← Back
Predominantly retail with other uses
21-19 MOTT AVENUE
QUEENS · BIN 4300206
💬 Discuss this project
1931Year Built
3Stories
K4Building Class
R6Zoning
5,900 sfGross Floor Area
6Units
Rent Stabilized16 Open Violations 15 unresolved · 1 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · 5,008 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 6 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FAR ROCKAWAY PHARMACY CORP503/22/2026
PATEL PRAVIN, PROPERTY OW203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAVID MILLNER ARCHITECTS104/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MRL EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEPHANIE SALMONGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DESIGN MILL LTD.2829104/04/2024
Building Lifecycle
All (45)Filed (1)Permit Issued (1)Signed Off (1)Violation (29)Inspection (2)Objection (8)Special Inspection (3)
01/09/2025
Signed off — Alteration
Repair fire damaged stairway roof and exterior walls to second floor from the exterior alley. Replace sheathing over existing stairway, insulate and install new roofing and siding where damaged by fire. Replace windows destroyed by F,.D.N.Y.
Q01027972-I1
01/02/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/27/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/04/2024
Permit issued — Structural
Q01027972-I1-GC-CX
04/25/2024
Objection resolved — Addressed
04/21/2024
Objection resolved — Addressed
04/21/2024
Objection resolved — Addressed
04/21/2024
Objection resolved — Addressed
04/15/2024
Objection raised — Structural
04/15/2024
Objection raised — Fire_Protection
04/15/2024
Objection raised — Fire_Protection
04/15/2024
Objection raised — Zoning
04/04/2024
Filed — Alteration
Repair fire damaged stairway roof and exterior walls to second floor from the exterior alley. Replace sheathing over existing stairway, insulate and install new roofing and siding where damaged by fire. Replace windows destroyed by F,.D.N.Y.
Q01027972-I1
03/29/2024
Special inspection requirement — Insulation placement and R values
David Millner
03/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Millner
03/29/2024
Special inspection requirement — Final
David Millner
01/15/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/15/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/04/2022
Violation issued (HPD, closed)
A
04/15/2021
Violation issued (HPD, closed)
A
12/05/2017
Violation issued (HPD, closed)
I
11/22/2016
Violation issued (HPD, closed)
I
10/25/2014
Violation issued (ECB, open)
Unknown
10/22/2008
Violation issued (FDNY_NOV, closed)
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/23/2006
Violation issued (ECB, closed)
Boilers
08/23/2006
Violation issued (ECB, closed)
Boilers
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/01/1997
Violation issued (HPD, open)
B
05/01/1997
Violation issued (HPD, closed)
B
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/16/1982
Violation issued (HPD, open)
B
04/16/1982
Violation issued (HPD, open)
A
04/16/1982
Violation issued (HPD, open)
B
04/16/1982
Violation issued (HPD, open)
B
04/16/1982
Violation issued (HPD, open)
A
04/16/1982
Violation issued (HPD, open)
A
04/16/1982
Violation issued (HPD, open)
B
04/16/1982
Violation issued (HPD, open)
C
04/16/1982
Violation issued (HPD, open)
B
04/16/1982
Violation issued (HPD, open)
B
04/16/1982
Violation issued (HPD, open)
B
04/16/1982
Violation issued (HPD, open)
B
06/29/1981
Violation issued (HPD, open)
B
06/29/1981
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSTEPHANIE SALMON09/04/2024
BISMHISSUEDTACO AIR COND. INC.01/21/1993
BISPLISSUEDKELLY PLG & HTG10/08/1992
BISOTISSUEDNORTHEAST INTERIORS INC07/17/1992
2 projects · most recent 09/10/2024
General Wiring
FiledStatusContractorScope
09/10/2024CompleteSPICE ELECTRIC COMPANYGeneral Wiring
11/28/2023Permit IssuedALL WAYS ELECTRIC CORP.W—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/02/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/27/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
03/29/2024Insulation placement and R valuesDavid Millnerenergy_progress
03/29/2024Fire-Resistant Penetrations and JointsDavid Millnerspecial
03/29/2024FinalDavid Millnerprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026Q01027972-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026Q01027972-I1Open ↗
08/25/2026Q01027972-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026Q01027972-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q01027972-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026Q01027972-I1Open ↗