ECB09/04/1998FAILURE TO PROVIDE APPROVED PLANS AT PREMISES AT TIME OF INSPECTION. REMEDY: PROVIDE APPROVED PLANS.Nothing owed — awaiting certificate of correction
ECB09/04/199827-147 PLUMBING WORK WITHOUT A PERMIT NOTED: PLUMBING WAS TAKEN OUT ON ALL FLOORS OF SAID PREMISES, GAS PIPES WERE REMOVED, HOT AND COLD SUPPLYLINESAND WASTE LINES. A SEARCH OF DEPT RECORDS SHOWS NO PLUMBING PENothing owed — awaiting certificate of correction
ECB09/04/199827-1021 FENCE DOGS NOT CONFERN TO CODE UPON INSPECTION THERE WAS NO 8 FEET HIGH SOLID FENCE ALONG PREMISES OF ADJACENT PROPERTY NO. 33 COLERIDGE STREETAND CONSTRUCTION ONTO SIDWALK PROGRESS WITH OUT SWINGINGNothing owed — awaiting certificate of correction
ECB09/04/199827-1009 FAILURE TO PROVIDE CONTRACTORS SIGN. NOTED CONTRACTOR SIGN NOT AS PER REQUIRED BY DEPT OF BUILDING. REMEDY: PROVIDE CONTRACTORS SIGNAS PER REQUIRED BY DEPARTMENT.Nothing owed — awaiting certificate of correction
ECB09/04/199827-147 WORK WITHOUT PERMIT AT TIME OF INSPECTION A PARTIAL CONSTRUCTION FENCE WAS ERECTED AT ABOVE PERMISES WITHOUT OBTAINING PERMIT. DEPT RECORD SHOW NO PERMIT WAS ISSUED FOR SAID WORK. OBTAIN PERMIT FOR SAIDNothing owed — awaiting certificate of correction