← Back
All parking garages
21 HERKIMER PLACE
BROOKLYN · BIN 3053918
💬 Discuss this project
1910Year Built
1Stories
G1Building Class
M1-1A/R6BZoning
5,130 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
All parking garages · Owner of record: 21 HERKIMER REALTY LLC · 5,130 sf lot · 1 FAR built · Flood zone X
Locations of Work
StructuralMechanicalOther
Roof2p · 3 filings · 18 docs
Floor 12p · 2 filings · 12 docs
1 job · most recent 07/26/2021
General Wiring
FiledStatusContractorScope
07/26/2021CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
Building Lifecycle
All (27)Filed (4)Permit Issued (2)Signed Off (2)Violation (4)Special Inspection (15)
11/05/2025
Signed off — Alteration
REPLACEMENT OF EXISTING 2 CONDENSER UNIT WITHA NEW ONE AT ROOF FOR THE 1 STORY BUILDING
B01280446-I1
09/18/2025
Permit issued — Mechanical Systems
B01280446-I1-MS
09/09/2025
Filed — Alteration
REPLACEMENT OF EXISTING 2 CONDENSER UNIT WITHA NEW ONE AT ROOF FOR THE 1 STORY BUILDING
B01280446-I1
09/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
09/02/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
09/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
09/02/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
09/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
09/02/2025
Special inspection requirement — Final
NAVEEN KUMAR
06/25/2021
Signed off — Alteration
B00488780-I1
04/29/2021
Special inspection requirement — Structural Cold-Formed Steel
RAFI HAMID
04/29/2021
Special inspection requirement — Masonry
RAFI HAMID
04/29/2021
Special inspection requirement — Final
RAFI HAMID
04/27/2021
Filed — Alteration
B00488780-P1
04/26/2021
Special inspection requirement — Masonry
RAFI HAMID
04/26/2021
Special inspection requirement — Final
RAFI HAMID
04/26/2021
Special inspection requirement — Structural Cold-Formed Steel
RAFI HAMID
04/19/2021
Permit issued — Structural
B00488780-I1-ST
03/19/2021
Filed — Alteration
B00488780-I1
03/16/2021
Filed — Alteration
CONSTRUCTION OF A NEW 1 STORY CFS BEARING WALL
B00479526-I1
03/03/2021
Special inspection requirement — Final
03/03/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/03/2021
Special inspection requirement — Post-installed Anchors
09/11/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/08/2011
Violation issued (FDNY_NOV, closed)
03/13/2002
Violation issued (FDNY_NOV, closed)
03/13/2002
Violation issued (FDNY_NOV, closed)
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROOKLYN304/09/2026
HIVOLTS ELECTRICAL INC.903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/26/2019$1.7M—— → —$333/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SELF EMPLOYED109/09/2025
TITAN ENGINEERS PC304/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC603/21/2026
AVALON DESIGNS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PREFERRED GC GROUP INCGeneral Contractor303/21/2026
B T GENERAL BUILDERS INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519109/09/2025
SYED ENGINEERING, P.C.7054204/27/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offB T GENERAL BUILDERS09/18/2025
DOB NOWStructuralSigned-offPREFERRED GC GROUP INC04/19/2021
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
09/02/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
09/02/2025Mechanical SystemsYounes Abouyaalaspecial
09/02/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
09/02/2025Maintenance informationYounes Abouyaalaenergy_progress
09/02/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
09/02/2025FinalNAVEEN KUMARprogress
04/29/2021Structural Cold-Formed SteelRAFI HAMIDspecial
04/29/2021MasonryRAFI HAMIDspecial
04/29/2021FinalRAFI HAMIDprogress
04/26/2021MasonryRAFI HAMIDspecial
04/26/2021FinalRAFI HAMIDprogress
04/26/2021Structural Cold-Formed SteelRAFI HAMIDspecial
03/03/2021Final—progress
03/03/2021Structural Stability – Alterations of existing buildings—special
03/03/2021Post-installed Anchors—special
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00479526-I1Request digital key ↗
09/01/2026B00488780-P1Request digital key ↗
09/01/2026B00488780-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWSpecial Inspector Seal & Signature5
09/22/2026B01280446-I1Open ↗
08/31/2026B00488780-P1Open ↗
08/31/2026B00488780-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00479526-I1Open ↗
09/01/2026B00488780-P1Open ↗
09/01/2026B00488780-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/22/2026B01280446-I1Open ↗
09/22/2026B01280446-I1Open ↗
08/31/2026B00488780-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01280446-I1Open ↗