21-16 STEINWAY STREET
QUEENS · Astoria (North)-Ditmars-Steinway · BIN 4015956
💬 Discuss this project
1950Year Built
3Stories
C0Building Class
R5DZoning
2,605 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · 2,000 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction9p · 2 filings · 20 docs
Floor 2Under Construction9p · 2 filings · 20 docs
Floor 1Under Construction10p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STAVRIANOS1104/09/2026
VNG SERVICE RENOVATION CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CE ARCHITECT, PLLC511/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CE ARCHITECT, PLLC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VNG SERVICE RENOVATION COGeneral Contractor303/21/2026
J & D CARRYING & CONSTRUCGeneral Contractor204/09/2026
OLYMPIA PLBING & HTG CORPPlumbing207/08/2026
T.M.T ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROYAL CONSTRUCTION P.E. S462511/25/2025
Building Lifecycle
All (65)Filed (5)Permit Issued (5)Signed Off (1)Violation (9)Inspection (10)Objection (12)Special Inspection (23)
06/22/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/22/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/28/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/07/2026
Violation issued (HPD, closed)
A
03/20/2026
Permit issued — Foundation
Q01215798-I1-GC-CX
01/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/25/2025
Filed — Alteration
INTERIOR GUT RENOVATION OF 1ST & 2ND FLOOR UNIT, TO INCLUDE RELOCATION OF EXT'G KITCHEN, RELOCATE EXT'G BATHROOM AND INSTALL NEW BATHROOMS. INSTALL NEW COMBI. BOILERS ON ALL FLOORS. RELOCATE EXT'G GAS METERS AT 1ST FLOOR TO OPEN SPACE
Q01068426-P2
11/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EBRAHIM MIANDOABI
11/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
EBRAHIM MIANDOABI
11/19/2025
Special inspection requirement — Permanent certificate
EBRAHIM MIANDOABI
11/19/2025
Special inspection requirement — Maintenance information
EBRAHIM MIANDOABI
11/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
EBRAHIM MIANDOABI
11/19/2025
Special inspection requirement — Energy Code Compliance Inspections
EBRAHIM MIANDOABI
11/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
EBRAHIM MIANDOABI
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EBRAHIM MIANDOABI
11/10/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/11/2025
Permit issued — Plumbing
Q01068426-S1-PL
08/08/2025
Permit issued — General Construction
Q01215798-I1-GC-CX
07/21/2025
Filed — Alteration
INTERIOR GUT RENOVATION OF 1ST & 2ND FLOOR UNIT, TO INCLUDE RELOCATION OF EXT'G KITCHEN, RELOCATE EXT'G BATHROOM AND INSTALL NEW BATHROOMS. INSTALL NEW COMBI. BOILERS ON ALL FLOORS. RELOCATE EXT'G GAS METERS AT 1ST FLOOR TO OPEN SPACE
Q01068426-P1
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EBRAHIM MIANDOABI
07/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
EBRAHIM MIANDOABI
07/18/2025
Special inspection requirement — Energy Code Compliance Inspections
EBRAHIM MIANDOABI
07/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
EBRAHIM MIANDOABI
07/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
EBRAHIM MIANDOABI
07/18/2025
Special inspection requirement — Maintenance information
EBRAHIM MIANDOABI
07/18/2025
Special inspection requirement — Permanent certificate
EBRAHIM MIANDOABI
07/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EBRAHIM MIANDOABI
07/07/2025
Objection resolved — Addressed
06/30/2025
Objection raised — Cost
06/12/2025
Violation issued (HPD, closed)
A
06/10/2025
Objection resolved — Addressed
06/09/2025
Objection resolved — Addressed
06/09/2025
Objection resolved — Addressed
06/09/2025
Objection resolved — Addressed
06/09/2025
Objection resolved — Addressed
06/04/2025
Signed off — Alteration
INTERIOR GUT RENOVATION OF 1ST & 2ND FLOOR UNIT, TO INCLUDE RELOCATION OF EXT'G KITCHEN, RELOCATE EXT'G BATHROOM AND INSTALL NEW BATHROOMS. INSTALL NEW COMBI. BOILERS ON ALL FLOORS. RELOCATE EXT'G GAS METERS AT 1ST FLOOR TO OPEN SPACE
Q01068426-I1
05/16/2025
Objection raised — Admin
05/16/2025
Objection raised — Admin
05/16/2025
Objection raised — Structural
05/16/2025
Objection raised — Energy
05/16/2025
Objection raised — Scope
05/01/2025
Filed — Alteration CO
HEREWITH FILED FOR A (1) STORY HORIZONTAL 83.44 SF ENLARGEMENT AT THE REAR OF AN EXT'G 3-STY 3-FAMILY BUILDING, CONVERT EXT'G GARGE INTO PART OF 1ST FLOOR DWELLING, MINOR STRUCTURAL & PARTITION WORK, PLUMBING FILED UNDER SEPARATE APPLICATION IN DOB NOW.
Q01215798-I1
10/21/2024
Permit issued — Plumbing
Q01068426-S1-PL
07/30/2024
Violation issued (ECB, closed)
Unknown
07/30/2024
Violation issued (ECB, closed)
Construction
07/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/28/2024
Permit issued — General Construction
Q01068426-I1-GC
06/25/2024
Filed — Alteration
INTERIOR GUT RENOVATION OF 1ST & 2ND FLOOR UNIT, TO INCLUDE RELOCATION OF EXT'G KITCHEN, RELOCATE EXT'G BATHROOM AND INSTALL NEW BATHROOMS. INSTALL NEW COMBI. BOILERS ON ALL FLOORS. RELOCATE EXT'G GAS METERS AT 1ST FLOOR TO OPEN SPACE
Q01068426-S1
06/24/2024
Filed — Alteration
INTERIOR GUT RENOVATION OF 1ST & 2ND FLOOR UNIT, TO INCLUDE RELOCATION OF EXT'G KITCHEN, RELOCATE EXT'G BATHROOM AND INSTALL NEW BATHROOMS. INSTALL NEW COMBI. BOILERS ON ALL FLOORS. RELOCATE EXT'G GAS METERS AT 1ST FLOOR TO OPEN SPACE
Q01068426-I1
06/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
EBRAHIM MIANDOABI
06/19/2024
Special inspection requirement — Insulation placement and R values
EBRAHIM MIANDOABI
06/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EBRAHIM MIANDOABI
06/19/2024
Special inspection requirement — Interior lighting power
EBRAHIM MIANDOABI
06/19/2024
Special inspection requirement — Energy Code Compliance Inspections
EBRAHIM MIANDOABI
06/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
EBRAHIM MIANDOABI
06/18/2024
Special inspection requirement — Final
EBRAHIM MIANDOABI
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedJ D CARRYING CONSTRUC03/20/2026
DOB NOWPlumbingPermit IssuedOLYMPIA PLBING & HTG CORP08/11/2025
DOB NOWGeneral ConstructionPermit IssuedJ D CARRYING CONSTRUC08/08/2025
DOB NOWPlumbingPermit IssuedOLYMPIA PLBING & HTG CORP10/21/2024
DOB NOWGeneral ConstructionSigned-offVNG SERVICE RENOVATION CO06/28/2024
1 project · most recent 11/25/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/25/2025Permit IssuedOLYMPIA PLBING & HTG CORPGas, Water/Sanitary
2 projects · most recent 01/14/2026
General Wiring
FiledStatusContractorScope
01/14/2026Permit IssuedGRX EURO ELECTRIC CORPGeneral Wiring
08/09/2024Permit IssuedT.M.T ELECTRIC INCGeneral Wiring
1 project · most recent 05/01/2025
FiledStatusContractorScope
05/01/2025Permit IssuedJ & D CARRYING & CONSTRUC1 scope_items
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/22/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/22/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/22/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/28/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/10/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
11/19/2025HVAC-R and service water piping design and insulationEBRAHIM MIANDOABIenergy_progress
11/19/2025HVAC-R and service water heating system controlsEBRAHIM MIANDOABIenergy_progress
11/19/2025Permanent certificateEBRAHIM MIANDOABIenergy_progress
11/19/2025Maintenance informationEBRAHIM MIANDOABIenergy_progress
11/19/2025HVAC-R and service water heating equipmentEBRAHIM MIANDOABIenergy_progress
11/19/2025Energy Code Compliance InspectionsEBRAHIM MIANDOABIprogress
11/19/2025Tenant Protection Plan ComplianceEBRAHIM MIANDOABIspecial
11/19/2025Fire-Resistant Penetrations and JointsEBRAHIM MIANDOABIspecial
07/18/2025Fire-Resistant Penetrations and JointsEBRAHIM MIANDOABIspecial
07/18/2025Tenant Protection Plan ComplianceEBRAHIM MIANDOABIspecial
07/18/2025Energy Code Compliance InspectionsEBRAHIM MIANDOABIprogress
07/18/2025HVAC-R and service water heating system controlsEBRAHIM MIANDOABIenergy_progress
07/18/2025HVAC-R and service water heating equipmentEBRAHIM MIANDOABIenergy_progress
07/18/2025Maintenance informationEBRAHIM MIANDOABIenergy_progress
07/18/2025Permanent certificateEBRAHIM MIANDOABIenergy_progress
07/18/2025HVAC-R and service water piping design and insulationEBRAHIM MIANDOABIenergy_progress
06/19/2024Fire-Resistance Rated ConstructionEBRAHIM MIANDOABIprogress
06/19/2024Insulation placement and R valuesEBRAHIM MIANDOABIenergy_progress
06/19/2024Fire-Resistant Penetrations and JointsEBRAHIM MIANDOABIspecial
06/19/2024Interior lighting powerEBRAHIM MIANDOABIenergy_progress
06/19/2024Energy Code Compliance InspectionsEBRAHIM MIANDOABIprogress
06/19/2024Tenant Protection Plan ComplianceEBRAHIM MIANDOABIspecial
06/18/2024FinalEBRAHIM MIANDOABIprogress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026Q01215798-I1Request digital key ↗
08/19/2026Q01068426-P1Request digital key ↗
08/19/2026Q01068426-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01215798-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01215798-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q01068426-I1Open ↗
09/01/2026Q01068426-I1Open ↗
08/24/2026Q01068426-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/19/2026Q01068426-S1Open ↗
08/19/2026Q01068426-P1Open ↗
08/13/2026Q01068426-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q01068426-I1Open ↗
08/24/2026Q01068426-P2Open ↗
08/23/2026Q01068426-P1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01215798-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/19/2026Q01068426-S1Open ↗
08/19/2026Q01068426-P1Open ↗
08/13/2026Q01068426-P2Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸DOB NOWSite Survey: Initial1
08/13/2026Q01215798-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01215798-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01215798-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01215798-I1Open ↗