← Back
MANHATTAN
The 760 Madison Avenue Condominium
21 EAST 65 STREET · Upper East Side-Carnegie Hill · BIN 1041126
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
LL97 Covered0 Open Violations
Flood zone X
Locations of Work
ArchitectureStructuralElectricalFire ProtectionGeneral
Floor 527p · 4 filings · 20 docs
Floor 427p · 4 filings · 20 docs
Floor 328p · 4 filings · 20 docs
Floor 229p · 5 filings · 20 docs
Floor 132p · 7 filings · 20 docs
Cellar6p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SL GREEN REALTY CORP2007/08/2026
MADISON 65TH2003/21/2026
MADISON 65 CO. C/O DAVID FRANKEL303/21/2026
MADISON 65 CO C O DAVID FRANKEL303/21/2026
752 DEVELOPMENT FEE203/21/2026
MADISON 65 OWNER203/21/2026
DAVID FRANKEL REALTY203/21/2026
WEATHERLEY 65TH STREET203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECC203/21/2026
CONSOLIDATED SCAFFOLD BRIDGE203/21/2026
EUROCELT EXPEDITING, INC403/21/2026
HOWARD I SHAPIRO ASSOCIATES1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNIVERSAL BUILD SUPP LLCGeneral Contractor1207/08/2026
W5 GROUP LLCGeneral Contractor307/08/2026
PAL ENVIRONMENTAL SAFETYGeneral Contractor207/08/2026
GABBIDON, CECILElectrical103/21/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor107/08/2026
KROEZ, LAWRENCEElectrical103/21/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 INSPECTIONS INC1471604/11/2022
SEVERUD ASSOCIATES2224312/20/2021
Building Lifecycle
All (86)Filed (10)Permit Issued (17)Signed Off (6)Violation (27)Special Inspection (26)
09/19/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00539556-I1
09/19/2024
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00540513-I1
07/25/2024
Signed off — Alteration
Temporary shoring and bracing to laterally support the facade during sub-cellar excavation as per plans filed herewith.
M00425699-I1
05/23/2024
Permit issued — Construction Fence
M00539556-I1-FN
05/23/2024
Permit issued — Sidewalk Shed
M00540513-I1-SH
03/27/2024
Signed off — Alteration
M00490742-I1
02/01/2024
Signed off — Alteration
NON-STRUCTURAL INTERIOR DEMOLITION TO PREPARE BUILDING FOR FULL DEMOLITION AS PER PLANS FILED HEREWITH. FULL STRUCTURAL DEMOLITION FILED SEPARATELY UNDER 123923558.
M00454925-I1
02/01/2024
Signed off — Alteration
M00685034-I1
06/28/2023
Permit issued — Structural
M00425699-I1-ST
05/24/2023
Permit issued — Construction Fence
M00539556-I1-FN
05/23/2023
Permit issued — Sidewalk Shed
M00540513-I1-SH
07/01/2022
Permit issued — Structural
M00425699-I1-ST
05/26/2022
Permit issued — Construction Fence
M00539556-I1-FN
05/26/2022
Permit issued — Sidewalk Shed
M00540513-I1-SH
05/25/2022
Permit issued — Structural
M00685034-I1-ST
05/18/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/2022
Filed — Alteration
M00685034-I1
03/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/09/2022
Violation issued (ECB, closed)
Construction
12/21/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
JACOB HAAS
12/21/2021
Special inspection requirement — Final
James Scheld
12/21/2021
Special inspection requirement — Post-installed Anchors
JACOB HAAS
12/21/2021
Special inspection requirement — Structural Steel - Details
JACOB HAAS
12/21/2021
Special inspection requirement — Concrete - Cast-In-Place
Cawsie Jijina
12/21/2021
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JACOB HAAS
12/21/2021
Special inspection requirement — Structural Steel - High Strength Bolting
JACOB HAAS
12/21/2021
Special inspection requirement — Structural Steel - Welding
JACOB HAAS
12/20/2021
Filed — Alteration
Temporary shoring and bracing to laterally support the facade during sub-cellar excavation as per plans filed herewith.
M00425699-P2
12/20/2021
Special inspection requirement — Structural Steel - Details
JACOB HAAS
12/20/2021
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JACOB HAAS
12/20/2021
Special inspection requirement — Concrete - Cast-In-Place
Cawsie Jijina
12/20/2021
Special inspection requirement — Post-installed Anchors
JACOB HAAS
12/20/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
JACOB HAAS
12/20/2021
Special inspection requirement — Structural Steel - High Strength Bolting
JACOB HAAS
12/20/2021
Special inspection requirement — Structural Steel - Welding
JACOB HAAS
12/20/2021
Special inspection requirement — Final
James Scheld
12/10/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/10/2021
Violation issued (ECB, closed)
Construction
12/10/2021
Violation issued (ECB, closed)
Construction
10/06/2021
Permit issued — General Construction
M00454925-I1-GC
09/09/2021
Filed — Alteration
Temporary shoring and bracing to laterally support the facade during sub-cellar excavation as per plans filed herewith.
M00425699-P1
08/09/2021
Violation issued (ECB, closed)
Construction
08/09/2021
Violation issued (ECB, closed)
Construction
07/23/2021
Special inspection requirement — Concrete - Cast-In-Place
Cawsie Jijina
07/19/2021
Special inspection requirement — Post-installed Anchors
JACOB HAAS
07/19/2021
Special inspection requirement — Structural Steel - Details
JACOB HAAS
07/19/2021
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JACOB HAAS
07/19/2021
Special inspection requirement — Final
James Scheld
07/19/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
JACOB HAAS
07/19/2021
Special inspection requirement — Structural Steel - Welding
JACOB HAAS
07/19/2021
Special inspection requirement — Structural Steel - High Strength Bolting
JACOB HAAS
06/21/2021
Permit issued — Sidewalk Shed
M00540513-I1-SH
06/19/2021
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00540513-I1
06/18/2021
Filed — Alteration
INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00539556-I1
05/27/2021
Violation issued (ECB, closed)
Construction
05/26/2021
Permit issued — Structural
M00425699-I1-ST
05/21/2021
Permit issued — Structural
M00425699-I1-ST
05/20/2021
Filed — Alteration
Temporary shoring and bracing to laterally support the facade during sub-cellar excavation as per plans filed herewith.
M00425699-I1
05/13/2021
Permit issued — Sprinklers
M00502224-I1-EW-SP
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offUNIVERSAL BUILD SUPP LLC05/23/2024
DOB NOWSidewalk ShedSigned-offUNIVERSAL BUILD SUPP LLC05/23/2024
DOB NOWStructuralSigned-offUNIVERSAL BUILD SUPP LLC06/28/2023
DOB NOWConstruction FenceSigned-offUNIVERSAL BUILD SUPP LLC05/24/2023
DOB NOWSidewalk ShedSigned-offUNIVERSAL BUILD SUPP LLC05/23/2023
DOB NOWStructuralSigned-offUNIVERSAL BUILD SUPP LLC07/01/2022
DOB NOWConstruction FenceSigned-offUNIVERSAL BUILD SUPP LLC05/26/2022
DOB NOWSidewalk ShedSigned-offUNIVERSAL BUILD SUPP LLC05/26/2022
DOB NOWStructuralSigned-offW5 GROUP LLC05/25/2022
DOB NOWGeneral ConstructionSigned-offW5 GROUP LLC10/06/2021
DOB NOWSidewalk ShedSigned-offUNIVERSAL BUILD SUPP LLC06/21/2021
DOB NOWStructuralSigned-offUNIVERSAL BUILD SUPP LLC05/26/2021
DOB NOWStructuralSigned-offPAL ENVIRONMENTAL SAFETY05/21/2021
DOB NOWSprinklersPermit IssuedAMERICAN STANDARD PLUMBIN05/13/2021
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING04/23/2021
DOB NOWProtection and Mechanical MethodsSigned-offW5 GROUP LLC03/25/2021
DOB NOWGeneral ConstructionSigned-offPAL ENVIRONMENTAL SAFETY01/22/2021
BIS—ISSUEDPAL ENVIRONMENTAL SAFETY12/30/2021
BIS—ISSUEDPAL ENVIRONMENTAL SAFETY12/28/2021
BISEQISSUEDCONSOLIDATED SCAFFOLDING07/14/2021
BIS—ISSUEDPAL ENVIRONMENTAL SAFETY06/25/2021
BISEQISSUEDPAL ENVIRONMENTAL SAFETY06/25/2021
BISOTISSUEDGEORGE & JERZY CONTRACTIN12/13/2012
BISSPISSUEDARIANA CONTRACTING INC04/04/2011
BISMHISSUEDGEORGE & JERZY CONTRACTIN03/10/2011
BISOTISSUEDGEORGE & JERZY CONTRACTIN03/10/2011
BISPLRE-ISSUEDARIANA CONTRACTING INC02/14/2011
BISMHISSUEDGEORGE & JERZY CONTRACTIN02/07/2011
BISOTISSUEDGEORGE & JERZY CONTRACTIN02/04/2011
BISPLISSUEDARIANA CONTRACTING INC08/24/2010
BISMHISSUEDCOTTAM HEATING & AIR CONDIT.08/24/2010
BISOTISSUEDGEORGE & JERZY CONTRACT06/30/2010
BISMHISSUEDFABRIZZIO CONSTRUCTION IN11/09/2007
BISOTISSUEDFAWN HEATING AND COOLING01/11/2006
BISMHISSUEDFAWN HEATING AND COOLING09/29/2005
BISPLISSUEDM & S BUILDING SERVICES I08/27/1990
BISOTISSUEDR.C DOLNER INC08/09/1990
1 project · most recent 04/23/2021
Scaffold
FiledStatusContractorScope
04/23/2021Permit IssuedCONSOLIDATED SCAFFOLDINGScaffold
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
12/21/2021Structural Stability – Alterations of existing buildingsJACOB HAASspecial
12/21/2021FinalJames Scheldprogress
12/21/2021Post-installed AnchorsJACOB HAASspecial
12/21/2021Structural Steel - DetailsJACOB HAASspecial
12/21/2021Concrete - Cast-In-PlaceCawsie Jijinaspecial
12/21/2021Alternative Materials - OTCR Buildings Bulletin NumberJACOB HAASspecial
12/21/2021Structural Steel - High Strength BoltingJACOB HAASspecial
12/21/2021Structural Steel - WeldingJACOB HAASspecial
12/20/2021Structural Steel - DetailsJACOB HAASspecial
12/20/2021Alternative Materials - OTCR Buildings Bulletin NumberJACOB HAASspecial
12/20/2021Concrete - Cast-In-PlaceCawsie Jijinaspecial
12/20/2021Post-installed AnchorsJACOB HAASspecial
12/20/2021Structural Stability – Alterations of existing buildingsJACOB HAASspecial
12/20/2021Structural Steel - High Strength BoltingJACOB HAASspecial
12/20/2021Structural Steel - WeldingJACOB HAASspecial
12/20/2021FinalJames Scheldprogress
07/23/2021Concrete - Cast-In-PlaceCawsie Jijinaspecial
07/19/2021Post-installed AnchorsJACOB HAASspecial
07/19/2021Structural Steel - DetailsJACOB HAASspecial
07/19/2021Alternative Materials - OTCR Buildings Bulletin NumberJACOB HAASspecial
07/19/2021FinalJames Scheldprogress
07/19/2021Structural Stability – Alterations of existing buildingsJACOB HAASspecial
07/19/2021Structural Steel - WeldingJACOB HAASspecial
07/19/2021Structural Steel - High Strength BoltingJACOB HAASspecial
04/12/2021Sprinkler SystemsJACOB HAASspecial
Latest 25 of 26.
▾Documents — 273 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch6
09/04/2026M00490742-I1Request digital key ↗
09/03/2026M00508208-I1Request digital key ↗
09/03/2026M00502224-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/03/2026M00425699-P2Request digital key ↗
09/03/2026M00425699-I1Request digital key ↗
08/15/2026M00425699-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00454925-I1Request digital key ↗
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION28
12/29/2023110013128Open ↗
12/29/2023110000515Open ↗
12/29/2023104029917Open ↗
Showing 3 of 28 on file for this type
▸BISWORK PERMIT APPLICATION20
01/03/2022123923558Open ↗
12/29/2021123923558Open ↗
07/14/2021141003553Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWLPC Approval/Permit5
09/04/2026M00454925-I1Open ↗
09/03/2026M00425699-P1Open ↗
09/03/2026M00425699-I1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications82
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
07/02/2021123923558Open ↗
11/09/2020123923558Open ↗
03/15/2016120600028Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/29/2026M00502224-I1Open ↗
09/01/2026M00425699-P2Open ↗
09/01/2026M00425699-P2Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
04/04/2011120650937Open ↗
02/08/2011120600028Open ↗
02/08/2011120600028Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/04/2026M00454925-I1Open ↗
09/04/2026M00490742-I1Open ↗
09/03/2026M00508208-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
04/04/2011120650937Open ↗
03/15/2011120600028Open ↗
02/08/2011120600028Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M00425699-P2Open ↗
09/01/2026M00454925-I1Open ↗
08/29/2026M00425699-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/01/2021141003553Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/01/2021141003553Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/01/2021141003553Open ↗
▸Trade Schedules & Equipment23
▸BISSELF-CERT PLUMBING NOTICE9
07/25/2011120650937Open ↗
04/28/2011120650937Open ↗
04/15/2011120600028Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING7
04/04/2011120650937Open ↗
03/15/2011120600028Open ↗
02/08/2011120600028Open ↗
Showing 3 of 7 on file for this type
▸BISSEWER CONNECTION: DEP SD1 & SD23
06/25/2021123923558Open ↗
06/25/2021123923558Open ↗
06/25/2021123923558Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
07/25/2011120650937Open ↗
11/21/2008110013128Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMITEQUIPMENT USE PERMITS1
03/15/2016120600028Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/15/2016120600028Open ↗
▸Safety & Tenant Protection3
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
07/02/2021123923558Open ↗
11/09/2020123923558Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
07/02/2021123923558Open ↗
▸Environmental & Asbestos18
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
04/04/2011120650937Open ↗
02/08/2011120600028Open ↗
08/20/2010120448471Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
06/25/2021123923558Open ↗
06/25/2021123923558Open ↗
06/25/2021123923558Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/03/2026M00425699-P1Open ↗
09/03/2026M00425699-I1Open ↗
09/02/2026M00685034-I1Open ↗
Showing 3 of 5 on file for this type
▸BISRODENT CONTROL1
06/25/2021123923558Open ↗
▸Energy Compliance4
▸BISAS-BUILT ENERGY ANALYSIS2
05/07/2015121367920Open ↗
01/15/2013120650937Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/07/2015121367920Open ↗
10/19/2012121367920Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/14/2021141003553Open ↗
07/01/2021141003553Open ↗
▸Approvals, Objections & Sign-offs33
▸BISLETTERS - SUPPORTING DOCUMENTATION10
06/25/2021123923558Open ↗
06/25/2021123923558Open ↗
06/25/2021123923558Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
10/19/2012121367920Open ↗
04/04/2011120650937Open ↗
02/08/2011120600028Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
08/01/2025141003553Open ↗
03/15/2016120600028Open ↗
11/19/2015120448471Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS APPROVAL6
07/01/2021141003553Open ↗
06/25/2021123923558Open ↗
06/25/2021123923558Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL1
07/31/2025141003553Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
01/04/2021123923558Open ↗
▸BISLANDMARKS SIGNOFF1
08/01/2025141003553Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT17
03/15/2016120600028Open ↗
11/19/2015120448471Open ↗
06/05/2015120399942Open ↗
Showing 3 of 17 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
01/03/2022123923558Open ↗
06/25/2021123923558Open ↗
06/25/2021123923558Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
06/25/2021123923558Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
06/25/2021123923558Open ↗
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET9
11/09/2020123923558Open ↗
10/19/2012121367920Open ↗
04/04/2011120650937Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION7
07/14/2021141003553Open ↗
03/15/2011120600028Open ↗
01/28/2011120448471Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM2
07/02/2021123923558Open ↗
06/01/2021123923558Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/01/2021141003553Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
01/03/2022123923558Open ↗
06/25/2021123923558Open ↗
06/25/2021123923558Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M00685034-I1Open ↗