← Back
One family attached or semi-detached
21 BIRCHARD AVENUE
💬 Discuss this project
1980Year Built
2Stories
A5Building Class
R3-1Zoning
1,606 sfGross Floor Area
1Units
One family attached or semi-detached · 3,167 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 24p · 1 filing · 13 docs
Floor 16p · 1 filing · 13 docs
Cellar4p · 1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC410/11/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GMJ ELECTRIC CORPElectrical103/22/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
Building Lifecycle
All (23)Filed (4)Permit Issued (1)Signed Off (1)Inspection (5)Special Inspection (12)
11/15/2023
Signed off — Alteration
IN-KIND REPLACEMENT OF GAS AND PLUMBING FIXTURE IN THE CELLAR. FIRST FLOOR AND SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00514598-I1
10/14/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
10/14/2021
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
10/14/2021
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
10/11/2021
Filed — Alteration
IN-KIND REPLACEMENT OF GAS AND PLUMBING FIXTURE IN THE CELLAR. FIRST FLOOR AND SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00514598-P3
09/15/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
09/15/2021
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
09/15/2021
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
09/14/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/02/2021
Filed — Alteration
IN-KIND REPLACEMENT OF GAS AND PLUMBING FIXTURE IN THE CELLAR. FIRST FLOOR AND SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00514598-P2
08/24/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
08/24/2021
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
08/24/2021
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
06/17/2021
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
06/10/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/03/2021
Filed — Alteration
IN-KIND REPLACEMENT OF GAS AND PLUMBING FIXTURE IN THE CELLAR. FIRST FLOOR AND SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00514598-P1
06/02/2021
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
06/02/2021
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
06/02/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
05/21/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/13/2021
Permit issued — Plumbing
S00514598-I1-PL
05/03/2021
Filed — Alteration
IN-KIND REPLACEMENT OF GAS AND PLUMBING FIXTURE IN THE CELLAR. FIRST FLOOR AND SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00514598-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP05/13/2021
BISOTISSUEDHYTECH SOLAR INC07/25/2023
2 projects · most recent 07/26/2023
General Wiring
FiledStatusContractorScope
07/26/2023CompleteGMJ ELECTRIC CORP—
05/19/2021CompleteACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/14/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/09/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/17/2021No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
06/10/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/21/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/14/2021HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
10/14/2021HVAC-R and service water heating equipmentSteven Savinoenergy_progress
10/14/2021HVAC-R and service water heating system controlsSteven Savinoenergy_progress
09/15/2021HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
09/15/2021HVAC-R and service water heating equipmentSteven Savinoenergy_progress
09/15/2021HVAC-R and service water heating system controlsSteven Savinoenergy_progress
08/24/2021HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
08/24/2021HVAC-R and service water heating equipmentSteven Savinoenergy_progress
08/24/2021HVAC-R and service water heating system controlsSteven Savinoenergy_progress
06/02/2021HVAC-R and service water heating equipmentSteven Savinoenergy_progress
06/02/2021HVAC-R and service water heating system controlsSteven Savinoenergy_progress
06/02/2021HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026S00514598-P2Request digital key ↗
08/25/2026S00514598-P1Request digital key ↗
08/25/2026S00514598-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
07/25/2023540254437Open ↗
▸BISWORK PERMIT APPLICATION1
07/25/2023540254437Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026S00514598-P2Open ↗
08/25/2026S00514598-P1Open ↗
08/25/2026S00514598-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/19/2026S00514598-I1Open ↗
09/01/2026S00514598-P1Open ↗
08/26/2026S00514598-P3Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/25/2023540254437Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/25/2023540254437Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/25/2023540254437Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
07/25/2023540254437Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/25/2023540254437Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/18/2024540254437Open ↗
07/25/2023540254437Open ↗
07/25/2023540254437Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/25/2023540254437Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/18/2024540254437Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/25/2023540254437Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
01/18/2024540254437Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00514598-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/18/2024540254437Open ↗
07/25/2023540254437Open ↗
07/25/2023540254437Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/22/2024540254437Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
01/18/2024540254437Open ↗
▸BISCOST AFFIDAVIT1
07/25/2023540254437Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/25/2023540254437Open ↗
▸Other Documents1
▸BISTax Abatement Miscellaneous1
01/22/2024540254437Open ↗