Condo, commercial tower (mixed-use) [derived]
Baumann Brothers Furniture and Carpets Store
22 EAST 14 STREET · Greenwich Village · BIN 1009394
💬 Discuss this project
1881Year Built
5Stories
RCBuilding Class
C6-1Zoning
109,696 sfGross Floor Area
2Units
LL97 Covered3 Open Violations ▸
Condo, commercial tower (mixed-use) [derived] · Owner of record: NEW SCHOOL UNIVERSITY · 15,747 sf lot · 6.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Roof47p · 3 filings · 20 docs
Floor 528p · 2 filings · 20 docs
Floor 428p · 1 filing · 20 docs
Floor 37p · 1 filing · 3 docs
Floor 2
Floor 160p · 8 filings · 20 docs
Mezzanine44p · 2 filings · 20 docs
Cellar7p · 1 filing · 20 docs
Site & exterior1p · 2 filings · 8 docs
Filed — no permit issued8p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW SCHOOL7308/29/2026
SUTTON GARRETT REALTY4507/08/2026
SUTTON MANAGEMENT3003/21/2026
22 EAST 142203/21/2026
NEW SCHOOL UNIVERSITY1203/21/2026
22 E 14 LLC C O SUTTON-GARRET1203/21/2026
22 E 14 LLC C/O SUTTON-GARRET1003/21/2026
22 EAST 14TH403/21/2026
PFNY203/21/2026
HGL ART INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYCCODE2003/21/2026
SIMPLE ARCHITECTURE1603/21/2026
HWANGS BUILDING MANAGEMEN403/21/2026
JRK CREATIVE403/21/2026
GREEN LIGHT EXPEDITING LLC1003/21/2026
BUILDING BROTHERS403/21/2026
PEROTTO CONSULTING MANAGEMENT203/21/2026
LEWSAN CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CROSS MANAGEMENT CORPGeneral Contractor1007/08/2026
NEWPORT DESIGNS CORPGeneral Contractor603/21/2026
MAGNETIC BUILDERS GROUPGeneral Contractor407/08/2026
CONCEPT AIR CONDITIONINGGeneral Contractor203/21/2026
ROCCO PROGANO IIIElectrical203/21/2026
ACTIVE SIGNSScaffold207/08/2026
BROSNA CONSTRUCTION CORPOGeneral Contractor203/21/2026
TOM RECTENWALD CONSTRUCTIGeneral Contractor203/21/2026
MAGIC MECHANICAL INCPlumbing107/08/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
G.A.M.C.N.Y. LLCGeneral Contractor107/08/2026
JAVIER VALERA ACEROElectrical103/21/2026
JOSEPH BRAMANElectrical103/21/2026
PLUMBING NYC, INCFire Protection107/08/2026
RRP PLUMBING CORPFire Protection107/08/2026
GOODALL ELECTRIC CORPElectrical103/22/2026
R&S CONST. CONTRACT. INCGeneral Contractor107/08/2026
FRANKIE PLBG & HTG L.L.CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DELTA TESTING LABS6871004/08/2026
DARIUS TORABY ARCHITECTS,116110/16/2024
HRF SERVICES CORP5616607/09/2024
HSU & ASSOCIATES8025205/08/2024
SD TESTING & INSPECTION S7010203/25/2024
RHL ENGINEERING, LLC712110/11/2023
RICHMOND TESTING LAB263110/05/2023
GREGORY V. PEROTTO, P.E.947112/09/2020
Building Lifecycle
All (210)Filed (37)Permit Issued (27)Signed Off (20)Violation (60)Inspection (16)Objection (20)Special Inspection (30)
08/18/2026
Signed off — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-S2
05/14/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2026
Permit issued — General Construction
M01255400-S5-GC
04/10/2026
Permit issued — Structural
M01255400-S4-ST
04/09/2026
Special inspection requirement — Final
RICHARD GREENWALD
04/09/2026
Special inspection requirement — Structural Steel - Welding
RICHARD GREENWALD
04/09/2026
Special inspection requirement — Structural Steel - Details
RICHARD GREENWALD
04/09/2026
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD GREENWALD
04/09/2026
Special inspection requirement — Structural Wood Frame
RICHARD GREENWALD
04/09/2026
Special inspection requirement — Wood – Seismic Resistance
RICHARD GREENWALD
04/08/2026
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-P1
04/08/2026
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S5
04/08/2026
Permit issued — Mechanical Systems
M01255400-S3-MS
04/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/25/2026
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S3
03/11/2026
Permit issued — Plumbing
M01255400-S6-PL
03/02/2026
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S4
02/27/2026
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S6
02/26/2026
Signed off — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-S1
01/22/2026
Permit issued — General Construction
M01255400-S2-GC
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
01/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
RICHARD GREENWALD
01/20/2026
Special inspection requirement — Heating Systems
RICHARD GREENWALD
01/06/2026
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S2
12/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
RICHARD GREENWALD
12/19/2025
Special inspection requirement — Final
RICHARD GREENWALD
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
12/15/2025
Signed off — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-I1
12/12/2025
Signed off — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-S3
12/08/2025
Filed — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-P1
12/05/2025
Special inspection requirement — Wood – Seismic Resistance
11/17/2025
Special inspection requirement — Final
RICHARD GREENWALD
11/17/2025
Special inspection requirement — Final
JOEL NAPACH
11/17/2025
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/23/2025
Permit issued — Mechanical Systems
M01255400-S1-MS
10/17/2025
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S1
10/08/2025
Permit issued — General Construction
M01255400-I1-GC
10/08/2025
Special inspection requirement — Final
RICHARD GREENWALD
10/08/2025
Special inspection requirement — Structural Steel - Welding
RICHARD GREENWALD
10/08/2025
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD GREENWALD
10/08/2025
Special inspection requirement — Structural Steel - Details
RICHARD GREENWALD
10/08/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
10/06/2025
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-I1
08/05/2025
Permit issued — Mechanical Systems
M01212995-S1-MS
07/29/2025
Permit issued — Structural
M01212995-S2-ST
07/18/2025
Filed — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-S2
07/18/2025
Filed — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-S1
07/14/2025
Special inspection requirement — Final
JOEL NAPACH
07/02/2025
Signed off — Alteration
FILING FOR CONSTRUCTION FENCE ASSOCIATED WITH CREATION OF STOREFRONT ENTRANCE AS PER PLANS SUBMITTED HEREWITH.
M00916972-I1
06/13/2025
Permit issued — General Construction
M01212995-I1-GC
05/29/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
05/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
05/29/2025
Special inspection requirement — Heating Systems
RICHARD GREENWALD
05/16/2025
Permit issued — General Construction
M01212995-S3-GC
05/15/2025
Filed — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-I1
05/15/2025
Filed — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-S3
04/25/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
Latest 60 of 210 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCROSS MANAGEMENT CORP04/14/2026
DOB NOWStructuralSigned-offCROSS MANAGEMENT CORP04/10/2026
DOB NOWMechanical SystemsSigned-offCROSS MANAGEMENT CORP04/08/2026
DOB NOWPlumbingSigned-offMAGIC MECHANICAL INC03/11/2026
DOB NOWGeneral ConstructionSigned-offCROSS MANAGEMENT CORP01/22/2026
DOB NOWMechanical SystemsSigned-offCROSS MANAGEMENT CORP10/23/2025
DOB NOWGeneral ConstructionSigned-offCROSS MANAGEMENT CORP10/08/2025
DOB NOWMechanical SystemsSigned-offCROSS MANAGEMENT CORP08/05/2025
DOB NOWStructuralSigned-offCROSS MANAGEMENT CORP07/29/2025
DOB NOWGeneral ConstructionSigned-offCROSS MANAGEMENT CORP06/13/2025
DOB NOWGeneral ConstructionSigned-offCROSS MANAGEMENT CORP05/16/2025
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO10/28/2024
DOB NOWMechanical SystemsSigned-offMAGNETIC BUILDERS GROUP08/20/2024
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.04/19/2024
DOB NOWStructuralSigned-offMAGNETIC BUILDERS GROUP04/09/2024
DOB NOWSprinklersSigned-offPLUMBING NYC, INC03/29/2024
DOB NOWPlumbingSigned-offFRANKIE PLBG & HTG L.L.C03/18/2024
DOB NOWMechanical SystemsSigned-offGAMCNY03/13/2024
DOB NOWGeneral ConstructionSigned-offMAGNETIC BUILDERS GROUP03/11/2024
DOB NOWPlumbingSigned-offDW PLUMBING INC02/28/2024
DOB NOWStructuralSigned-offR&S CONST. CONTRACT. INC11/13/2023
DOB NOWGeneral ConstructionSigned-offNEWPORT DESIGNS CORP09/27/2023
DOB NOWConstruction FenceSigned-offNEWPORT DESIGNS CORP09/26/2023
DOB NOWSignSigned-offACTIVE SIGNS INC12/22/2022
DOB NOWSignSigned-offACTIVE SIGNS INC12/22/2022
DOB NOWGeneral ConstructionSigned-offARTUR HOME IMPROVEMENT09/01/2021
DOB NOWMechanical SystemsSigned-offCONCEPT AIR CONDITIONING12/22/2020
BIS—ISSUEDHAIAN HONEST RENOVATION08/27/2024
BIS—ISSUEDHAIAN HONEST RENOVATION03/11/2024
BISSPISSUEDMETRO FIRE PROTECTION INC07/18/2016
BISOTISSUEDA.D. WINSTON SERVICE INC07/08/2016
BISMHISSUEDA.D. WINSTON SERVICE INC07/08/2016
BIS—ISSUEDINTERBORO SIGN & ELECL MA06/30/2016
BISOTISSUEDNUCOR CONSTRUCTION CORP06/10/2016
BISMHISSUEDNUCOR CONSTRUCTION CORP06/10/2016
BISOTRE-ISSUEDNUCOR CONSTRUCTION CORP06/01/2016
BISMHISSUEDNUCOR CONSTRUCTION CORP06/01/2016
BIS—ISSUEDFRANK TORRONE & SONS INC04/12/2016
BIS—ISSUEDFRANK TORRONE & SONS INC04/12/2016
BIS—ISSUEDFRANK TORRONE & SONS INC04/12/2016
+ 37 more permits on file
2 projects · most recent 04/08/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/08/2026Signed-offCROSS MANAGEMENT CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FXFA48AAVJU 48,000 BTU · Vrf Indoor ×16
REYA168AATJA 168,000 BTU · Vrf Outdoor ×8
FXSA48AAVJU 48,000 BTU · Vrf Indoor ×2
REYA72AATJA 72,000 BTU · Vrf Outdoor ×2
DPSH12B 142,842 BTU · Rooftop Unit ×1
Rebel DPSH12B 142,842 BTU · Rooftop Unit ×2
Ventilation
Rebel DPSH12B 142,842 BTU · Heat Pump Outdoor ×2
Refrigeration
Daikin REYA168AATJA 168,000 BTU · Vrf Outdoor ×8
REYA72AATJA 72,000 BTU · Vrf Outdoor ×2
12/08/2025Signed-offCROSS MANAGEMENT CORPHeating and Air Conditioning Systems
Heat / Cool
Aaon RNA-030-C-A-B 325,800 BTU · Doas ×1
2 projects · most recent 04/08/2026
Water/Sanitary
FiledStatusContractorScope
04/08/2026Signed-offMAGIC MECHANICAL INCWater/Sanitary
10/30/2023——Water/Sanitary
9 projects · most recent 05/15/2026
General Wiring
FiledStatusContractorScope
05/15/2026Permit IssuedE.S.B. ELECTRIC CORP.General Wiring
02/13/2026Permit IssuedM.C. ELECTRICAL NY INCGeneral Wiring
07/22/2025CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
06/10/2025CompleteM.C. ELECTRICAL NY INCGeneral Wiring
05/12/2025CompleteGOODALL ELECTRIC CORPGeneral Wiring
08/27/2024CompleteAMERICAN POWER ELECT CONSGeneral Wiring
09/29/2023CompleteLAREDO ELECTRIC, INC.General Wiring
04/19/2022CompleteNEE ELECTRICAL, LLC—
01/10/2022CompleteJOHN MICHAEL ELEC'L CONTGGeneral Wiring
2 projects · most recent 04/08/2026
Steel Wood
FiledStatusContractorScope
04/08/2026Signed-offCROSS MANAGEMENT CORPSteel, Wood
12/08/2025Signed-offCROSS MANAGEMENT CORPSteel, Wood
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
05/14/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/29/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/08/2024Pass-Final PL - UndergroundPassView ↗
01/25/2024Pass-Final PL - UndergroundPassView ↗
01/17/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
04/09/2026Structural Wood FrameRICHARD GREENWALDprogress
04/09/2026FinalRICHARD GREENWALDprogress
04/09/2026Structural Steel - High Strength BoltingRICHARD GREENWALDspecial
04/09/2026Wood – Seismic ResistanceRICHARD GREENWALDspecial
04/09/2026Structural Steel - WeldingRICHARD GREENWALDspecial
04/09/2026Structural Steel - DetailsRICHARD GREENWALDspecial
01/22/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
01/22/2026Fire-Resistance Rated ConstructionRICHARD GREENWALDprogress
01/20/2026Heating SystemsRICHARD GREENWALDspecial
12/19/2025FinalRICHARD GREENWALDprogress
12/19/2025Fire-Resistance Rated ConstructionRICHARD GREENWALDprogress
12/19/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
12/05/2025Wood – Seismic Resistance—special
11/17/2025FinalRICHARD GREENWALDprogress
11/17/2025FinalJOEL NAPACHprogress
11/17/2025Mechanical SystemsRICHARD GREENWALDspecial
10/08/2025Post-installed AnchorsRICHARD GREENWALDspecial
10/08/2025Structural Steel - High Strength BoltingRICHARD GREENWALDspecial
10/08/2025Structural Steel - WeldingRICHARD GREENWALDspecial
10/08/2025FinalRICHARD GREENWALDprogress
10/08/2025Structural Steel - DetailsRICHARD GREENWALDspecial
07/14/2025FinalJOEL NAPACHprogress
05/29/2025Post-installed AnchorsRICHARD GREENWALDspecial
05/29/2025Heating SystemsRICHARD GREENWALDspecial
05/29/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
Latest 25 of 85.
▾Documents — 1,029 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch36
09/03/2026M00570999-I1Request digital key ↗
09/01/2026M00588821-I1Request digital key ↗
09/01/2026M00588806-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00333533-I1Request digital key ↗
▸Applications & Permits203
▸BISPLAN / WORK APPROVAL APPLICATION98
02/12/2025121978182Open ↗
11/04/2024121978182Open ↗
11/01/2024121978182Open ↗
Showing 3 of 98 on file for this type
▸BISWORK PERMIT APPLICATION72
03/11/2024121978182Open ↗
03/11/2024121978182Open ↗
07/20/2016122763312Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWLPC Approval/Permit27
08/27/2026M00975538-I1Open ↗
08/27/2026M00975538-S1Open ↗
08/20/2026M01212995-S2Open ↗
Showing 3 of 27 on file for this type
▸BISPLACE OF ASSEMBLY4
06/10/2016122243875Open ↗
06/10/2016122243875Open ↗
Showing 2 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING EXHIBIT I- CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
12/17/2025121978182Open ↗
▸Seals & Professional Certifications303
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION118
06/26/2017122550444Open ↗
12/15/2016122612850Open ↗
12/15/2016122673936Open ↗
Showing 3 of 118 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/01/2026M00588821-I1Open ↗
08/29/2026M00916972-I1Open ↗
08/28/2026M00949649-S1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
09/25/2026M00975538-P2Open ↗
09/25/2026M00975538-P2Open ↗
09/23/2026M01212995-S1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/25/2026M00975538-P2Open ↗
09/23/2026M01212995-S1Open ↗
09/23/2026M01212995-S1Open ↗
Showing 3 of 33 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT30
07/01/2016122809684Open ↗
07/01/2016122809684Open ↗
06/16/2016122750754Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST26
07/01/2016122809684Open ↗
06/16/2016122750754Open ↗
06/10/2016122612850Open ↗
Showing 3 of 26 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Trade Schedules & Equipment52
▸BISSELF-CERT PLUMBING NOTICE19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
11/17/2016122763312Open ↗
04/29/2016122714090Open ↗
Showing 2 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
03/22/2017110394136Open ↗
06/03/2016122645708Open ↗
Showing 2 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos81
▸BISASBESTOS: CERTIFICATION (DEP ACP5)33
07/01/2016122809684Open ↗
06/16/2016122750754Open ↗
06/10/2016122612850Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report26
09/01/2026M00588821-I1Open ↗
08/28/2026M00949649-S1Open ↗
08/27/2026M00916967-P1Open ↗
Showing 3 of 26 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/18/2026M01255400-S5Open ↗
08/18/2026M01255400-S2Open ↗
08/18/2026M01255400-S3Open ↗
Showing 3 of 7 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance50
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS28
06/26/2017122550444Open ↗
10/18/2016122714072Open ↗
10/18/2016122714072Open ↗
Showing 3 of 28 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
06/26/2017122550444Open ↗
10/18/2016122714072Open ↗
09/22/2016121032006Open ↗
Showing 3 of 9 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00570999-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00333533-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
09/28/2018121978182Open ↗
▸Approvals, Objections & Sign-offs122
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST47
10/04/2018121978182Open ↗
09/28/2018121978182Open ↗
06/08/2018121978182Open ↗
Showing 3 of 47 on file for this type
▸BISLANDMARKS APPROVAL38
06/26/2017122550444Open ↗
10/18/2016122714072Open ↗
08/10/2016122131040Open ↗
Showing 3 of 38 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
02/12/2025121978182Open ↗
11/04/2024121978182Open ↗
11/01/2024121978182Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
06/26/2017122550444Open ↗
10/25/2016122809684Open ↗
05/31/2016121978182Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLandmark Approval2
08/13/2026M01255400-S3Open ↗
08/13/2026M01255400-S5Open ↗
▸BISLANDMARKS SIGNOFF1
08/23/2024121978182Open ↗
▸Cost, Insurance & Ownership79
▸BISCOST AFFIDAVIT79
06/26/2017122550444Open ↗
05/09/2017110394136Open ↗
05/04/2017122763312Open ↗
Showing 3 of 79 on file for this type
▸Filing & Intake Forms83
▸BISEFILING COVER SHEET44
07/01/2016122809684Open ↗
07/01/2016122809684Open ↗
06/16/2016122750754Open ↗
Showing 3 of 44 on file for this type
▸BISADDITIONAL INFORMATION23
06/20/2024121978182Open ↗
11/25/2016122243875Open ↗
11/17/2016122763312Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISBOROUGH INTAKE FORM7
03/11/2024121978182Open ↗
10/04/2018121978182Open ↗
09/28/2018121978182Open ↗
Showing 3 of 7 on file for this type
▸Other Documents7
▸BISSupporting Document: Fee Deferment2
06/10/2016122243875Open ↗
06/10/2016122243875Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
08/30/2017121904859Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M01212995-I1Open ↗
08/13/2026M01255400-I1Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type