← Back
One family attached or semi-detached
21-26 37 STREET
QUEENS · BIN 4016540
💬 Discuss this project
1925Year Built
2Stories
A5Building Class
R5BZoning
1,376 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
One family attached or semi-detached · 2,000 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 15 docs
Floor 2Under Construction2 filings · 15 docs
Floor 1Under Construction2 filings · 15 docs
CellarUnder Construction1 filing · 12 docs
Sub-BasementUnder Construction1 filing · 3 docs
1 job · most recent 04/27/2026
FiledStatusContractorScope
04/27/2026Permit IssuedSERENA CONSTR MGMT INC1 scope_items
Building Lifecycle
All (41)Filed (2)Permit Issued (2)Violation (1)Objection (18)Special Inspection (18)
09/25/2026
Permit issued — Earth Work
Q01386299-I1-GC
09/11/2026
Objection raised — Other
09/11/2026
Objection resolved — Addressed
06/24/2026
Objection resolved — Addressed
06/02/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/26/2026
Objection resolved — Addressed
05/26/2026
Objection resolved — Addressed
05/26/2026
Objection resolved — Addressed
05/26/2026
Objection resolved — Addressed
05/26/2026
Objection resolved — Addressed
05/26/2026
Special inspection requirement — Protection of exposed foundation insulation
05/26/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
05/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/26/2026
Special inspection requirement — Masonry
05/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/26/2026
Special inspection requirement — Interior lighting power
05/26/2026
Special inspection requirement — Concrete - Cast-In-Place
05/26/2026
Special inspection requirement — Air barrier - visual inspection
05/26/2026
Special inspection requirement — Permanent certificate
05/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/26/2026
Special inspection requirement — Fenestration air leakage
05/26/2026
Special inspection requirement — Electric vehicle service equipment requirements
05/26/2026
Special inspection requirement — Fenestration areas
05/26/2026
Special inspection requirement — Insulation placement and R values
05/26/2026
Special inspection requirement — Metering
05/26/2026
Special inspection requirement — Maintenance information
05/25/2026
Objection resolved — Addressed
05/25/2026
Objection resolved — Addressed
05/09/2026
Objection raised — Energy
05/09/2026
Objection raised — Zoning
05/09/2026
Objection raised — Other
05/09/2026
Objection raised — Zoning
05/09/2026
Objection raised — Fire_Protection
05/09/2026
Objection raised — Structural
05/09/2026
Objection raised — Other
05/09/2026
Objection raised — Other
04/27/2026
Filed — Alteration CO
CONVERTION FROM 1 TO 2 FAMILY AND 2 STORY EXTENTION IN THE REAR AND GENERAL RENOVATION.
Q01386299-I1
04/13/2026
Special inspection requirement — Final
04/13/2026
Special inspection requirement — Footing and Foundation
04/01/2026
Permit issued — General Construction
Q01371437-I1-GC
03/20/2026
Filed — Alteration
Interior demolition of non-load bearing walls, removal of all interior finishes and fixtures including, but not limited to the following; doors, door frames, trim, windows, cabinetry, and shelves as per plans filed here with.
Q01371437-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SERENA CONSTRUCTION MANAGEMENT209/26/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANTHONY CUCICH ARCHITECT104/27/2026
PULLUMB KALEMI103/20/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SERENA CONSTR MGMT INCGeneral Contractor209/26/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedSERENA CONSTR MGMT INC09/25/2026
DOB NOWGeneral ConstructionPermit IssuedSERENA CONSTR MGMT INC04/01/2026
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
05/26/2026Protection of exposed foundation insulation—energy_progress
05/26/2026Excavations - Sheeting, Shoring, and Bracing—special
05/26/2026Fire-Resistant Penetrations and Joints—special
05/26/2026Masonry—special
05/26/2026Structural Stability – Alterations of existing buildings—special
05/26/2026Interior lighting power—energy_progress
05/26/2026Concrete - Cast-In-Place—special
05/26/2026Air barrier - visual inspection—energy_progress
05/26/2026Permanent certificate—energy_progress
05/26/2026Fenestration and door U-factor and product ratings—energy_progress
05/26/2026Fenestration air leakage—energy_progress
05/26/2026Electric vehicle service equipment requirements—energy_progress
05/26/2026Fenestration areas—energy_progress
05/26/2026Insulation placement and R values—energy_progress
05/26/2026Metering—energy_progress
05/26/2026Maintenance information—energy_progress
04/13/2026Final—progress
04/13/2026Footing and Foundation—progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026Q01371437-I1Request digital key ↗
08/15/2026Q01386299-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026Q01386299-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026Q01386299-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026Q01371437-I1Open ↗
08/17/2026Q01386299-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026Q01386299-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026Q01371437-I1Open ↗
08/15/2026Q01386299-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/15/2026Q01386299-I1Open ↗
▸Other Documents5
▸DOB NOWPlot Diagram1
08/15/2026Q01386299-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026Q01386299-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026Q01386299-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026Q01386299-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/15/2026Q01386299-I1Open ↗