← Back
Converted dwellings or rooming house
21 BLEECKER STREET
MANHATTAN · BIN 1008446
💬 Discuss this project
1830Year Built
4Stories
C5Building Class
M1-5/R7XZoning
6,515 sfGross Floor Area
5Units
0 Open Violations
Converted dwellings or rooming house · Owner of record: 21-23 BLEECKER STREET OWNERS CORP. · 2,640 sf lot · 2.47 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 2 filings · 20 docs
Floor 21p · 1 filing · 19 docs
Floor 1
Basement1p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
21-23 BLEEKER STREET OWNERS1709/13/2026
21-23 BLEECKER STREET703/22/2026
21 BLEECKER STREET OWNERS CORP2003/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NORFAST CONSULTING GROUP INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAXIM DESIGN BUILD LLCGeneral Contractor1203/21/2026
ABSOLUTE COMFORT SOLUTIONGeneral Contractor303/21/2026
MC SUPERSTRUCTURE INCGeneral Contractor204/09/2026
REDLINE ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808304/12/2024
HIRANI ENGINEERING & LAND679105/12/2023
NORFAST ENGINEERING PLLC6655105/12/2023
IP CONCRETE TESTING AND I6252108/11/2020
Building Lifecycle
All (55)Filed (10)Permit Issued (7)Signed Off (4)Violation (11)Special Inspection (23)
06/26/2026
Filed — Alteration
M01419344-I1
06/24/2026
Special inspection requirement — Insulation placement and R values
JAMI STUTZ
06/24/2026
Special inspection requirement — Lighting in dwelling units
JAMI STUTZ
06/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMI STUTZ
06/24/2026
Special inspection requirement — Fenestration air leakage
JAMI STUTZ
06/19/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMI STUTZ
06/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
JAMI STUTZ
06/18/2026
Special inspection requirement — Final
JAMI STUTZ
04/14/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01311034-P1
11/18/2025
Permit issued — Sidewalk Shed
M01311034-I1-SH
11/18/2025
Permit issued — Sidewalk Shed
M01311034-I1-SF
10/31/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01311034-I1
05/10/2024
Signed off — Alteration
INSTALL SPLIT HEAT PUMP AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00858629-I1
04/12/2024
Filed — Alteration
INSTALL SPLIT HEAT PUMP AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00858629-P2
04/12/2024
Special inspection requirement — Mechanical Systems
Joseph Bazini
04/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
04/12/2024
Special inspection requirement — Final
Joseph Bazini
04/01/2024
Filed — Alteration
INSTALL SPLIT HEAT PUMP AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00858629-P1
04/01/2024
Special inspection requirement — Mechanical Systems
Joseph Bazini
04/01/2024
Special inspection requirement — Final
Joseph Bazini
04/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/21/2023
Permit issued — Mechanical Systems
M00858629-I1-MS
08/25/2023
Signed off — Alteration
Rebuilding portions of the brick masonry party wall parapets, installing new waterproofing and flashing, and re-caulking skyward- facing joints at parapet coping.
M00868748-I1
08/04/2023
Filed — Alteration
INSTALL SPLIT HEAT PUMP AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00858629-I1
07/08/2023
Signed off — Alteration
Installation of construction fence on sidewalk at front of building in connection with repairs to ground floor storefront.
M00410489-I1
06/13/2023
Permit issued — General Construction
M00868748-I1-GC
05/12/2023
Filed — Alteration
Rebuilding portions of the brick masonry party wall parapets, installing new waterproofing and flashing, and re-caulking skyward- facing joints at parapet coping.
M00868748-I1
05/11/2023
Special inspection requirement — Tenant Protection Plan Compliance
Adam Szenk
05/10/2023
Special inspection requirement — Masonry
Michelle Noris
05/10/2023
Special inspection requirement — Final
Michelle Noris
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/09/2021
Permit issued — Construction Fence
M00410489-I1-FN
06/04/2021
Filed — Alteration
Replace sidewalk and steel curb , relocate bluestone paver, extend existing tree pit, and waterproof at building wall.
M00510784-I1
04/26/2021
Special inspection requirement — Final
Michelle Noris
10/23/2020
Permit issued — Construction Fence
M00410489-I1-FN
10/20/2020
Filed — Alteration
Installation of construction fence on sidewalk at front of building in connection with repairs to ground floor storefront.
M00410489-I1
09/25/2020
Signed off — Alteration
INSTALL SPLIT SYSTEM HEAT PUMP
M00362037-I1
08/20/2020
Permit issued — Mechanical Systems
M00362037-I1-MS
08/11/2020
Filed — Alteration
INSTALL SPLIT SYSTEM HEAT PUMP
M00362037-I1
06/24/2020
Special inspection requirement — HVAC insulation and sealing
ISSA KHORASANCHI
06/24/2020
Special inspection requirement — HVAC and service water heating equipment
ISSA KHORASANCHI
06/24/2020
Special inspection requirement — Maintenance information
ISSA KHORASANCHI
06/24/2020
Special inspection requirement — HVAC and service water heating system controls
ISSA KHORASANCHI
06/24/2020
Special inspection requirement — Final
ISSA KHORASANCHI
06/24/2020
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
01/17/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/03/2015
Violation issued (ECB, closed)
Construction
12/03/2015
Violation issued (ECB, closed)
Construction
12/03/2015
Violation issued (ECB, closed)
Construction
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/10/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/19/1993
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC11/18/2025
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC11/18/2025
DOB NOWMechanical SystemsSigned-offMAXIM DESIGN BUILD LLC11/21/2023
DOB NOWGeneral ConstructionSigned-offMAXIM DESIGN BUILD LLC06/13/2023
DOB NOWConstruction FenceSigned-offMAXIM DESIGN BUILD LLC06/09/2021
DOB NOWConstruction FenceSigned-offMAXIM DESIGN BUILD LLC10/23/2020
DOB NOWMechanical SystemsSigned-offABSOLUTE COMFORT SOLUTION08/20/2020
BISPLISSUEDDOVAL PLBG & HTG CORP07/18/2025
BISPLISSUEDDOVAL PLBG & HTG CORP07/18/2025
BIS—ISSUEDMAXIM DESIGN BUILD LLC06/13/2023
BIS—ISSUEDMAXIM DESIGN BUILD LLC11/30/2022
BISOTISSUEDMAXIM DESIGN BUILD LLC08/27/2020
BISOTISSUEDTED CONTRACTING CORP05/14/2019
BISOTISSUEDTRIDENT RESTORATION INC04/18/2019
BISOTISSUEDTRIDENT RESTORATION INC10/31/2018
BISPLISSUEDDPH PLUMBING & HTG CORP07/02/2018
BISPLISSUEDDPH PLUMBING & HTG CORP06/12/2018
BISPLISSUEDTW PLUMBING & HEATING INC06/12/2018
BISOTISSUEDP VERARDI CONSTRUCTION CO05/15/2018
BISPLISSUEDDPH PLUMBING & HTG CORP05/11/2018
BISOTISSUEDP VERARDI CONSTRUCTION CO02/02/2018
BISOTISSUEDP VERARDI CONSTRUCTION CO12/22/2017
BISMHISSUEDP VERARDI CONSTRUCTION CO08/08/2017
BISOTISSUEDP VERARDI CONSTRUCTION CO05/24/2017
BISOTISSUEDP VERARDI CONSTRUCTION CO05/16/2017
BISEQISSUEDP VERARDI CONSTRUCTION CO05/16/2017
BISEQISSUEDSPRING SCAFFOLDING LLC12/08/2016
BISMHISSUEDP VERARDI CONSTRUCTION CO11/01/2016
BISEQISSUEDSPRING SCAFFOLDING LLC10/19/2016
BISPLISSUEDTW PLUMBING & HEATING INC10/11/2016
BISOTISSUEDROOTED CONSTRUCTION CORP05/16/2016
BISMHISSUEDP VERARDI CONSTRUCTION CO01/20/2016
BISEQISSUEDSPRING SCAFFOLDING LLC12/10/2015
BISEQISSUEDSPRING SCAFFOLDING LLC10/30/2015
BISPLISSUEDTW PLUMBING & HEATING INC09/30/2015
BISOTISSUEDP VERARDI CONSTRUCTION CO08/20/2015
BISMHISSUEDF.SGROI CONSTRUCTION CO05/09/2012
BISOTISSUEDF.SGROI CONSTRUCTION CO05/09/2012
BISPLISSUEDADRIATIC PLBG & HTG CORP09/22/2011
BISOTISSUEDF.SGROI CONSTRUCTION CO05/20/2011
+ 9 more permits on file
4 projects · most recent 11/19/2025
General Wiring
FiledStatusContractorScope
11/19/2025Permit IssuedSOLAS ELECTRICAL CORP—
04/17/2025CompleteREDLINE ELECTRIC INCGeneral Wiring
09/04/2020CompleteKINGS ELECTRIC CO., INC.General Wiring
04/09/2020Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
1 project · most recent 06/04/2021
Concrete
FiledStatusContractorScope
06/04/2021——Concrete
1 project · most recent 04/14/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/14/2026Permit IssuedMC SUPERSTRUCTURE INCScaffold, Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
06/24/2026Insulation placement and R valuesJAMI STUTZenergy_progress
06/24/2026Lighting in dwelling unitsJAMI STUTZenergy_progress
06/24/2026Fenestration and door U-factor and product ratingsJAMI STUTZenergy_progress
06/24/2026Fenestration air leakageJAMI STUTZenergy_progress
06/19/2026Energy Code Compliance InspectionsJAMI STUTZprogress
06/19/2026Fire-Resistance Rated ConstructionJAMI STUTZprogress
06/18/2026FinalJAMI STUTZprogress
04/12/2024Mechanical SystemsJoseph Bazinispecial
04/12/2024Tenant Protection Plan Compliance—special
04/12/2024FinalJoseph Baziniprogress
04/01/2024Mechanical SystemsJoseph Bazinispecial
04/01/2024FinalJoseph Baziniprogress
04/01/2024Tenant Protection Plan Compliance—special
05/11/2023Tenant Protection Plan ComplianceAdam Szenkspecial
05/10/2023MasonryMichelle Norisspecial
05/10/2023FinalMichelle Norisprogress
04/26/2021FinalMichelle Norisprogress
06/24/2020HVAC insulation and sealing ISSA KHORASANCHIenergy_progress
06/24/2020HVAC and service water heating equipment ISSA KHORASANCHIenergy_progress
06/24/2020Maintenance informationISSA KHORASANCHIenergy_progress
06/24/2020HVAC and service water heating system controls ISSA KHORASANCHIenergy_progress
06/24/2020FinalISSA KHORASANCHIprogress
06/24/2020Mechanical SystemsINDARDEO PARBHUNATHspecial
▾Documents — 372 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
09/03/2026M00510784-I1Request digital key ↗
08/31/2026M00868748-I1Request digital key ↗
08/27/2026M00858629-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00362037-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00410489-I1Request digital key ↗
▸Applications & Permits76
▸BISPLAN / WORK APPROVAL APPLICATION35
10/17/2025101573469Open ↗
08/28/2025101573469Open ↗
07/03/2025110047823Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION33
07/21/2025110047823Open ↗
07/21/2025101573469Open ↗
11/30/2022101573469Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWLPC Approval/Permit7
09/04/2026M00362037-I1Open ↗
08/16/2026M01419344-I1Open ↗
08/13/2026M00858629-P2Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/18/2024101573469Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026M01419344-I1Open ↗
▸Seals & Professional Certifications78
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
02/21/2020122657311Open ↗
02/21/2020122657311Open ↗
02/21/2020122657311Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026M00510784-I1Open ↗
08/28/2026M00858629-P2Open ↗
08/28/2026M00362037-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/04/2026M00362037-I1Open ↗
08/27/2026M00858629-P2Open ↗
08/27/2026M00858629-P1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
08/02/2018140772830Open ↗
04/28/2017140624803Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026M00858629-P2Open ↗
08/28/2026M00362037-I1Open ↗
08/27/2026M00858629-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/02/2018140772830Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/02/2018140772830Open ↗
Showing 1 of 3 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
07/06/2018104514928Open ↗
11/28/2017104514928Open ↗
Showing 2 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING3
08/28/2025101573469Open ↗
12/11/2024101573469Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026M01419344-I1Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes5
09/21/2017123335444Open ↗
08/02/2018140772830Open ↗
Showing 2 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00410489-I1Open ↗
▸Environmental & Asbestos15
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
08/02/2018140772830Open ↗
09/21/2017123335444Open ↗
04/28/2017140624803Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/04/2026M00362037-I1Open ↗
08/27/2026M00858629-P2Open ↗
08/27/2026M00858629-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/16/2026M01419344-I1Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/11/2021140772830Open ↗
08/02/2018140772830Open ↗
04/28/2017140624803Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
08/02/2018140772830Open ↗
04/28/2017140624803Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/03/2024140624803Open ↗
01/11/2021140772830Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/07/2019140209263Open ↗
Showing 1 of 2 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/03/2024140624803Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/07/2019140209263Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/03/2024140624803Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/03/2024140624803Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/28/2025140624803Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
09/21/2017123335444Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/03/2024140624803Open ↗
▸BISFENESTRATION AREAS1
12/03/2024140624803Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/11/2021140772830Open ↗
08/02/2018140772830Open ↗
04/28/2017140624803Open ↗
Showing 3 of 4 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
09/09/2019122564402Open ↗
06/07/2019140209263Open ↗
▸Approvals, Objections & Sign-offs57
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
06/02/2025140624803Open ↗
01/12/2021140772830Open ↗
02/21/2020122657311Open ↗
Showing 3 of 15 on file for this type
▸BISLANDMARKS APPROVAL15
02/21/2020122657311Open ↗
02/13/2020122657311Open ↗
02/10/2020122657311Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
11/30/2022101573469Open ↗
08/26/2020140624803Open ↗
02/13/2020122657311Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER8
07/21/2025110047823Open ↗
07/21/2025101573469Open ↗
08/28/2020140624803Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
01/21/2025101573469Open ↗
12/10/2024101573469Open ↗
07/05/2024101573469Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS SIGNOFF2
05/28/2025140624803Open ↗
11/29/2024110047823Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
05/28/2025140624803Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT19
02/21/2020122657311Open ↗
02/13/2020122657311Open ↗
02/10/2020122657311Open ↗
Showing 3 of 19 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
11/20/2024110047823Open ↗
11/20/2024140624803Open ↗
01/11/2021140772830Open ↗
▸Filing & Intake Forms45
▸BISBOROUGH INTAKE FORM25
11/30/2022101573469Open ↗
11/29/2022101573469Open ↗
11/16/2022101573469Open ↗
Showing 3 of 25 on file for this type
▸BISADDITIONAL INFORMATION11
01/30/2025101573469Open ↗
01/28/2025101573469Open ↗
10/10/2024101573469Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET6
09/21/2017123335444Open ↗
Showing 1 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/02/2018140772830Open ↗
Showing 1 of 3 on file for this type
▸Other Documents21
▸DOB NOWLoft Board Certificate9
09/04/2026M00362037-I1Open ↗
08/17/2026M01311034-P1Open ↗
08/13/2026M00858629-I1Open ↗
Showing 3 of 9 on file for this type
▸BISLOFT BOARD CERTIFICATE7
08/02/2018140772830Open ↗
04/28/2017140624803Open ↗
Showing 2 of 7 on file for this type
▸BIS* FIRE STOPS 27-3451
09/25/2024101573469Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
09/25/2024101573469Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlot Diagram1
08/16/2026M01419344-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026M01419344-I1Open ↗