Condo, commercial tower (mixed-use) [derived]
21 EAST 13TH STREET
MANHATTAN · Greenwich Village · BIN 1009394
💬 Discuss this project
1881Year Built
5Stories
RCBuilding Class
C6-1Zoning
109,696 sfGross Floor Area
2Units
LL97 Covered0 Active Violations
Condo, commercial tower (mixed-use) [derived] · Owner of record: New School University · 15,747 sf lot · 6.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofThe New School46p · 3 filings · 20 docs
Floor 5The New School28p · 2 filings · 20 docs
Floor 4The New School28p · 1 filing · 15 docs
Floor 3The New School7p · 1 filing · 2 docs
Floor 2
Floor 1Fab Beauty, Foot Locker60p · 8 filings · 20 docs
MezzanineFab Beauty45p · 2 filings · 20 docs
CellarFab Beauty8p · 2 filings · 20 docs
Site & exteriorFoot Locker1p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The New School7410/04/2026
Sutton Garrett Realty5107/08/2026
22 East 142603/21/2026
22 E 14 LLC C/O Sutton-Garret2203/21/2026
New School University1203/21/2026
PFNY203/21/2026
HGL Art103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nyccode2003/21/2026
Simple Architecture1603/21/2026
Hwangs Building Management403/21/2026
JRK Creative403/21/2026
Green Light Expediting1003/21/2026
Building Brothers403/21/2026
Perotto Consulting Management203/21/2026
Lewsan Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cross ManagementGeneral Contractor1007/08/2026
Magnetic Builders GroupGeneral Contractor407/08/2026
Newport DesignsScaffold303/21/2026
Newport DesignsGeneral Contractor303/21/2026
Wise Electrical ServicesElectrical203/21/2026
Concept Air Conditioningspecialty_contractor203/21/2026
Tom Rectenwald ConstructionGeneral Contractor203/21/2026
Active SignsSign hanger207/08/2026
Brosna ConstructionGeneral Contractor203/21/2026
Goodall ElectricElectrical103/22/2026
Tri State Plumbing & HeatingPlumbing107/08/2026
M.C. Electrical NYElectrical103/21/2026
G.A.M.C.N.YGeneral Contractor107/08/2026
R&S Construction ContractingGeneral Contractor107/08/2026
Frankie Plumbing & HeatingPlumbing107/08/2026
Magic MechanicalPlumbing107/08/2026
Plumbing NYCFire Protection107/08/2026
RRP PlumbingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Delta Testing Labs6871004/08/2026
Darius Toraby Architects116110/16/2024
HRF Services5616607/09/2024
Hsu & Associates8025205/08/2024
SD Testing & Inspection S7010203/25/2024
RHL Engineering712110/11/2023
Richmond Testing Lab263110/05/2023
Gregory V. Perotto, P.E947112/09/2020
Building Lifecycle
All (208)Filed (37)Permit Issued (27)Signed Off (25)Violation (60)Inspection (9)Objection (20)Special Inspection (30)
09/17/2026
Signed off — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S1
09/15/2026
Signed off — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S4
09/11/2026
Signed off — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-I1
09/11/2026
Signed off — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S5
09/10/2026
Signed off — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S2
08/18/2026
Signed off — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-S2
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2026
Permit issued — General Construction
M01255400-S5-GC
04/10/2026
Permit issued — Structural
M01255400-S4-ST
04/09/2026
Special inspection requirement — Structural Steel - Welding
RICHARD GREENWALD
04/09/2026
Special inspection requirement — Structural Wood Frame
RICHARD GREENWALD
04/09/2026
Special inspection requirement — Structural Steel - Details
RICHARD GREENWALD
04/09/2026
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD GREENWALD
04/09/2026
Special inspection requirement — Wood – Seismic Resistance
RICHARD GREENWALD
04/09/2026
Special inspection requirement — Final
RICHARD GREENWALD
04/08/2026
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S5
04/08/2026
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-P1
04/08/2026
Permit issued — Mechanical Systems
M01255400-S3-MS
04/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/25/2026
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S3
03/11/2026
Permit issued — Plumbing
M01255400-S6-PL
03/02/2026
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S4
02/27/2026
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S6
02/26/2026
Signed off — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-S1
01/22/2026
Permit issued — General Construction
M01255400-S2-GC
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
01/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
RICHARD GREENWALD
01/20/2026
Special inspection requirement — Heating Systems
RICHARD GREENWALD
01/06/2026
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S2
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
12/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
RICHARD GREENWALD
12/19/2025
Special inspection requirement — Final
RICHARD GREENWALD
12/15/2025
Signed off — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-I1
12/12/2025
Signed off — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-S3
12/08/2025
Filed — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-P1
12/05/2025
Special inspection requirement — Wood – Seismic Resistance
11/17/2025
Special inspection requirement — Final
RICHARD GREENWALD
11/17/2025
Special inspection requirement — Final
JOEL NAPACH
11/17/2025
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/23/2025
Permit issued — Mechanical Systems
M01255400-S1-MS
10/17/2025
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-S1
10/08/2025
Permit issued — General Construction
M01255400-I1-GC
10/08/2025
Special inspection requirement — Final
RICHARD GREENWALD
10/08/2025
Special inspection requirement — Structural Steel - Welding
RICHARD GREENWALD
10/08/2025
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD GREENWALD
10/08/2025
Special inspection requirement — Structural Steel - Details
RICHARD GREENWALD
10/08/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
10/06/2025
Filed — Alteration
Interior mechanical demo scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
M01255400-I1
08/05/2025
Permit issued — Mechanical Systems
M01212995-S1-MS
07/29/2025
Permit issued — Structural
M01212995-S2-ST
07/18/2025
Filed — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-S2
07/18/2025
Filed — Alteration
Structural scope associated with the renovation of the 004 FL at the New School, new dunnage on a roof. No change of use, egress or occupancy.
M01212995-S1
07/14/2025
Special inspection requirement — Final
JOEL NAPACH
07/02/2025
Signed off — Alteration
FILING FOR CONSTRUCTION FENCE ASSOCIATED WITH CREATION OF STOREFRONT ENTRANCE AS PER PLANS SUBMITTED HEREWITH.
M00916972-I1
06/13/2025
Permit issued — General Construction
M01212995-I1-GC
05/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
05/29/2025
Special inspection requirement — Heating Systems
RICHARD GREENWALD
05/29/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
Latest 60 of 208 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCross Management04/14/2026
DOB NOWStructuralSigned-offCross Management04/10/2026
DOB NOWMechanical SystemsSigned-offCross Management04/08/2026
DOB NOWPlumbingSigned-offMagic Mechanical03/11/2026
DOB NOWGeneral ConstructionSigned-offCross Management01/22/2026
DOB NOWMechanical SystemsSigned-offCross Management10/23/2025
DOB NOWGeneral ConstructionSigned-offCross Management10/08/2025
DOB NOWMechanical SystemsSigned-offCross Management08/05/2025
DOB NOWStructuralSigned-offCross Management07/29/2025
DOB NOWGeneral ConstructionSigned-offCross Management06/13/2025
DOB NOWGeneral ConstructionSigned-offCross Management05/16/2025
DOB NOWGeneral ConstructionSigned-offBrosna Construction10/28/2024
DOB NOWMechanical SystemsSigned-offMagnetic Builders Group08/20/2024
DOB NOWSprinklersSigned-offRalph W. Landolfi JR04/19/2024
DOB NOWStructuralSigned-offMagnetic Builders Group04/09/2024
DOB NOWSprinklersSigned-offPlumbing NYC03/29/2024
DOB NOWPlumbingSigned-offFrankie Plumbing & Heating03/18/2024
DOB NOWMechanical SystemsSigned-offGamcny03/13/2024
DOB NOWGeneral ConstructionSigned-offMagnetic Builders Group03/11/2024
DOB NOWPlumbingSigned-offDW Plumbing02/28/2024
DOB NOWStructuralSigned-offR&S Construction Contracting11/13/2023
DOB NOWGeneral ConstructionSigned-offNewport Designs09/27/2023
DOB NOWConstruction FenceSigned-offNewport Designs09/26/2023
DOB NOWSignSigned-offActive Signs12/22/2022
DOB NOWSignSigned-offActive Signs12/22/2022
DOB NOWGeneral ConstructionSigned-offArtur Home Improvement09/01/2021
DOB NOWMechanical SystemsSigned-offConcept Air Conditioning12/22/2020
BIS—ISSUEDHaian Honest Renovation08/27/2024
BIS—ISSUEDHaian Honest Renovation03/11/2024
BISSPISSUEDMetro Fire Protection07/18/2016
BISOTISSUEDA.D. Winston Service07/08/2016
BISMHISSUEDA.D. Winston Service07/08/2016
BIS—ISSUEDInterboro Sign & Electrical Ma06/30/2016
BISOTISSUEDNucor Construction06/10/2016
BISMHISSUEDNucor Construction06/10/2016
BISOTRE-ISSUEDNucor Construction06/01/2016
BISMHISSUEDNucor Construction06/01/2016
BIS—ISSUEDFrank Torrone & Sons04/12/2016
BIS—ISSUEDFrank Torrone & Sons04/12/2016
BIS—ISSUEDFrank Torrone & Sons04/12/2016
+ 37 more permits on file
2 projects · most recent 04/08/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/08/2026Signed-offCross ManagementHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FXFA48AAVJU 48,000 BTU · Vrf Indoor ×16
REYA168AATJA 168,000 BTU · Vrf Outdoor ×8
FXSA48AAVJU 48,000 BTU · Vrf Indoor ×2
REYA72AATJA 72,000 BTU · Vrf Outdoor ×2
DPSH12B 142,842 BTU · Rooftop Unit ×1
Rebel DPSH12B 142,842 BTU · Rooftop Unit ×2
Ventilation
Rebel DPSH12B 142,842 BTU · Heat Pump Outdoor ×2
Refrigeration
Daikin REYA168AATJA 168,000 BTU · Vrf Outdoor ×8
REYA72AATJA 72,000 BTU · Vrf Outdoor ×2
12/08/2025Signed-offCross ManagementHeating and Air Conditioning Systems
Heat / Cool
Aaon RNA-030-C-A-B 325,800 BTU · Doas ×1
2 projects · most recent 04/08/2026
Water/Sanitary
FiledStatusContractorScope
04/08/2026Signed-offMagic MechanicalWater/Sanitary
10/30/2023——Water/Sanitary
9 projects · most recent 05/15/2026
General Wiring
FiledStatusContractorScope
05/15/2026Permit IssuedE.S.B. ElectricGeneral Wiring
02/13/2026Permit IssuedM.C. Electrical NYGeneral Wiring
07/22/2025CompleteEcny Electrical ContractorsGeneral Wiring
06/10/2025CompleteM.C. Electrical NYGeneral Wiring
05/12/2025CompleteGoodall ElectricGeneral Wiring
08/27/2024CompleteAmerican Power Electric ConsGeneral Wiring
09/29/2023CompleteLaredo ElectricGeneral Wiring
04/19/2022CompleteNee Electrical—
01/10/2022CompleteJohn Michael Electrical ContgGeneral Wiring
2 projects · most recent 04/08/2026
Steel Wood
FiledStatusContractorScope
04/08/2026Signed-offCross ManagementSteel, Wood
12/08/2025Signed-offCross ManagementSteel, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
04/09/2026Structural Steel - High Strength BoltingRICHARD GREENWALDspecial
04/09/2026Structural Wood FrameRICHARD GREENWALDprogress
04/09/2026FinalRICHARD GREENWALDprogress
04/09/2026Structural Steel - DetailsRICHARD GREENWALDspecial
04/09/2026Structural Steel - WeldingRICHARD GREENWALDspecial
04/09/2026Wood – Seismic ResistanceRICHARD GREENWALDspecial
01/22/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
01/22/2026Fire-Resistance Rated ConstructionRICHARD GREENWALDprogress
01/20/2026Heating SystemsRICHARD GREENWALDspecial
12/19/2025FinalRICHARD GREENWALDprogress
12/19/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
12/19/2025Fire-Resistance Rated ConstructionRICHARD GREENWALDprogress
12/05/2025Wood – Seismic Resistance—special
11/17/2025FinalRICHARD GREENWALDprogress
11/17/2025FinalJOEL NAPACHprogress
11/17/2025Mechanical SystemsRICHARD GREENWALDspecial
10/08/2025Structural Steel - WeldingRICHARD GREENWALDspecial
10/08/2025FinalRICHARD GREENWALDprogress
10/08/2025Post-installed AnchorsRICHARD GREENWALDspecial
10/08/2025Structural Steel - DetailsRICHARD GREENWALDspecial
10/08/2025Structural Steel - High Strength BoltingRICHARD GREENWALDspecial
07/14/2025FinalJOEL NAPACHprogress
05/29/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
05/29/2025Post-installed AnchorsRICHARD GREENWALDspecial
05/29/2025Heating SystemsRICHARD GREENWALDspecial
Latest 25 of 85.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The New SchoolEducationFloors 3–5, Roof
Project M01255400 Alteration · Permit Entire · 10/06/2025
Project M01212995 Alteration · LOC Issued · 05/15/2025
Project M01103568 Alteration · LOC Issued · 10/16/2024
Fab BeautyOfficeCellar, Floor 1, Mezzanine
Project M00974680 Alteration · LOC Issued · 02/15/2024
Project M00975538 Alteration · LOC Issued · 02/12/2024
Foot LockerRetailFloor 1
Project M00570999 Alteration · LOC Issued · 08/24/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,029 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch36
09/03/2026M00570999-I1Request digital key ↗
09/01/2026M00588821-I1Request digital key ↗
09/01/2026M00588806-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00333533-I1Request digital key ↗
▸Applications & Permits203
▸BISPLAN / WORK APPROVAL APPLICATION98
02/12/2025121978182Open ↗
11/04/2024121978182Open ↗
11/01/2024121978182Open ↗
Showing 3 of 98 on file for this type
▸BISWORK PERMIT APPLICATION72
03/11/2024121978182Open ↗
03/11/2024121978182Open ↗
07/20/2016122763312Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWLPC Approval/Permit27
08/27/2026M00975538-I1Open ↗
08/27/2026M00975538-S1Open ↗
08/20/2026M01212995-S2Open ↗
Showing 3 of 27 on file for this type
▸BISPLACE OF ASSEMBLY4
06/10/2016122243875Open ↗
06/10/2016122243875Open ↗
Showing 2 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING EXHIBIT I- CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
12/17/2025121978182Open ↗
▸Seals & Professional Certifications303
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION118
06/26/2017122550444Open ↗
12/15/2016122612850Open ↗
12/15/2016122673936Open ↗
Showing 3 of 118 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/01/2026M00588821-I1Open ↗
08/29/2026M00916972-I1Open ↗
08/28/2026M00949649-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
09/25/2026M00975538-P2Open ↗
09/25/2026M00975538-P2Open ↗
09/23/2026M01212995-S1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/25/2026M00975538-P2Open ↗
09/23/2026M01212995-S1Open ↗
09/23/2026M01212995-S1Open ↗
Showing 3 of 33 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT30
07/01/2016122809684Open ↗
07/01/2016122809684Open ↗
06/16/2016122750754Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST26
07/01/2016122809684Open ↗
06/16/2016122750754Open ↗
06/10/2016122612850Open ↗
Showing 3 of 26 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Trade Schedules & Equipment52
▸BISSELF-CERT PLUMBING NOTICE19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
11/17/2016122763312Open ↗
04/29/2016122714090Open ↗
Showing 2 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
03/22/2017110394136Open ↗
06/03/2016122645708Open ↗
Showing 2 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos81
▸BISASBESTOS: CERTIFICATION (DEP ACP5)33
07/01/2016122809684Open ↗
06/16/2016122750754Open ↗
06/10/2016122612850Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report26
09/01/2026M00588821-I1Open ↗
08/28/2026M00949649-S1Open ↗
08/27/2026M00916967-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/18/2026M01255400-S4Open ↗
08/18/2026M01255400-S5Open ↗
08/18/2026M01255400-S2Open ↗
Showing 3 of 7 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance50
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS28
06/26/2017122550444Open ↗
10/18/2016122714072Open ↗
10/18/2016122714072Open ↗
Showing 3 of 28 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
06/26/2017122550444Open ↗
10/18/2016122714072Open ↗
09/22/2016121032006Open ↗
Showing 3 of 9 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00570999-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00333533-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
09/28/2018121978182Open ↗
▸Approvals, Objections & Sign-offs122
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST47
10/04/2018121978182Open ↗
09/28/2018121978182Open ↗
06/08/2018121978182Open ↗
Showing 3 of 47 on file for this type
▸BISLANDMARKS APPROVAL38
06/26/2017122550444Open ↗
10/18/2016122714072Open ↗
08/10/2016122131040Open ↗
Showing 3 of 38 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
02/12/2025121978182Open ↗
11/04/2024121978182Open ↗
11/01/2024121978182Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
06/26/2017122550444Open ↗
10/25/2016122809684Open ↗
05/31/2016121978182Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLandmark Approval2
08/13/2026M01255400-S5Open ↗
08/13/2026M01255400-S3Open ↗
▸BISLANDMARKS SIGNOFF1
08/23/2024121978182Open ↗
▸Cost, Insurance & Ownership79
▸BISCOST AFFIDAVIT79
06/26/2017122550444Open ↗
05/09/2017110394136Open ↗
05/04/2017122763312Open ↗
Showing 3 of 79 on file for this type
▸Filing & Intake Forms83
▸BISEFILING COVER SHEET44
07/01/2016122809684Open ↗
07/01/2016122809684Open ↗
06/16/2016122750754Open ↗
Showing 3 of 44 on file for this type
▸BISADDITIONAL INFORMATION23
06/20/2024121978182Open ↗
11/25/2016122243875Open ↗
11/17/2016122763312Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISBOROUGH INTAKE FORM7
03/11/2024121978182Open ↗
10/04/2018121978182Open ↗
09/28/2018121978182Open ↗
Showing 3 of 7 on file for this type
▸Other Documents7
▸BISSupporting Document: Fee Deferment2
06/10/2016122243875Open ↗
06/10/2016122243875Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
08/30/2017121904859Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M01212995-I1Open ↗
08/13/2026M01255400-I1Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type