DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB02/12/19994F55
DOB04/02/1997V-DOB VIOLATION - ACTIVE
DOB01/13/1997V-DOB VIOLATION - ACTIVE
ECB10/29/1992EXIT DOOR TOTAL OBSTRUCTION SECONDARY EGRESS DOOR AT 1ST FLOOR,WEST OBSTRUCTED BY DOXES AND CRATES. REMEDY: REMOVE THE OBSTRUCTION FORTH- WITH.Nothing owed — awaiting certificate of correction
Factory, heavy manufacturing, fireproof · 29,600 sf lot · 1.95 FAR built · Flood zone X