← Back
Two family frame
21-51 41 STREET
QUEENS · Astoria (North)-Ditmars-Steinway · BIN 4015415
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R5Zoning
1,870 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Cellar18p · 1 filing · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAURA HEIM ARCHITECT PLLC805/12/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JME BUILDING CONSULTING1003/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AIS RENOVATIONS CORPGeneral Contractor307/08/2026
THOMAS F. CASH & SONS INCPlumbing207/08/2026
MIKHAIL UMANSKIYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416504/02/2026
Building Lifecycle
All (58)Filed (8)Permit Issued (5)Signed Off (2)Inspection (7)Objection (10)Special Inspection (26)
08/06/2026
Signed off — Alteration
PLUMBING WORK ASSOCIATED W/ ARCHITECTURAL RENOVATIONS IN A R-3 DWELLING IN CELLAR LEVEL OF 2 STORY, 2 FAMILY RESIDENTIAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01055664-S2
05/12/2026
Filed — Alteration
PLUMBING WORK ASSOCIATED W/ ARCHITECTURAL RENOVATIONS IN A R-3 DWELLING IN CELLAR LEVEL OF 2 STORY, 2 FAMILY RESIDENTIAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01055664-P2
05/01/2026
Special inspection requirement — Mechanical Systems
ELIAS RASABI
05/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
05/01/2026
Special inspection requirement — Ventilation and air distribution system
ELIAS RASABI
05/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
05/01/2026
Special inspection requirement — Maintenance information
ELIAS RASABI
05/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
05/01/2026
Special inspection requirement — Final
ELIAS RASABI
05/01/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
04/02/2026
Filed — Alteration
PLUMBING WORK ASSOCIATED W/ ARCHITECTURAL RENOVATIONS IN A R-3 DWELLING IN CELLAR LEVEL OF 2 STORY, 2 FAMILY RESIDENTIAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01055664-P3
02/17/2026
Permit issued — General Construction
Q00935900-I1-GC
08/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/01/2025
Objection resolved — Addressed
07/02/2025
Objection raised — Admin
07/02/2025
Objection resolved — Addressed
06/24/2025
Objection resolved — Addressed
06/17/2025
Filed — Alteration
PLUMBING WORK ASSOCIATED W/ ARCHITECTURAL RENOVATIONS IN A R-3 DWELLING IN CELLAR LEVEL OF 2 STORY, 2 FAMILY RESIDENTIAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01055664-P1
05/30/2025
Signed off — Alteration
PLUMBING WORK ASSOCIATED W/ ARCHITECTURAL RENOVATIONS IN A R-3 DWELLING IN CELLAR LEVEL OF 2 STORY, 2 FAMILY RESIDENTIAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01055664-I1
05/20/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/09/2025
Objection raised — Other
04/01/2025
Objection resolved — Addressed
02/28/2025
Objection resolved — Addressed
01/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/16/2025
Permit issued — Plumbing
Q01055664-S1-PL
11/21/2024
Permit issued — Plumbing
Q01055664-S1-PL
10/15/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/10/2024
Permit issued — General Construction
Q01055664-I1-GC
10/10/2024
Permit issued — Mechanical Systems
Q01055664-S2-MS
09/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/01/2024
Filed — Alteration
PLUMBING WORK ASSOCIATED W/ ARCHITECTURAL RENOVATIONS IN A R-3 DWELLING IN CELLAR LEVEL OF 2 STORY, 2 FAMILY RESIDENTIAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01055664-S2
08/01/2024
Filed — Alteration
PLUMBING WORK ASSOCIATED W/ ARCHITECTURAL RENOVATIONS IN A R-3 DWELLING IN CELLAR LEVEL OF 2 STORY, 2 FAMILY RESIDENTIAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01055664-S1
07/12/2024
Filed — Alteration
PLUMBING WORK ASSOCIATED W/ ARCHITECTURAL RENOVATIONS IN A R-3 DWELLING IN CELLAR LEVEL OF 2 STORY, 2 FAMILY RESIDENTIAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01055664-I1
10/12/2023
Objection raised — Scope
10/12/2023
Objection raised — Zoning
10/12/2023
Objection raised — Zoning
10/11/2023
Filed — Alteration
Home renovation consisting of replacing porch roof, columns and railing, siding and stucco, replace windows and widening kitchen window, and replace rear stoop and stairs.
Q00935900-S2
10/10/2023
Filed — Alteration
Home renovation consisting of replacing porch roof, columns and railing, siding and stucco, replace windows and widening kitchen window, and replace rear stoop and stairs.
Q00935900-I1
09/22/2023
Special inspection requirement — Preliminary
ELIAS RASABI
09/19/2023
Special inspection requirement — Permanent certificate
ELIAS RASABI
09/19/2023
Special inspection requirement — Insulation placement and R values
ELIAS RASABI
09/19/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
ELIAS RASABI
09/19/2023
Special inspection requirement — Fenestration air leakage
ELIAS RASABI
09/19/2023
Special inspection requirement — Air barrier - visual inspection
ELIAS RASABI
09/19/2023
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
09/19/2023
Special inspection requirement — Final
ELIAS RASABI
09/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
09/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
09/19/2023
Special inspection requirement — Concrete - Cast-In-Place
ELIAS RASABI
09/19/2023
Special inspection requirement — Masonry
ELIAS RASABI
09/19/2023
Special inspection requirement — Post-installed Anchors
ELIAS RASABI
09/19/2023
Special inspection requirement — Structural Steel - Details
ELIAS RASABI
09/19/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
ELIAS RASABI
09/19/2023
Special inspection requirement — Final
ELIAS RASABI
09/19/2023
Special inspection requirement — Structural Wood Frame
ELIAS RASABI
09/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAIS RENOVATIONS CORP02/17/2026
DOB NOWPlumbingPermit IssuedTHOMAS F. CASH & SONS INC01/16/2025
DOB NOWPlumbingPermit IssuedTHOMAS F. CASH & SONS INC11/21/2024
DOB NOWGeneral ConstructionSigned-offAIS RENOVATIONS CORP10/10/2024
DOB NOWMechanical SystemsSigned-offAIS RENOVATIONS CORP10/10/2024
BISPLISSUEDNYC PLUMBING & HEATING IN12/21/2007
BISOTISSUEDKETCO CONSTR LLC11/19/2007
1 project · most recent 05/12/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/12/2026Permit IssuedTHOMAS F. CASH & SONS INCGas, Water/Sanitary
1 project · most recent 11/14/2025
General Wiring
FiledStatusContractorScope
11/14/2025CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 10/11/2023
Steel Concrete Masonry Wood
FiledStatusContractorScope
10/11/2023Signed-offAIS RENOVATIONS CORPSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
05/01/2026Mechanical SystemsELIAS RASABIspecial
05/01/2026HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
05/01/2026Ventilation and air distribution systemELIAS RASABIenergy_progress
05/01/2026HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
05/01/2026Maintenance informationELIAS RASABIenergy_progress
05/01/2026HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
05/01/2026FinalELIAS RASABIprogress
05/01/2026Energy Code Compliance InspectionsELIAS RASABIprogress
09/22/2023PreliminaryELIAS RASABIprogress
09/19/2023Permanent certificateELIAS RASABIenergy_progress
09/19/2023Insulation placement and R valuesELIAS RASABIenergy_progress
09/19/2023Fenestration and door U-factor and product ratingsELIAS RASABIenergy_progress
09/19/2023Fenestration air leakageELIAS RASABIenergy_progress
09/19/2023Air barrier - visual inspectionELIAS RASABIenergy_progress
09/19/2023Energy Code Compliance InspectionsELIAS RASABIprogress
09/19/2023FinalELIAS RASABIprogress
09/19/2023Fire-Resistant Penetrations and JointsELIAS RASABIspecial
09/19/2023Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
09/19/2023Concrete - Cast-In-PlaceELIAS RASABIspecial
09/19/2023MasonryELIAS RASABIspecial
09/19/2023Post-installed AnchorsELIAS RASABIspecial
09/19/2023Structural Steel - DetailsELIAS RASABIspecial
09/19/2023Subsurface Conditions – Fill Placement & In-Place DensityELIAS RASABIspecial
09/19/2023FinalELIAS RASABIprogress
09/19/2023Structural Wood FrameELIAS RASABIprogress
Latest 25 of 26.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026Q00935900-S2Request digital key ↗
08/24/2026Q00935900-I1Request digital key ↗
08/16/2026Q01055664-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/16/2026Q01055664-I1Open ↗
08/16/2026Q01055664-P3Open ↗
08/16/2026Q01055664-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/25/2026Q01055664-S2Open ↗
09/25/2026Q01055664-S2Open ↗
08/31/2026Q00935900-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/25/2026Q01055664-S2Open ↗
08/31/2026Q00935900-S2Open ↗
08/31/2026Q00935900-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/16/2026Q01055664-I1Open ↗
08/16/2026Q01055664-S2Open ↗
08/16/2026Q01055664-S1Open ↗
Showing 3 of 4 on file for this type