← Back
Two family converted from one family
21 CAMPUS PLACE
BROOKLYN · BIN 3092287
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R5Zoning
1,548 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 1,500 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SU ARCHITECT, P.C.207/08/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW YORK STANDARD MECH CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SU ARCHITECT PC6857207/08/2021
Building Lifecycle
All (13)Filed (2)Permit Issued (2)Signed Off (1)Violation (1)Inspection (4)Special Inspection (3)
10/12/2021
Signed off — Alteration
TO PROPOSE 3-PC BATHROOM AT CELLAR AND 1ST FLOOR, TO PROPOSED NEW KITCHEN AND REPLACE 3-PC BATHROOM AT 2ND FLOOR AS PER PLAN FILED HEREWITH. IN CONJUNCTION WITH A1 JOB# 322067151TO OBTAIN A NEW C.O, NO CHANGE OF USE, AND EGRESS.
B00336000-I1
10/04/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/02/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/30/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/18/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/04/2021
Permit issued — Plumbing
B00336000-I1-PL
07/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIANG SU
07/12/2021
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
07/12/2021
Special inspection requirement — HVAC insulation and sealing
QIANG SU
07/08/2021
Filed — Alteration
TO PROPOSE 3-PC BATHROOM AT CELLAR AND 1ST FLOOR, TO PROPOSED NEW KITCHEN AND REPLACE 3-PC BATHROOM AT 2ND FLOOR AS PER PLAN FILED HEREWITH. IN CONJUNCTION WITH A1 JOB# 322067151TO OBTAIN A NEW C.O, NO CHANGE OF USE, AND EGRESS.
B00336000-P1
06/18/2021
Permit issued — Plumbing
B00336000-I1-PL
08/25/2020
Filed — Alteration
TO PROPOSE 3-PC BATHROOM AT CELLAR AND 1ST FLOOR, TO PROPOSED NEW KITCHEN AND REPLACE 3-PC BATHROOM AT 2ND FLOOR AS PER PLAN FILED HEREWITH. IN CONJUNCTION WITH A1 JOB# 322067151TO OBTAIN A NEW C.O, NO CHANGE OF USE, AND EGRESS.
B00336000-I1
06/30/1998
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNEW YORK STANDARD MECH CORP08/04/2021
DOB NOWPlumbingSigned-offNEW YORK STANDARD MECH CORP06/18/2021
1 project · most recent 04/20/2021
General Wiring
FiledStatusContractorScope
04/20/2021CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/04/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/02/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/18/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/12/2021Fire-Resistant Penetrations and JointsQIANG SUspecial
07/12/2021Energy Code Compliance InspectionsQIANG SUprogress
07/12/2021HVAC insulation and sealing QIANG SUenergy_progress
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00336000-I1Request digital key ↗
08/15/2026B00336000-P1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION7
08/24/2020322067151Open ↗
08/20/2020322067151Open ↗
08/18/2020322067151Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/15/2021322067151Open ↗
▸BISWORK PERMIT APPLICATION1
05/20/2021322067151Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
04/28/2022322067151Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/16/2021322067151Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00336000-I1Open ↗
08/13/2026B00336000-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B00336000-I1Open ↗
08/25/2026B00336000-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/06/2020322067151Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B00336000-I1Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
06/29/2022322067151Open ↗
06/22/2020322067151Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026B00336000-P1Open ↗
08/13/2026B00336000-I1Open ↗
▸BISSTREET TREE SIGNOFF1
06/28/2022322067151Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
07/08/2020322067151Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00336000-I1Open ↗
08/13/2026B00336000-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/26/2020322067151Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/14/2021322067151Open ↗
08/10/2020322067151Open ↗
▸BISINTERIOR LIGHTING POWER1
03/01/2022322067151Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/01/2022322067151Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/22/2022322067151Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/06/2020322067151Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/10/2020322067151Open ↗
06/22/2020322067151Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/01/2022322067151Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/01/2022322067151Open ↗
▸BISMECHANICAL SYSTEMS1
03/01/2022322067151Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE4
08/24/2020322067151Open ↗
08/20/2020322067151Open ↗
08/18/2020322067151Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/08/2020322067151Open ↗
06/26/2020322067151Open ↗
▸BISCERTIFICATE OF OCCUPANCY1
11/16/2021322067151Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
03/06/2020322067151Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/14/2022322067151Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
06/26/2020322067151Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/06/2020322067151Open ↗
▸Other Documents2
▸BISSHUTOFF DAMPERS1
03/01/2022322067151Open ↗
▸BISPLOT DIAGRAM1
03/06/2020322067151Open ↗