← Back
QUEENS
21-20 GAR FRANCIS LEWIS BOULEVARD
QUEENS · Bay Terrace-Clearview · BIN 4623715
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
Structural
Floor 11 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC204/24/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TT&T CONSTRUCTION INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506204/24/2023
Building Lifecycle
All (30)Filed (2)Permit Issued (1)Signed Off (1)Inspection (6)Special Inspection (20)
08/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2023
Signed off — New Building
Q00519598-I1
06/15/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/12/2023
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Final
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Masonry
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Concrete - Cast-In-Place
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Footing and Foundation
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
06/12/2023
Special inspection requirement — Electric vehicle service equipment requirements
XIAOHONG ZHAO
04/24/2023
Filed — New Building
Q00519598-P1
04/20/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/20/2023
Special inspection requirement — Concrete - Cast-In-Place
XIAOHONG ZHAO
04/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
04/20/2023
Special inspection requirement — Masonry
XIAOHONG ZHAO
04/20/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
04/20/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
04/20/2023
Special inspection requirement — Final
XIAOHONG ZHAO
04/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
04/20/2023
Special inspection requirement — Footing and Foundation
XIAOHONG ZHAO
04/20/2023
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
04/20/2023
Special inspection requirement — Electric vehicle service equipment requirements
XIAOHONG ZHAO
08/09/2021
Permit issued — Foundation
Q00519598-I1-GC-CX
05/12/2021
Filed — New Building
Q00519598-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedTT&T CONSTRUCTION INC08/09/2021
1 project · most recent 02/01/2023
General Wiring
FiledStatusContractorScope
02/01/2023CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/15/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/20/2023Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
06/12/2023Interior lighting powerXIAOHONG ZHAOenergy_progress
06/12/2023FinalXIAOHONG ZHAOprogress
06/12/2023MasonryXIAOHONG ZHAOspecial
06/12/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
06/12/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
06/12/2023Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
06/12/2023Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
06/12/2023Footing and FoundationXIAOHONG ZHAOprogress
06/12/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
06/12/2023Electric vehicle service equipment requirementsXIAOHONG ZHAOenergy_progress
04/20/2023Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
04/20/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
04/20/2023MasonryXIAOHONG ZHAOspecial
04/20/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
04/20/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
04/20/2023FinalXIAOHONG ZHAOprogress
04/20/2023Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
04/20/2023Footing and FoundationXIAOHONG ZHAOprogress
04/20/2023Interior lighting powerXIAOHONG ZHAOenergy_progress
04/20/2023Electric vehicle service equipment requirementsXIAOHONG ZHAOenergy_progress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026Q00519598-P1Request digital key ↗
08/24/2026Q00519598-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00519598-I1Open ↗
08/13/2026Q00519598-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00519598-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/24/2026Q00519598-P1Open ↗
08/24/2026Q00519598-P1Open ↗
08/22/2026Q00519598-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026Q00519598-I1Open ↗
08/24/2026Q00519598-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026Q00519598-P1Open ↗
08/22/2026Q00519598-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026Q00519598-I1—
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00519598-I1Open ↗
08/13/2026Q00519598-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00519598-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00519598-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026Q00519598-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026Q00519598-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026Q00519598-I1Open ↗
08/13/2026Q00519598-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00519598-I1Open ↗
08/13/2026Q00519598-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00519598-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026Q00519598-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00519598-I1Open ↗