← Back
BuildNYC
One story - permanent living quarter
21 MESEREAU COURT
BROOKLYN · BIN 3247673
💬 Discuss this project
1920Year Built
1Stories
A2Building Class
R4-1Zoning
728 sfGross Floor Area
1Units
2 Active Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
One story - permanent living quarter · 2,293 sf lot · 0.32 FAR built · Flood zone AE
Locations of Work
ArchitectureGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Filed — no permit issuedAlteration to 3-story two-family house12p · 2 filings · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/18/2014$185K—Private party → Private party$254/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Banji Awosika Architect211/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Banji Architect403/21/2026
Building Lifecycle
08/10/2026
Failure to maintain building in a code compliant manner . Noted : at time of inspection, observed the soffit and shingles at exposure 1 and 2 is in…
ECB violation · open
06/10/2026
§ 27-2049 ADM code - post and maintain a street number on the front of the dwelling plainly visible from the sidewalk
HPD violation · open
04/15/2024
Objection resolved — Resolved
11/28/2023
Objection raised — Admin
11/28/2023
Objection raised — Scope
37 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
2 projects · most recent 11/18/2023
Heating and Air Conditioning Systems
FiledStatusContractorScope
11/18/2023——Heating and Air Conditioning Systems
09/01/2023——Heating and Air Conditioning Systems
2 projects · most recent 11/18/2023
Wood
FiledStatusContractorScope
11/18/2023——Wood
09/01/2023——Wood
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
11/16/2023Metering—energy_progress
11/16/2023Lowest Floor Elevation—progress
11/16/2023Fenestration and door U-factor and product ratings—energy_progress
11/16/2023Air barrier - visual inspection—energy_progress
11/16/2023Fenestration areas—energy_progress
11/16/2023Insulation placement and R values—energy_progress
11/16/2023HVAC-R and service water heating equipment—energy_progress
11/16/2023HVAC-R and service water heating system controls—energy_progress
11/16/2023Maintenance information—energy_progress
11/16/2023Fenestration air leakage—energy_progress
11/16/2023Permanent certificate—energy_progress
11/16/2023Structural Stability – Alterations of existing buildings—special
11/16/2023HVAC-R and service water piping design and insulation—energy_progress
11/16/2023Mechanical Systems—special
11/16/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
11/16/2023Structural Cold-Formed Steel—special
11/16/2023Fire-Resistant Penetrations and Joints—special
11/16/2023Heating Systems—special
11/16/2023Final—progress
11/16/2023Energy Code Compliance Inspections—progress
11/16/2023Fire-Resistance Rated Construction—progress
08/21/2023Heating Systems—special
08/21/2023Structural Stability – Alterations of existing buildings—special
08/21/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
08/21/2023Mechanical Systems—special
Latest 25 of 31.
10 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account