← Back
Elevator apt, fireproof with stores
NY821_Avalon Bowery Place II
21 2 AVENUE · BIN 1087698
💬 Discuss this project
2007Year Built
7Stories
D6Building Class
R8BZoning
115,187 sfGross Floor Area
99Units
LL97 CoveredRent Stabilized7 Open Violations ▸FISP: SAFE
Elevator apt, fireproof with stores · Owner of record: AVB BOWERY II, LLC · 25,839 sf lot · 4.46 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire Protection
Roof3p · 3 filings · 12 docs
Floor 16p · 1 filing · 13 docs
Cellar2p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVALONBAY COMMUNITIES8307/08/2026
MOMOFUKU RESTAURANT GROUP1007/08/2026
AVB BOWERY II, LLC203/22/2026
CVPP 111 LLC103/22/2026
LAQUILA GROUP103/22/2026
795 5TH AVE CORP. C/O103/22/2026
CUP 111603/21/2026
CONSTRUCTION SERVICES CONSULTING103/21/2026
AVALONBAY COMMUNITIES INC REIT203/21/2026
CVP 111403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/19/2018$73.2M—CVP III, LLC → AVB BOWERY II, LLC$635/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IDA GALEA, ARCHITECT203/21/2026
CONCEPT DESIGN GROUP503/21/2026
RICHARD LEWIS ARCHITECT103/21/2026
DOMANI CONSULTING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PAR PLUMBING CO., INCPlumbing403/22/2026
J. CAIAZZO PLBG & HTG CORPlumbing306/28/2026
AVALONBAY NYC DEVELOPMENTGeneral Contractor303/21/2026
PUMPING SOL PLBG & MECH IPlumbing207/08/2026
KANARIS CONTRACTING CORPGeneral Contractor203/21/2026
STREAMLINE USA LLCGeneral Contractor107/08/2026
J. CAIAZZO PLBG & HTG CORPFire Protection107/08/2026
R.J.ELECTRICAL CONTRACTORElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CDG ARCHITECTS LLC /DBA:1327509/16/2025
JACK GREEN ASSOCIATES422106/12/2024
TSF ENGINEERING, PC1274110/02/2020
BAZINI ENGINEERING, P.C.1808101/13/2020
Building Lifecycle
All (84)Permit Issued (7)Facade (FISP) (6)Violation (60)Inspection (11)
01/14/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/30/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/05/2025
Violation issued (ECB, closed)
Construction
07/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/24/2025
Permit issued — Sprinklers
M01130425-S2-EW-SP
02/24/2025
Permit issued — Plumbing
M01130425-S1-PL
07/09/2024
Permit issued — Mechanical Systems
M01061187-I1-MS
05/15/2023
Violation issued (HPD, closed)
C
05/15/2023
Violation issued (HPD, closed)
C
05/15/2023
Violation issued (HPD, closed)
B
05/15/2023
Violation issued (HPD, closed)
C
05/15/2023
Violation issued (HPD, closed)
C
05/15/2023
Violation issued (HPD, closed)
C
05/15/2023
Violation issued (HPD, closed)
C
05/15/2023
Violation issued (HPD, closed)
C
05/15/2023
Violation issued (HPD, closed)
C
02/16/2023
Cycle 9 facade report submitted
02/15/2023
Cycle 9 facade report signed — SAFE
12/29/2022
Cycle 9 facade inspection completed
12/04/2021
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/22/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/19/2021
Permit issued — Plumbing
M00397344-I1-PL
07/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/07/2021
Permit issued — Plumbing
M00397344-I1-PL
10/06/2020
Permit issued — Mechanical Systems
M00402014-I1-MS
05/29/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/29/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/23/2020
Permit issued — Mechanical Systems
M00199318-I1-MS
05/23/2017
Cycle 8 facade report submitted
05/23/2017
Cycle 8 facade report signed — SAFE
05/17/2017
Cycle 8 facade inspection completed
04/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/18/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/18/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/11/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/11/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/15/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/15/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/25/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/25/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2007
Violation issued (ECB, closed)
Elevators
04/02/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/17/2007
Violation issued (ECB, closed)
Site Safety
10/19/2006
Violation issued (ECB, closed)
Construction
09/15/2006
Violation issued (ECB, closed)
Construction
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/18/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offANTHONY CAIAZZO02/24/2025
DOB NOWPlumbingPermit IssuedJ. CAIAZZO PLBG & HTG COR02/24/2025
DOB NOWMechanical SystemsSigned-offKANARIS CONTRACTING CORP07/09/2024
DOB NOWPlumbingSigned-offJAG PLUMBING & MECHANICAL07/19/2021
DOB NOWPlumbingSigned-offJAG PLUMBING & MECHANICAL03/07/2021
DOB NOWMechanical SystemsSigned-offSTREAMLINE USA LLC10/06/2020
DOB NOWMechanical SystemsSigned-offAVALONBAY NYC DEVELOPMENT01/23/2020
BISSPISSUEDSTANDARD FIRE SUPP CORP03/06/2019
BISSPISSUEDILG MECH SERVICES,INC12/11/2017
BISPLISSUEDWATER DYNAMIC P & H CORP11/08/2017
BISFPISSUEDALLIED FIRE CONTROL SVCS09/15/2017
BISEQISSUEDCONSTRUCTION SVS CON NY08/28/2017
BISMHISSUEDSTREAMLINE USA LLC08/14/2017
BISMHISSUEDSTREAMLINE USA LLC08/14/2017
BISOTISSUEDSTREAMLINE USA LLC08/14/2017
BISOTISSUEDSTREAMLINE USA LLC08/14/2017
BISMHISSUEDSTRUCTURE VENTURES LLC05/15/2017
BISFPISSUEDRELIABLE FIRE PROT. INC12/02/2016
BISSDISSUEDBROOK PLUMBING & HTG CORP11/10/2016
BISSPISSUEDBROOK PLUMBING & HTG CORP11/10/2016
BISPLISSUEDMARATHON MECHANICAL LLC09/07/2016
BISPLISSUEDBROOK PLUMBING & HTG CORP09/22/2015
BISSPISSUEDBROOK PLUMBING & HTG CORP07/16/2015
BISPLISSUEDTW PLUMBING & HEATING INC06/26/2015
BISOTISSUEDTITAN REALTY & CONSTRUCTI06/01/2015
BISOTISSUEDTITAN REALTY & CONSTRUCTI04/29/2015
BISMHISSUEDTITAN REALTY & CONSTRUCTI04/29/2015
BIS—ISSUEDINTERBORO SIGN & ELECL MA03/09/2015
BIS—ISSUEDINTERBORO SIGN & ELECL MA02/26/2015
BISOTISSUEDZ-CAR-D CORP01/09/2015
BISSPISSUEDCASE PLUMBING LLC10/15/2014
BISFPISSUEDMASTER FIRE SYSTEMS, INC09/19/2014
BISPLISSUEDTW PLUMBING & HEATING INC08/06/2014
BISOTISSUEDSTRUCTURE NYC INC08/04/2014
BISOTISSUEDSTRUCTURE NYC INC08/04/2014
BISMHISSUEDSTRUCTURE NYC INC08/04/2014
BISEQISSUEDSTRUCTURE NYC INC08/04/2014
BISOTISSUEDNORTHEAST INTERIORS SPECI05/15/2014
BIS—ISSUEDL.S. SIGN CO., INC06/05/2013
BIS—ISSUEDL.S. SIGN CO., INC06/05/2013
+ 17 more permits on file
1 project · most recent 09/16/2025
Ventilation Systems
FiledStatusContractorScope
09/16/2025——Ventilation Systems
1 project · most recent 09/16/2025
FiledStatusContractorScope
09/16/2025Signed-offJ. CAIAZZO PLBG & HTG COR15 heads
2 projects · most recent 09/16/2025
Water/Sanitary Gas
FiledStatusContractorScope
09/16/2025Permit IssuedJ. CAIAZZO PLBG & HTG CORGas, Water/Sanitary
02/16/2021Signed-offPUMPING SOL PLBG & MECH IWater/Sanitary
3 projects · most recent 12/17/2020
General Wiring
FiledStatusContractorScope
12/17/2020CompleteMIKOMA ELECTRIC LLCGeneral Wiring
03/28/2019CompleteDELCO ELECTRICAL CORP.General Wiring
12/06/2017Permit IssuedR.J.ELECTRICAL CONTRACTORGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/14/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/04/2021Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/22/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
09/18/2025Fire-Resistant Penetrations and JointsYongho Kimspecial
09/18/2025Tenant Protection Plan ComplianceYongho Kimspecial
09/10/2025Sprinkler SystemsYongho Kimspecial
09/10/2025Tenant Protection Plan Compliance—special
09/08/2025Tenant Protection Plan Compliance—special
09/08/2025Fire-Resistant Penetrations and JointsYongho Kimspecial
09/21/2020HVAC and service water heating system controls Nicholas Tuccienergy_progress
09/21/2020FinalNicholas Tucciprogress
09/21/2020Mechanical SystemsNicholas Tuccispecial
09/21/2020Maintenance informationNicholas Tuccienergy_progress
Nothing on file for this building.