← Back
BuildNYC
Three families
21-16 STEINWAY STREET
QUEENS · BIN 4015956
💬 Discuss this project
1950Year Built
3Stories
C0Building Class
R5DZoning
2,605 sfGross Floor Area
3Units
Rent Stabilized0 Active Violations
Three families · 2,000 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 3Under Construction12p · 2 filings · 20 docs
Floor 2Under Construction12p · 2 filings · 20 docs
Floor 1Under Construction10p · 2 filings · 20 docs
Site & exteriorUnder Construction9p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Stavrianos1511/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CE Architect711/12/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CE Architect1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VNG Service RenovationGeneral Contractor303/21/2026
J & D Carrying & ConstructionGeneral Contractor204/09/2026
Olympia Plbing & HeatingPlumbing207/08/2026
T.M.T. ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Royal Construction P.E. S462711/12/2026
Building Lifecycle
11/12/2026
Filed — Alteration
INTERIOR GUT RENOVATION OF 1ST & 2ND FLOOR UNIT, TO INCLUDE RELOCATION OF EXT'G KITCHEN, RELOCATE EXT'G BATHROOM AND INSTALL NEW BATHROOMS. INSTALL NEW COMBI. BOILERS ON ALL FLOORS. RELOCATE EXT'G GAS METERS AT 1ST FLOOR TO OPEN SPACE
Q01068426-P3
11/12/2026
Filed — Alteration CO
HEREWITH FILED FOR A (1) STORY HORIZONTAL 83.44 SF ENLARGEMENT AT THE REAR OF AN EXT'G 3-STY 3-FAMILY BUILDING, CONVERT EXT'G GARGE INTO PART OF 1ST FLOOR DWELLING, MINOR STRUCTURAL & PARTITION WORK, PLUMBING FILED UNDER SEPARATE APPLICATION IN DOB NOW.
Q01215798-P1
08/11/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
Q01068426-S1-PL
05/28/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/07/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
60 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJ D Carrying Construc03/20/2026
DOB NOWPlumbingPermit IssuedOlympia Plbing & Heating08/11/2025
DOB NOWStructuralPermit IssuedJ D Carrying Construc08/08/2025
DOB NOWPlumbingPermit IssuedOlympia Plbing & Heating10/21/2024
DOB NOWGeneral ConstructionSigned-offVNG Service Renovation06/28/2024
1 project · most recent 11/12/2026
Gas Water/Sanitary
FiledStatusContractorScope
11/12/2026Permit IssuedOlympia Plbing & HeatingGas, Water/Sanitary
2 projects · most recent 01/14/2026
General Wiring
FiledStatusContractorScope
01/14/2026Permit IssuedGRX Euro ElectricGeneral Wiring
08/09/2024Permit IssuedT.M.T. ElectricGeneral Wiring
1 project · most recent 11/12/2026
FiledStatusContractorScope
11/12/2026Permit IssuedJ & D Carrying & Construction—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/28/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/10/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
11/19/2025HVAC-R and service water heating system controlsEBRAHIM MIANDOABIenergy_progress
11/19/2025Permanent certificateEBRAHIM MIANDOABIenergy_progress
11/19/2025Maintenance informationEBRAHIM MIANDOABIenergy_progress
11/19/2025Tenant Protection Plan ComplianceEBRAHIM MIANDOABIspecial
11/19/2025HVAC-R and service water heating equipmentEBRAHIM MIANDOABIenergy_progress
11/19/2025Energy Code Compliance InspectionsEBRAHIM MIANDOABIprogress
11/19/2025HVAC-R and service water piping design and insulationEBRAHIM MIANDOABIenergy_progress
11/19/2025Fire-Resistant Penetrations and JointsEBRAHIM MIANDOABIspecial
07/18/2025HVAC-R and service water heating equipmentEBRAHIM MIANDOABIenergy_progress
07/18/2025Fire-Resistant Penetrations and JointsEBRAHIM MIANDOABIspecial
07/18/2025Tenant Protection Plan ComplianceEBRAHIM MIANDOABIspecial
07/18/2025Energy Code Compliance InspectionsEBRAHIM MIANDOABIprogress
07/18/2025HVAC-R and service water heating system controlsEBRAHIM MIANDOABIenergy_progress
07/18/2025Maintenance informationEBRAHIM MIANDOABIenergy_progress
07/18/2025Permanent certificateEBRAHIM MIANDOABIenergy_progress
07/18/2025HVAC-R and service water piping design and insulationEBRAHIM MIANDOABIenergy_progress
06/19/2024Tenant Protection Plan ComplianceEBRAHIM MIANDOABIspecial
06/19/2024Interior lighting powerEBRAHIM MIANDOABIenergy_progress
06/19/2024Insulation placement and R valuesEBRAHIM MIANDOABIenergy_progress
06/19/2024Fire-Resistant Penetrations and JointsEBRAHIM MIANDOABIspecial
06/19/2024Fire-Resistance Rated ConstructionEBRAHIM MIANDOABIprogress
06/19/2024Energy Code Compliance InspectionsEBRAHIM MIANDOABIprogress
06/18/2024FinalEBRAHIM MIANDOABIprogress
42 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account