/06/2013420860697Open ↗
07/06/2013420860697Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
07/02/2014440153548Open ↗
07/01/2014440153156Open ↗
▸BISADDITIONAL INFORMATION1
10/17/2013420860697Open ↗
▸BISEFILING COVER SHEET1
07/06/2013420860697Open ↗
▸Other Documents8
▸DOB NOWWaiver Document5
08/17/2026Q00455168-S2Open ↗
08/17/2026Q00455168-P3Open ↗
08/13/2026Q00457470-S1Open ↗
Showing 3 of 5 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION2
07/02/2014440153548Open ↗
07/01/2014440153156Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00867072-I1Open ↗