0Year Built
—Stories
V0Building Class
R8Zoning
0 sfGross Floor Area
0Units
Rent Stabilized21 Active Violations 20 unresolved · 1 paperwork only ▸
Zoned residential, not Manhattan · Owner of record: 21 E 198 Realty · 6,480 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsUnder Construction1 filing
RoofTemporary pipe scaffold installation3 filings
Floor 1121 E 198 Realty LLCUnder Construction1p · 4 filings · 10 docs
Floor 10Temporary needle beam installation4 filings · 10 docs
Floor 9Temporary pipe scaffold installation3 filings
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exterior21 E 198 Realty LLCUnder Construction6 filings
Filed — no permit issuedTemporary sidewalk shed installation2 filings · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
781-783 Elsmere PL3110/17/2026
744 E 215 LLC807/08/2026
21 E 198 Realty403/21/2026
21 E 198 LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/22/2024$1.8M—— → —— not available
02/22/2019$725K—Private party → 21 E 198 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Grid Drafting and Consulting2203/21/2026
AE Design Solution1003/21/2026
Sierra Safety203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alb-Star Capital'sGeneral Contractor1007/08/2026
Core Scaffold SystemsScaffold607/08/2026
Rightway Plumbing and HeatingFire Protection207/08/2026
Alb-Star Capital'sScaffold204/09/2026
L & A Developers Group*Scaffold207/08/2026
Expert Fire SprinklerFire Protection207/08/2026
Best Mechanical ServicesPlumbing107/08/2026
L & A Developers Group*General Contractor107/08/2026
Solid State ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
International Geotehcnica17951009/28/2026
PCS Engineering3745204/23/2026
Leo Y Lee Associates2481102/24/2026
Concrete Solutions Lab Co5344110/24/2025
Building Lifecycle
All (196)Filed (25)Permit Issued (24)Signed Off (7)Violation (60)Inspection (7)Objection (40)Special Inspection (30)Tax Incentive (3)
02/22/2027
485-x construction completed
10/16/2026
Filed — New Building
Sprinkler and Standpipe work in conjunction with NB application # X01089171-I1
X01089171-Z1
10/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
10/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
10/16/2026
Special inspection requirement — Maintenance information
10/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
10/07/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
10/01/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/28/2026
Filed — New Building
Sprinkler and Standpipe work in conjunction with NB application # X01089171-I1
X01089171-P4
09/25/2026
Filed — New Building
Sprinkler and Standpipe work in conjunction with NB application # X01089171-I1
X01089171-P9
09/25/2026
Objection resolved — Resolved
09/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
09/23/2026
Special inspection requirement — Sprinkler Systems
MICHAEL KARANTINIDIS, P.E.
09/23/2026
Special inspection requirement — Standpipe Systems
MICHAEL KARANTINIDIS, P.E.
09/12/2026
Objection raised — Other
08/25/2026
Filed — New Building
Sprinkler and Standpipe work in conjunction with NB application # X01089171-I1
X01089171-P5
08/17/2026
Special inspection requirement — Fenestration air leakage
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Lighting in dwelling units
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Insulation placement and R values
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Electrical motors and elevators
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Metering
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Fenestration areas
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Lighting controls
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Exterior lighting power
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Air barrier - visual inspection
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Interior lighting power
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
08/17/2026
Special inspection requirement — Air barrier — testing
MICHAEL KARANTINIDIS, P.E.
06/24/2026
Permit issued — Sprinklers
X01089171-S7-EW-SP
06/18/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01362746-I1
06/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/17/2026
Signed off — Alteration
X01349780-I1
06/17/2026
Signed off — Alteration
X01364512-I1
06/17/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01379277-I1
06/17/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X01362753-I1
06/08/2026
Violation issued (ECB, open)
Construction
06/08/2026
Violation issued (ECB, closed)
Construction
06/08/2026
Violation issued (ECB, closed)
Construction
05/20/2026
Permit issued — Sidewalk Shed
X01349780-I1-SH
05/14/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/09/2026
Violation issued (ECB, closed)
Construction
05/07/2026
Permit issued — General Construction
X01089171-I1-GC
05/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/30/2026
Violation issued (HPD, open)
A
04/29/2026
Filed — Alteration
X01349780-P1
04/23/2026
Filed — Alteration
Suspended Scaffold for Facade Restoration as Shown on Plans
X01366065-P1
04/21/2026
Permit issued — Mechanical Systems
X01089171-S6-MS
04/21/2026
Permit issued — Suspended Scaffold
X01366065-I1-SC
04/17/2026
Permit issued — Protection and Mechanical Methods
X01379277-I1-PMM
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedRightway Plumbing and Heating06/24/2026
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems05/20/2026
DOB NOWGeneral ConstructionPermit IssuedAlb-Star Capital's05/07/2026
DOB NOWMechanical SystemsPermit IssuedAlb-Star Capital's04/21/2026
DOB NOWSuspended ScaffoldPermit IssuedL & A Developers Group*04/21/2026
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems04/17/2026
DOB NOWPlumbingPermit IssuedBest Mechanical Services04/14/2026
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems04/02/2026
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems04/02/2026
DOB NOWGeneral ConstructionPermit IssuedAlb-Star Capital's03/30/2026
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems03/19/2026
DOB NOWStandpipePermit IssuedRightway Plumbing and Heating02/13/2026
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems02/12/2026
DOB NOWGeneral ConstructionPermit IssuedAlb-Star Capital's02/11/2026
DOB NOWGeneral ConstructionPermit IssuedAlb-Star Capital's02/09/2026
DOB NOWStructuralPermit IssuedAlb-Star Capital's01/08/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedAlb-Star Capital's12/31/2025
DOB NOWStandpipePermit IssuedExpert Fire Sprinkler12/23/2025
DOB NOWSprinklersPermit IssuedExpert Fire Sprinkler12/23/2025
DOB NOWConstruction FencePermit IssuedAlb-Star Capital's12/22/2025
DOB NOWFoundationPermit IssuedAlb-Star Capital's12/22/2025
DOB NOWSupport of ExcavationSigned-offAlb-Star Capital's12/18/2025
DOB NOWFull DemolitionSigned-offL A Developers Group*01/31/2025
DOB NOWConstruction FencePermit IssuedL A Developers Group*12/06/2024
BISOTISSUEDE&J All Seasons Construction07/26/2017
BISOTISSUEDE&J All Seasons Construction08/23/2016
BISPLISSUEDPrecision Plumbing Services04/30/2014
BISOTISSUEDMarco Polo Design03/27/2014
1 project · most recent 10/16/2026
Sprinkler System
FiledStatusContractorScope
10/16/2026Permit IssuedRightway Plumbing and HeatingSprinkler System
1 project · most recent 10/16/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/16/2026Permit IssuedRightway Plumbing and HeatingGas, Storm, Water/Sanitary
7 projects · most recent 10/08/2026
General Wiring
FiledStatusContractorScope
10/08/2026Permit IssuedS&R Electrical & Mechanical—
10/08/2026Permit IssuedS&R Electrical & MechanicalGeneral Wiring
04/20/2026Permit IssuedJam Electrical—
03/31/2026Permit IssuedS&R Electrical & Mechanical—
02/05/2026CompleteSolas Electrical—
01/21/2026CompleteSolas Electrical—
11/13/2025CancelledSolid State ElectricGeneral Wiring
1 project · most recent 10/16/2026
Concrete Masonry
FiledStatusContractorScope
10/16/2026Permit IssuedRightway Plumbing and HeatingConcrete, Masonry
3 projects · most recent 02/24/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
02/24/2026Signed-offCore Scaffold SystemsScaffold
01/16/2026——Sidewalk Shed
01/11/2026——Sidewalk Shed
1 project · most recent 10/16/2026
Earthwork Support of Excavation
FiledStatusContractorScope
10/16/2026Permit IssuedRightway Plumbing and HeatingEarthwork, Support of Excavation
1 project · most recent 04/23/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/23/2026Permit IssuedL & A Developers Group*Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/07/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
10/01/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/14/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
03/17/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 123
DateRequirementInspectorRole
10/16/2026HVAC-R and service water heating system controls—energy_progress
10/16/2026Maintenance information—energy_progress
10/16/2026HVAC-R and service water heating equipment—energy_progress
10/16/2026HVAC-R and service water piping design and insulation—energy_progress
09/23/2026Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
09/23/2026Sprinkler SystemsMICHAEL KARANTINIDIS, P.E.special
09/23/2026Standpipe SystemsMICHAEL KARANTINIDIS, P.E.special
08/17/2026Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
08/17/2026Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
08/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMICHAEL KARANTINIDIS, P.E.special
08/17/2026HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
08/17/2026Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
08/17/2026HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
08/17/2026HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
08/17/2026Lighting in dwelling unitsMICHAEL KARANTINIDIS, P.E.energy_progress
08/17/2026Air barrier - visual inspectionMICHAEL KARANTINIDIS, P.E.energy_progress
08/17/2026MeteringMICHAEL KARANTINIDIS, P.E.energy_progress
08/17/2026Electrical motors and elevatorsMICHAEL KARANTINIDIS, P.E.energy_progress
08/17/2026Fenestration air leakageMICHAEL KARANTINIDIS, P.E.energy_progress
08/17/2026Interior lighting powerMICHAEL KARANTINIDIS, P.E.energy_progress
08/17/2026Exterior lighting powerMICHAEL KARANTINIDIS, P.E.energy_progress
08/17/2026Lighting controlsMICHAEL KARANTINIDIS, P.E.energy_progress
08/17/2026Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
08/17/2026Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
08/17/2026Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
Latest 25 of 123.
▾Documents — 231 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/20/2026X01072678-I1Request digital key ↗
08/20/2026X01150455-I1Request digital key ↗
08/18/2026X01313483-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
04/22/2025220307987Open ↗
02/15/2019220307987Open ↗
02/18/2015220307987Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
07/26/2017220307987Open ↗
08/23/2016220307987Open ↗
05/02/2014220307987Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026X01089171-I1Open ↗
08/13/2026X01089171-P2Open ↗
08/13/2026X01089171-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/17/2026X01089171-I1Open ↗
08/17/2026X01089171-P1Open ↗
08/13/2026X01089171-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026X01089171-I1Open ↗
08/17/2026X01089171-P1Open ↗
08/13/2026X01089171-P2Open ↗
▸Seals & Professional Certifications136
▸DOB NOWProgress Inspector Seal & Signature72
09/23/2026X01089171-P4Open ↗
09/23/2026X01089171-P6Open ↗
09/23/2026X01089171-P6Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature39
10/04/2026X01089171-P9Open ↗
10/04/2026X01089171-P9Open ↗
10/04/2026X01089171-P9Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
10/04/2026X01089171-P9Open ↗
08/18/2026X01313483-I1Open ↗
08/17/2026X01339963-I1Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/18/2013220307987Open ↗
06/26/2013220307987Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026X01072678-I1Open ↗
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/17/2026X01089171-P1Open ↗
08/17/2026X01089171-I1Open ↗
08/13/2026X01089171-P2Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
06/25/2014220307987Open ↗
06/25/2014220307987Open ↗
▸BISSCHEDULE B - PLUMBING1
06/26/2013220307987Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X01072678-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/17/2026X01089171-I1—
▸DOB NOWSewer Cut-Off1
08/13/2026X01072678-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01072678-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01072678-I1Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist3
08/17/2026X01089171-I1Open ↗
08/17/2026X01089171-P1Open ↗
08/13/2026X01089171-P2Open ↗
▸BISSTREET TREE CHECKLIST2
02/17/2026240365001Open ↗
06/26/2013220307987Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/17/2026240365001Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01089171-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/20/2013220307987Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01072678-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026X01072678-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/18/2013220307987Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X01089171-S2Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026X01089171-S2Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION8
02/17/2026240365001Open ↗
12/18/2013220307987Open ↗
10/01/2013220307987Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER1
08/23/2016220307987Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE2
07/19/2017220307987Open ↗
08/23/2016220307987Open ↗
▸BISCOST AFFIDAVIT1
06/26/2013220307987Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/26/2013220307987Open ↗
▸Other Documents20
▸DOB NOWProperty Ownership Certification4
08/17/2026X01089171-I1Open ↗
08/17/2026X01089171-P1Open ↗
08/13/2026X01089171-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/17/2026X01089171-I1Open ↗
08/17/2026X01089171-P1Open ↗
08/13/2026X01089171-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026X01089171-I1Open ↗
08/17/2026X01089171-P1Open ↗
08/13/2026X01089171-P2Open ↗
▸DOB NOWManufacturer's Specifications2
08/17/2026X01366065-P1Open ↗
08/17/2026X01366065-I1Open ↗
▸DOB NOWCalculations2
08/17/2026X01366065-I1Open ↗
08/17/2026X01366065-P1Open ↗
▸DOB NOWPro Cert Restriction Exception (LL158/17)1
08/13/2026X01347696-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X01072678-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X01089171-S1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01072678-I1Open ↗
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)1
08/13/2026X01089171-S2Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01072678-I1Open ↗