Miscellaneous two family
21 MARCONI PLACE
BROOKLYN · BIN 3042537
💬 Discuss this project
1901Year Built
2Stories
B9Building Class
R5Zoning
1,530 sfGross Floor Area
2Units
4 Open Violations ▸FDNY Report ↗
Miscellaneous two family · 1,639 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 21p · 1 filing · 7 docs
Floor 11p · 1 filing · 7 docs
Cellar1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PONDOSA DESIGN INC202/10/2021
ARCHITECT OWL101/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIME PIPING & HEATING INPlumbing1307/08/2026
BIOPHILIC BUILD LLCGeneral Contractor607/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PONDOSA DESIGN INC.5126202/10/2021
Building Lifecycle
All (43)Filed (3)Permit Issued (5)Signed Off (1)Violation (4)Inspection (3)Objection (10)Special Inspection (17)
02/21/2023
Signed off — Alteration
Interior renovation. Removal and replacement of interior non-load bearing partitions and finishes throughout. Removal and replacement of exterior doors and windows. Removal of facade stonework.
B00453546-I1
10/19/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/19/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/22/2021
Permit issued — Mechanical Systems
B00462679-I1-MS
09/22/2021
Permit issued — General Construction
B00453546-I1-GC
08/02/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/06/2021
Permit issued — Plumbing
B00462567-I1-PL
06/30/2021
Permit issued — Mechanical Systems
B00462679-I1-MS
05/17/2021
Permit issued — General Construction
B00453546-I1-GC
02/12/2021
Objection raised — Admin
02/12/2021
Objection resolved — Addressed
02/12/2021
Objection raised — Scope
02/12/2021
Objection resolved — Addressed
02/10/2021
Filed — Alteration
INSTALL NEW HEAT PUMP UNITS, BATHROON/KITCHEN EXHAUST FANS; NO CHANGE IN USE GROUP, EGRESS OR OCCUPANCY.
B00462679-I1
02/10/2021
Filed — Alteration
B00462567-I1
01/29/2021
Objection resolved — Addressed
01/29/2021
Special inspection requirement — Metering
Jared Smith
01/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MANG WONG
01/29/2021
Special inspection requirement — Heating Systems
MANG WONG
01/29/2021
Special inspection requirement — Electrical motors and elevators
Jared Smith
01/29/2021
Special inspection requirement — HVAC-R and service water heating system controls
Jared Smith
01/29/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Jared Smith
01/29/2021
Special inspection requirement — Maintenance information
Jared Smith
01/29/2021
Special inspection requirement — HVAC-R and service water heating equipment
Jared Smith
01/28/2021
Special inspection requirement — Final
Jared Smith
01/28/2021
Special inspection requirement — Mechanical Systems
MANG WONG
01/26/2021
Objection resolved — Addressed
01/26/2021
Objection resolved — Addressed
01/21/2021
Objection raised — Scope
01/21/2021
Objection raised — Structural
01/21/2021
Objection raised — Other
01/15/2021
Filed — Alteration
Interior renovation. Removal and replacement of interior non-load bearing partitions and finishes throughout. Removal and replacement of exterior doors and windows. Removal of facade stonework.
B00453546-I1
01/13/2021
Special inspection requirement — Energy Code Compliance
Jared Smith
01/13/2021
Special inspection requirement — Energy Code Compliance Inspections
Jared Smith
01/13/2021
Special inspection requirement — Fire-Resistance Rated Construction
Jared Smith
01/13/2021
Special inspection requirement — Fenestration air leakage
Jared Smith
01/13/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Jared Smith
01/13/2021
Special inspection requirement — Insulation placement and R values
Jared Smith
01/13/2021
Special inspection requirement — Final
Jared Smith
12/20/2004
Violation issued (HPD, open)
C
12/20/2004
Violation issued (HPD, open)
C
11/23/2001
Violation issued (HPD, open)
C
11/23/2001
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBIOPHILIC BUILD LLC09/22/2021
DOB NOWGeneral ConstructionSigned-offBIOPHILIC BUILD LLC09/22/2021
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/06/2021
DOB NOWMechanical SystemsPermit IssuedBIOPHILIC BUILD LLC06/30/2021
DOB NOWGeneral ConstructionSigned-offBIOPHILIC BUILD LLC05/17/2021
1 project · most recent 02/10/2021
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/10/2021Permit IssuedBIOPHILIC BUILD LLCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-3C24NA2 23,600 BTU · Heat Pump Outdoor ×2
Ventilation
Greenheck G-SQ60-VG 150 CFM · Exhaust Fan ×4
1 project · most recent 12/27/2022
General Wiring
FiledStatusContractorScope
12/27/2022CompleteACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/19/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/19/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/02/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
01/29/2021MeteringJared Smithenergy_progress
01/29/2021Fire-Resistant Penetrations and JointsMANG WONGspecial
01/29/2021Heating SystemsMANG WONGspecial
01/29/2021Electrical motors and elevatorsJared Smithenergy_progress
01/29/2021HVAC-R and service water heating system controlsJared Smithenergy_progress
01/29/2021HVAC-R and service water piping design and insulationJared Smithenergy_progress
01/29/2021Maintenance informationJared Smithenergy_progress
01/29/2021HVAC-R and service water heating equipmentJared Smithenergy_progress
01/28/2021FinalJared Smithprogress
01/28/2021Mechanical SystemsMANG WONGspecial
01/13/2021Energy Code ComplianceJared Smithprogress
01/13/2021Energy Code Compliance InspectionsJared Smithprogress
01/13/2021Fire-Resistance Rated ConstructionJared Smithprogress
01/13/2021Fenestration air leakageJared Smithenergy_progress
01/13/2021Fenestration and door U-factor and product ratingsJared Smithenergy_progress
01/13/2021Insulation placement and R valuesJared Smithenergy_progress
01/13/2021FinalJared Smithprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00453546-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/01/2026B00462567-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026B00462679-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026B00453546-I1Open ↗
08/26/2026B00453546-I1Open ↗
08/23/2026B00462679-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00453546-I1Open ↗
09/01/2026B00462567-I1Open ↗
09/01/2026B00462679-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B00462679-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00453546-I1Open ↗
09/01/2026B00462567-I1Open ↗
08/14/2026B00462679-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00453546-I1Open ↗