← Back
Two family frame
21-17 PARSONS BOULEVARD
QUEENS · Whitestone-Beechhurst · BIN 4624133
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
2,571 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 4,326 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivilGeneral
Roof1p · 1 filing · 12 docs
Floor 244p · 3 filings · 20 docs
Floor 137p · 2 filings · 20 docs
Cellar37p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD DESIGN STUDIO1607/08/2026
99 CONSTRUCTION503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC707/23/2025
JIMENEZ BUILDING CONSULTING LLC305/17/2024
JIAN ENGINEERING PLLC310/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO1003/21/2026
JRL SKYLINE1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
99 CONSTRUCTION INCGeneral Contractor1007/08/2026
ACER CONSTRUCTION INCGeneral Contractor303/21/2026
CATMAN PLUMBING INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010807/23/2025
JIAN ENGINEERING PLLC7397210/26/2022
Building Lifecycle
All (109)Filed (13)Permit Issued (9)Signed Off (4)Violation (9)Inspection (10)Objection (34)Special Inspection (30)
08/15/2025
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
08/15/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
XIUCHENG LI
08/15/2025
Special inspection requirement — Fenestration air leakage
XIUCHENG LI
08/15/2025
Special inspection requirement — Interior lighting power
XIUCHENG LI
08/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
08/15/2025
Special inspection requirement — Air barrier — testing
XIUCHENG LI
08/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
08/15/2025
Special inspection requirement — Maintenance information
XIUCHENG LI
08/15/2025
Special inspection requirement — Electric vehicle service equipment requirements
XIUCHENG LI
08/15/2025
Special inspection requirement — Fenestration areas
XIUCHENG LI
08/15/2025
Special inspection requirement — Air barrier - visual inspection
XIUCHENG LI
08/15/2025
Special inspection requirement — Insulation placement and R values
XIUCHENG LI
08/15/2025
Special inspection requirement — Chimneys and vents
XIUCHENG LI
08/15/2025
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
08/15/2025
Special inspection requirement — Metering
XIUCHENG LI
08/15/2025
Special inspection requirement — Permanent certificate
XIUCHENG LI
08/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIUCHENG LI
07/23/2025
Filed — New Building
NEW 2-STORY WITH CELLAR 2-FAMILY RESIDENTIAL BUILDING. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
Q00666668-P4
07/23/2025
Special inspection requirement — Air barrier — testing
XIUCHENG LI
07/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
07/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
07/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
07/23/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
XIUCHENG LI
07/23/2025
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
07/23/2025
Special inspection requirement — Chimneys and vents
XIUCHENG LI
07/23/2025
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
07/23/2025
Special inspection requirement — Insulation placement and R values
XIUCHENG LI
07/23/2025
Special inspection requirement — Fenestration areas
XIUCHENG LI
07/23/2025
Special inspection requirement — Permanent certificate
XIUCHENG LI
07/23/2025
Special inspection requirement — Air barrier - visual inspection
XIUCHENG LI
01/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/23/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/23/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/23/2024
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
07/29/2024
Signed off — Alteration
STRUCTURAL WORK & SUPPORT OF EXCAVATION WORK AS PER PLAN & IN CONJUNCTION WITH NEW BUILDING JOB# Q00666668-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q08002403-I1
06/12/2024
Signed off — Alteration
PROPOSED PLUMBING WORK FROM CELLAR TO 2ND FLOOR AS PER PLAN. IN CONJUNCTION WITH DOB NB JOB # Q00666668.NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00766058-I1
05/17/2024
Filed — New Building
NEW 2-STORY WITH CELLAR 2-FAMILY RESIDENTIAL BUILDING. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
Q00666668-P3
05/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/03/2024
Signed off — Alteration
THIS APPLICATION IS FILED TO ADD CONSTRUCTION FENCE WORK IN CONJUNCTION WITH D.O.B.NOW NB APPLICATION #Q00666668-I1. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
Q08013295-I1
04/26/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/26/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/26/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/26/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2024
Objection resolved — Addressed
04/22/2024
Objection resolved — Addressed
04/19/2024
Objection raised — Zoning
04/19/2024
Objection raised — Zoning
04/08/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
04/04/2024
Permit issued — General Construction
Q00666668-I1-GC
03/29/2024
Objection resolved — Addressed
03/22/2024
Permit issued — Plumbing
Q00766058-I1-PL
03/06/2024
Objection raised — Zoning
03/06/2024
Objection raised — Zoning
03/06/2024
Objection raised — Structural
02/02/2024
Objection raised — Scope
02/02/2024
Objection raised — Zoning
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC04/04/2024
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC03/22/2024
DOB NOWConstruction FenceSigned-offSONG DONG09/01/2023
DOB NOWCurb CutSigned-offSONG DONG09/01/2023
DOB NOWGeneral ConstructionPermit IssuedSONG DONG09/01/2023
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC12/23/2022
DOB NOWConstruction FenceSigned-offSONG DONG11/18/2022
DOB NOWStructuralSigned-offSONG DONG10/20/2022
DOB NOWGeneral ConstructionPermit IssuedSONG DONG05/31/2022
1 project · most recent 07/13/2022
General Wiring
FiledStatusContractorScope
07/13/2022CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/23/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
05/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/26/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
10/04/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
06/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/28/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
08/15/2025Fenestration air leakageXIUCHENG LIenergy_progress
08/15/2025HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
08/15/2025Fenestration and door U-factor and product ratingsXIUCHENG LIenergy_progress
08/15/2025Permanent certificateXIUCHENG LIenergy_progress
08/15/2025Exterior Insulation and Finish Systems (EIFS)XIUCHENG LIspecial
08/15/2025Chimneys and ventsXIUCHENG LIspecial
08/15/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
08/15/2025Concrete - Cast-In-PlaceXIUCHENG LIspecial
08/15/2025Fire-Resistance Rated ConstructionXIUCHENG LIprogress
08/15/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
08/15/2025Air barrier - visual inspectionXIUCHENG LIenergy_progress
08/15/2025Interior lighting powerXIUCHENG LIenergy_progress
08/15/2025Insulation placement and R valuesXIUCHENG LIenergy_progress
08/15/2025Electric vehicle service equipment requirementsXIUCHENG LIenergy_progress
08/15/2025Fenestration areasXIUCHENG LIenergy_progress
08/15/2025MeteringXIUCHENG LIenergy_progress
08/15/2025Air barrier — testing XIUCHENG LIenergy_progress
08/15/2025Maintenance informationXIUCHENG LIenergy_progress
07/23/2025Fenestration air leakageXIUCHENG LIenergy_progress
07/23/2025Air barrier - visual inspectionXIUCHENG LIenergy_progress
07/23/2025Maintenance informationXIUCHENG LIenergy_progress
07/23/2025Fenestration and door U-factor and product ratingsXIUCHENG LIenergy_progress
07/23/2025Chimneys and ventsXIUCHENG LIspecial
07/23/2025Concrete - Cast-In-PlaceXIUCHENG LIspecial
07/23/2025Exterior Insulation and Finish Systems (EIFS)XIUCHENG LIspecial
Latest 25 of 86.
▾Documents — 126 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/25/2026Q08002403-P2Request digital key ↗
08/25/2026Q08002403-P1Request digital key ↗
08/25/2026Q08002403-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits5
▸BISBPP-5 - Authorization to the Department of Transportation2
04/22/2024440761748Open ↗
12/17/2022440761748Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
06/07/2024440761748Open ↗
12/17/2022440761748Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
02/12/2025440761748Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026Q00666668-P4Open ↗
08/13/2026Q00666668-P2Open ↗
08/13/2026Q00666668-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q00666668-P4Open ↗
08/13/2026Q00666668-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/19/2024440761748Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
06/06/2024440761748Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00666668-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026Q08002403-I1Open ↗
09/01/2026Q08002403-I1Open ↗
09/01/2026Q00666668-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026Q08002403-I1Open ↗
09/01/2026Q08002403-I1Open ↗
09/01/2026Q08002403-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/26/2026Q00768994-I1Open ↗
08/25/2026Q08002403-P1Open ↗
08/25/2026Q08002403-I1Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/17/2022440761748Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/17/2022440761748Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026Q00666668-P4Open ↗
08/13/2026Q00666668-I1Open ↗
08/13/2026Q00666668-P3Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist5
08/19/2026Q00666668-P1Open ↗
08/19/2026Q00666668-P4Open ↗
08/19/2026Q00666668-P3Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
04/19/2024440761748Open ↗
12/17/2022440761748Open ↗
▸BISSTREET TREES SITE PLAN1
06/06/2024440761748Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/19/2024440761748Open ↗
▸BISSTREET TREE SIGNOFF1
06/06/2024440761748Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00666668-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00666668-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00666668-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00766058-I1Open ↗
▸Inspections & Test Reports1
▸BISBPP: FIELD INSPECTION1
02/12/2025440761748Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCURB CUT (CC) SIGNOFF1
06/06/2024440761748Open ↗
▸BISDOB APPROVAL FOR NEW CC1
04/19/2024440761748Open ↗
▸BISDPR APPROVAL FOR REMOVAL OF TREE AT CC1
02/12/2025440761748Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/12/2025440761748Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
02/12/2025440761748Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
02/12/2025440761748Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/17/2022440761748Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/17/2022440761748Open ↗
▸Other Documents25
▸DOB NOWSite Survey: Initial5
08/13/2026Q00666668-I1Open ↗
08/13/2026Q00666668-P2Open ↗
08/13/2026Q00666668-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026Q00666668-I1Open ↗
08/13/2026Q00666668-P4Open ↗
08/13/2026Q00666668-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/19/2026Q00666668-P1Open ↗
08/19/2026Q00666668-P3Open ↗
08/19/2026Q00666668-P4Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
02/12/2025440761748Open ↗
01/28/2025440761748Open ↗
12/17/2022440761748Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
06/21/2024440761748Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
02/12/2025440761748Open ↗
▸BISRP 6021
04/19/2024440761748Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
04/19/2024440761748Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
01/28/2025440761748Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
04/19/2024440761748Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00666668-I1Open ↗