← Back
Five to six families
21-49 41 STREET
QUEENS · BIN 4015416
💬 Discuss this project
1930Year Built
3Stories
C2Building Class
R5Zoning
5,300 sfGross Floor Area
6Units
Rent Stabilized16 Open Violations 15 unresolved · 1 paperwork only ▸FDNY Report ↗
Five to six families · Owner of record: MAL REALTY CORP · 2,500 sf lot · 2.12 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MAL REALTY707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.109/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851109/07/2022
Building Lifecycle
All (69)Filed (1)Permit Issued (1)Signed Off (1)Violation (60)Inspection (1)Special Inspection (5)
04/12/2024
Violation issued (HPD, closed)
A
11/24/2023
Violation issued (HPD, closed)
I
09/19/2023
Violation issued (HPD, open)
C
08/14/2023
Violation issued (HPD, closed)
C
04/03/2023
Violation issued (HPD, open)
B
04/03/2023
Violation issued (HPD, open)
C
04/03/2023
Violation issued (HPD, open)
B
04/03/2023
Violation issued (HPD, closed)
C
03/28/2023
Signed off — Alteration
Q00798351-I1
03/27/2023
Violation issued (HPD, open)
C
03/17/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/30/2022
Violation issued (HPD, closed)
C
11/30/2022
Violation issued (HPD, closed)
C
11/30/2022
Violation issued (HPD, closed)
C
11/30/2022
Violation issued (HPD, closed)
C
09/15/2022
Permit issued — Boiler Equipment
Q00798351-I1-BE
09/07/2022
Filed — Alteration
Q00798351-I1
09/07/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
09/07/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
09/07/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
09/07/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
08/23/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
03/03/2022
Violation issued (HPD, closed)
A
12/18/2021
Violation issued (HPD, closed)
C
10/19/2021
Violation issued (HPD, closed)
C
10/19/2021
Violation issued (HPD, closed)
A
10/19/2021
Violation issued (HPD, closed)
A
10/19/2021
Violation issued (HPD, closed)
C
09/30/2021
Violation issued (HPD, closed)
A
09/30/2021
Violation issued (HPD, closed)
A
09/30/2021
Violation issued (HPD, closed)
A
09/08/2021
Violation issued (HPD, closed)
B
09/08/2021
Violation issued (HPD, closed)
A
04/26/2021
Violation issued (HPD, closed)
B
04/26/2021
Violation issued (HPD, closed)
A
04/26/2021
Violation issued (HPD, closed)
B
03/04/2020
Violation issued (HPD, closed)
C
03/29/2019
Violation issued (HPD, open)
A
03/29/2019
Violation issued (HPD, closed)
A
03/29/2019
Violation issued (HPD, closed)
A
01/27/2019
Violation issued (HPD, closed)
B
11/11/2018
Violation issued (HPD, open)
A
11/11/2018
Violation issued (HPD, closed)
A
11/11/2018
Violation issued (HPD, closed)
A
11/11/2018
Violation issued (HPD, closed)
A
09/10/2018
Violation issued (HPD, closed)
A
09/10/2018
Violation issued (HPD, closed)
A
09/10/2018
Violation issued (HPD, closed)
A
03/26/2018
Violation issued (HPD, closed)
B
03/26/2018
Violation issued (HPD, closed)
B
12/01/2017
Violation issued (HPD, closed)
I
10/30/2017
Violation issued (HPD, closed)
C
11/17/2016
Violation issued (HPD, closed)
I
05/14/2015
Violation issued (HPD, open)
C
02/26/2015
Violation issued (HPD, closed)
I
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/2011
Violation issued (ECB, open)
Construction
01/11/2011
Violation issued (HPD, closed)
B
01/11/2011
Violation issued (HPD, open)
B
01/11/2011
Violation issued (HPD, open)
B
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offALLISON A. HEANEY09/15/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/17/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/07/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
09/07/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
09/07/2022Maintenance informationLOUIS ARENAenergy_progress
09/07/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
08/23/2022Heating SystemsLOUIS ARENAspecial
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/25/2026Q00798351-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00798351-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026Q00798351-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q00798351-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00798351-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00798351-I1Open ↗