Multi-story retail building (2+)
21 DEY STREET
MANHATTAN · BIN 1001070
💬 Discuss this project
1935Year Built
3Stories
K2Building Class
C5-5Zoning
49,109 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: BLUE MILLENNIUM REALTY · 12,358 sf lot · 3.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Roof73p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 14 docs
Floor 341p · 1 filing · 9 docs
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 571p · 4 filings · 20 docs
Floor 473p · 4 filings · 20 docs
Floor 379p · 9 filings · 20 docs
Floor 281p · 8 filings · 20 docs
Floor 180p · 12 filings · 20 docs
Cellar88p · 13 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ASG EQUITIES4607/08/2026
PLATINUM SERVICES NY503/22/2026
BLUE MILLENNIUM REALTY203/22/2026
CENTURY 21 DEPT STORE203/22/2026
CENTURY 21 INC EZRA203/22/2026
CENTURY 213103/22/2026
MJM CONTRACTING ASSOCIATES103/22/2026
CEPRINE CONSTRUCTION303/21/2026
ADVANCED SCAFFOLD SERVICES203/21/2026
CENTURY 21 DEPARTMENT STORES1403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEVIN ENGINEERING PLLC105/28/2025
SRA ARCHITECTURE + ENGINEERING, PC1412/17/2024
CAMERON ENGINEERING809/10/2024
ASHRAF CORP110/03/2023
GILSANZ MURRAY STEFICEK LLP405/24/2023
T. LAPORTA ARCHITECT301/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGE E BERGER ASS1003/21/2026
DVA Advisors2003/21/2026
LEVIN ENGINEERING PLLC203/21/2026
WILLIAM VITACCO ASSOCIATES403/21/2026
GREEN STUDIO203/21/2026
MBE CODE & ZONING LLC203/21/2026
CES & COMPANY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJM ASSOCIATES CONSTR LLCGeneral Contractor1307/08/2026
M&D FIRE SPRINKLER INCFire Protection307/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor303/21/2026
MMI PLUMBING & HEATING INC.Plumbing207/08/2026
CESAR QUERYElectrical103/21/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
ISTRA ELEC'L CONTR'S CORPElectrical103/22/2026
KIRK, DANIELElectrical103/21/2026
MILLAR ELEVATOR IND., INCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEEL CORE ENGINEERING PL1098105/28/2025
AK ENGINEERING PC678712/17/2024
AA BUILDING & INSPECTION1519409/10/2024
GILSANZ MURRAY STEFICEK240704/19/2024
LEO Y LEE ASSOCIATES2481407/13/2023
Building Lifecycle
All (186)Filed (31)Permit Issued (17)Signed Off (9)Violation (60)Inspection (15)Objection (24)Special Inspection (30)
07/23/2025
Permit issued — Sprinklers
M01227126-I1-EW-SP
07/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/03/2025
Signed off — Alteration
M00954127-I1
05/28/2025
Filed — Alteration
Filing to add sprinkler booster pump to schedule B. Pump was filed and approved under application #M00783193. No change in use, egress or occupancy.
M01227126-I1
05/16/2025
Special inspection requirement — Sprinkler Systems
Alexander Sheyman
04/28/2025
Signed off — Alteration
Interior general construction work to commercial spaces at cellar, 1st, 2nd, and 3rd floors
M00782496-I1
03/17/2025
Objection resolved — Addressed
03/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
03/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
Ari Kamo
03/17/2025
Special inspection requirement — Sprayed fire-resistant materials
Ari Kamo
03/17/2025
Special inspection requirement — Interior lighting power
Ari Kamo
03/17/2025
Special inspection requirement — Final
Ari Kamo
03/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
03/17/2025
Special inspection requirement — Vestibules
Ari Kamo
12/26/2024
Objection raised — Accessibility
12/17/2024
Filed — Alteration
Interior general construction work to commercial spaces at cellar, 1st, 2nd, and 3rd floors
M00782496-P1
10/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/15/2024
Permit issued — Mechanical Systems
M00954127-I1-MS
09/10/2024
Filed — Alteration
M00954127-I1
07/18/2024
Signed off — Alteration
Installation of plumbing fixtures and piping at cellar and 1st floor as shown on plans
M00784004-I1
07/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/31/2024
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00939459-I1
05/23/2024
Signed off — Alteration
Alteration of existing sprinkler system as shown on plans
M00783193-I1
05/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/26/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2024
Signed off — Alteration
Installation of mechanical equipment and ductwork as shown on plans
M00783180-I1
04/19/2024
Filed — Alteration CO
Convert cellar, 1st, and 2nd floors to UG 10 studio with accessory office and storage spaces on 3rd floor. Construct new egress stair at cellar, 1st, 2nd, 3rd, and 4th floors.
M00622953-P5
04/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Karl Rubenacker
04/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ari Kamo
04/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
04/19/2024
Special inspection requirement — Fenestration air leakage
Ari Kamo
04/19/2024
Special inspection requirement — Fenestration areas
Ari Kamo
04/19/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Ari Kamo
04/19/2024
Special inspection requirement — Air barrier - visual inspection
Ari Kamo
04/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
04/17/2024
Violation issued (FDNY_NOV, closed)
04/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
04/15/2024
Special inspection requirement — Mechanical Systems
Younes Abouyaala
04/15/2024
Special inspection requirement — Final
NAVEEN KUMAR
04/15/2024
Special inspection requirement — Maintenance information
Ari Kamo
04/15/2024
Special inspection requirement — Shutoff dampers
Ari Kamo
04/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
04/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
04/12/2024
Filed — Alteration
Installation of mechanical equipment and ductwork as shown on plans
M00783180-P1
04/12/2024
Filed — Alteration
Installation of plumbing fixtures and piping at cellar and 1st floor as shown on plans
M00784004-P3
04/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Ari Kamo
04/10/2024
Special inspection requirement — Air barrier - visual inspection
Ari Kamo
04/10/2024
Special inspection requirement — Fenestration areas
Ari Kamo
04/10/2024
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
04/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ari Kamo
04/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
04/10/2024
Special inspection requirement — Fenestration air leakage
Ari Kamo
04/08/2024
Permit issued — General Construction
M00622953-I1-GC
03/21/2024
Signed off — Alteration
Removal of sprinkler heads and installation of temporary core sprinkler protection
M00767134-I1
03/21/2024
Signed off — Alteration
Structural work as shown on plans
M00755781-I1
12/27/2023
Filed — Alteration CO
Convert cellar, 1st, and 2nd floors to UG 10 studio with accessory office and storage spaces on 3rd floor. Construct new egress stair at cellar, 1st, 2nd, 3rd, and 4th floors.
M00622953-P4
12/18/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/15/2023
Filed — No Work
M00885488-P1
Latest 60 of 186 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC07/23/2025
DOB NOWMechanical SystemsSigned-offMJM ASSOCIATES CONSTR LLC10/15/2024
DOB NOWGeneral ConstructionPermit IssuedMJM ASSOCIATES CONSTR LLC04/08/2024
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC11/14/2023
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH11/03/2023
DOB NOWGeneral ConstructionSigned-offMJM ASSOCIATES CONSTR LLC10/30/2023
DOB NOWMechanical SystemsSigned-offMJM ASSOCIATES CONSTR LLC10/30/2023
DOB NOWConstruction FenceSigned-offPLATINUM SERVICES NY LLC10/05/2023
DOB NOWStructuralSigned-offMJM ASSOCIATES CONSTR LLC09/19/2023
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC07/31/2023
DOB NOWGeneral ConstructionPermit IssuedMJM ASSOCIATES CONSTR LLC04/27/2023
DOB NOWGeneral ConstructionSigned-offMJM ASSOCIATES CONSTR LLC12/16/2022
DOB NOWMechanical SystemsSigned-offMJM ASSOCIATES CONSTR LLC11/14/2022
DOB NOWGeneral ConstructionSigned-offMJM ASSOCIATES CONSTR LLC11/14/2022
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH10/27/2022
DOB NOWStructuralSigned-offMJM ASSOCIATES CONSTR LLC07/19/2022
DOB NOWGeneral ConstructionSigned-offMJM ASSOCIATES CONSTR LLC12/29/2021
BISEQISSUEDCEPRINE CONSTRUCTION INC02/11/2020
BISOTISSUEDNATIONAL MAINTENANCE INC10/23/2017
BISOTISSUEDSQUAN CONSTRUCTION SERVIC09/30/2015
BISSPISSUEDWELKIN FIRE PROTECTION LL05/14/2015
BISOTISSUEDDGC CAPITAL CONTRACTING CORP02/26/2015
BISOTISSUEDDGC CAPITAL CONTRACTING CORP02/17/2015
BISMHISSUEDDGC CAPITAL CONTRACTING CORP02/11/2015
BISOTISSUEDDGC CAPITAL CONTRACTING CORP02/11/2015
BISSPISSUEDSTEVE BELSITO SONS INC12/30/2014
BISEQISSUEDADVANCED SCAFFOLD SER.LLC08/16/2014
BISEQISSUEDADVANCED SCAFFOLD SER.LLC08/15/2014
BISEQISSUEDDGC CAPITAL CONTRACTING CORP04/28/2014
BISMHISSUEDDGC CAPITAL CONTRACTING CORP04/28/2014
BISOTISSUEDDGC CAPITAL CONTRACTING CORP04/28/2014
BISOTISSUEDDGC CAPITAL CONTRACTING CORP04/28/2014
BISMHISSUEDDGC CAPITAL CONTRACTING CORP04/02/2014
BISOTISSUEDDGC CAPITAL CONTRACTING CORP04/01/2014
BISOTISSUEDDGC CAPITAL CONTRACTING CORP04/01/2014
BISMHISSUEDB.R. FRIES & ASSOCIATES LLC08/28/2013
BISOTISSUEDB.R. FRIES & ASSOCIATES LLC08/19/2013
BISOTRE-ISSUEDDGC CAPITAL CONTRACTING CORP08/14/2013
BISMHISSUEDDGC CAPITAL CONTRACTING CORP08/14/2013
BISOTISSUEDDGC CAPITAL CONTRACTING CORP08/14/2013
+ 27 more permits on file
1 project · most recent 05/28/2025
FiledStatusContractorScope
05/28/2025Signed-offM&D FIRE SPRINKLER INC1 heads
9 projects · most recent 07/16/2025
General Wiring
FiledStatusContractorScope
07/16/2025Permit IssuedSIDNEY ELEC'L CONT'G INC.General Wiring
05/13/2025Permit IssuedSIDNEY ELEC'L CONT'G INC.General Wiring
03/31/2025CompleteSIDNEY ELEC'L CONT'G INC.General Wiring
03/04/2024CompleteSTAR ELEC'L CONTRACTORS C—
12/19/2022Permit IssuedV-MAR ELECTRIC LTD.General Wiring
12/07/2022CompleteSTAR ELEC'L CONTRACTORS C—
06/06/2022CompleteOM ELECTRIC, INC—
12/22/2021Permit IssuedISTRA ELEC'L CONTRS CORPGeneral Wiring
04/19/2019Permit IssuedR.C.M. ELECTRIC CORP.General Wiring
1 project · most recent 04/19/2024
Steel Concrete
FiledStatusContractorScope
04/19/2024Permit IssuedMJM ASSOCIATES CONSTR LLCSteel, Concrete
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
07/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/26/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/18/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/11/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/20/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/15/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 129
DateRequirementInspectorRole
05/16/2025Sprinkler SystemsAlexander Sheymanspecial
03/17/2025Interior lighting powerAri Kamoenergy_progress
03/17/2025Fire-Resistant Penetrations and JointsAri Kamospecial
03/17/2025Sprayed fire-resistant materialsAri Kamospecial
03/17/2025Fire-Resistance Rated ConstructionAri Kamoprogress
03/17/2025FinalAri Kamoprogress
03/17/2025VestibulesAri Kamoenergy_progress
03/17/2025Energy Code Compliance InspectionsAri Kamoprogress
04/19/2024Air barrier - visual inspectionAri Kamoenergy_progress
04/19/2024Structural Stability – Alterations of existing buildingsKarl Rubenackerspecial
04/19/2024Fire-Resistant Penetrations and JointsAri Kamospecial
04/19/2024Fire-Resistance Rated ConstructionAri Kamoprogress
04/19/2024Energy Code Compliance InspectionsAri Kamoprogress
04/19/2024Fenestration and door U-factor and product ratingsAri Kamoenergy_progress
04/19/2024Fenestration areasAri Kamoenergy_progress
04/19/2024Fenestration air leakageAri Kamoenergy_progress
04/15/2024HVAC-R and service water heating equipmentAri Kamoenergy_progress
04/15/2024HVAC-R and service water piping design and insulationAri Kamoenergy_progress
04/15/2024Maintenance informationAri Kamoenergy_progress
04/15/2024Shutoff dampersAri Kamoenergy_progress
04/15/2024HVAC-R and service water heating system controlsAri Kamoenergy_progress
04/15/2024FinalNAVEEN KUMARprogress
04/15/2024Mechanical SystemsYounes Abouyaalaspecial
04/10/2024Fire-Resistant Penetrations and JointsAri Kamospecial
04/10/2024Fenestration areasAri Kamoenergy_progress
Latest 25 of 129.
▾Documents — 446 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch26
09/03/2026M00629786-I1Request digital key ↗
09/03/2026M00650631-P1Request digital key ↗
09/02/2026M00755781-P3Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/29/2026M00885484-I1Request digital key ↗
08/29/2026M00885488-I1Request digital key ↗
08/29/2026M00885488-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
08/28/2026M00939200-I1Request digital key ↗
08/14/2026M00938389-I1Request digital key ↗
▸Applications & Permits70
▸BISPLAN / WORK APPROVAL APPLICATION35
08/15/2024140886744Open ↗
08/15/2024123293499Open ↗
08/15/2024140238687Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION34
02/11/2020140886744Open ↗
02/10/2020140886744Open ↗
10/24/2017123293499Open ↗
Showing 3 of 34 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/17/2014121945912Open ↗
▸Seals & Professional Certifications159
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION48
10/24/2017123293499Open ↗
06/09/2016122502489Open ↗
01/09/2016121004199Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/03/2026M00650631-I1Open ↗
09/02/2026M00755781-P3Open ↗
09/02/2026M00755781-P1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
09/28/2026M00622953-P5Open ↗
09/28/2026M00622953-P5Open ↗
09/01/2026M00622953-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/28/2026M00622953-P5Open ↗
09/28/2026M00622953-P5Open ↗
09/01/2026M00622953-P1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
02/10/2020140886744Open ↗
10/23/2017123293499Open ↗
08/14/2014140238687Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
10/23/2017123293499Open ↗
05/01/2014121945912Open ↗
Showing 2 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
02/10/2020140886744Open ↗
08/14/2014140238687Open ↗
08/12/2014140238669Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
02/10/2020140886744Open ↗
08/14/2014140238687Open ↗
08/12/2014140238669Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment21
▸BISSELF-CERT PLUMBING NOTICE7
12/28/2015121004199Open ↗
10/30/2015121004199Open ↗
09/01/2015122180745Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING4
11/14/2014122180745Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
09/08/2015122403032Open ↗
12/15/2014122180745Open ↗
11/03/2014122180745Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
10/30/2015121004199Open ↗
09/01/2015122180745Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
11/03/2017121945930Open ↗
10/11/2017121945930Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
12/17/2014121945912Open ↗
12/05/2014121945912Open ↗
▸BISEQUIPMENT USE PERMITS1
12/05/2014121945912Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist5
08/13/2026M00622953-P3Open ↗
08/13/2026M00622953-P5Open ↗
08/13/2026M00622953-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00622953-I1Open ↗
▸Environmental & Asbestos36
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/03/2026M00650631-I1Open ↗
09/02/2026M00755781-P2Open ↗
09/02/2026M00755781-P3Open ↗
Showing 3 of 24 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
09/08/2015122403032Open ↗
11/03/2014122180745Open ↗
05/01/2014121945912Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/02/2026M00767134-I1Open ↗
▸Energy Compliance33
▸BISAS-BUILT ENERGY ANALYSIS11
11/03/2017121945930Open ↗
10/23/2017123293499Open ↗
10/11/2017121945930Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
10/23/2017123293499Open ↗
06/09/2016122502489Open ↗
09/08/2015122403032Open ↗
Showing 3 of 11 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026M00782496-I1Open ↗
08/13/2026M00783180-I1Open ↗
08/13/2026M00622953-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00783180-I1Open ↗
08/13/2026M00954127-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/10/2020140886744Open ↗
08/14/2014140238687Open ↗
08/12/2014140238669Open ↗
Showing 3 of 4 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
12/15/2014122180745Open ↗
11/03/2014122180745Open ↗
▸BISHYDRO FLOW TEST LETTER1
12/15/2014122180745Open ↗
▸Approvals, Objections & Sign-offs21
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
11/03/2017121945930Open ↗
10/11/2017121945930Open ↗
06/09/2016122502489Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/09/2016122502489Open ↗
01/08/2015122180745Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT21
11/03/2017121945930Open ↗
10/23/2017123293499Open ↗
10/11/2017121945930Open ↗
Showing 3 of 21 on file for this type
▸Filing & Intake Forms30
▸BISEFILING COVER SHEET18
10/23/2017123293499Open ↗
09/08/2015122403032Open ↗
09/08/2015122403032Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION5
05/25/2016122502489Open ↗
06/03/2015121685284Open ↗
05/05/2015121471282Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
02/10/2020140886744Open ↗
08/14/2014140238687Open ↗
08/12/2014140238669Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
11/03/2017121945930Open ↗
10/11/2017121945930Open ↗
08/29/2017122403032Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification6
09/01/2026M00622953-P4Open ↗
09/01/2026M00622953-P5Open ↗
09/01/2026M00622953-P3Open ↗
Showing 3 of 6 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
08/14/2014140238687Open ↗
08/14/2014140238669Open ↗
Showing 2 of 3 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type