← Back
BuildNYC
Elevator apt, semi-fireproof without stores
21 MT HOPE PLACE
BRONX · BIN 2129694
💬 Discuss this project
2022Year Built
9Stories
D1Building Class
R8Zoning
37,495 sfGross Floor Area
55Units
Rent Stabilized29 Active Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: Hope Place · 6,250 sf lot · 6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsThe Vaja Group6 filings
RoofThe Vaja Group2p · 1 filing
CellarThe Vaja Group1 filing
Site & exteriorThe Vaja Group5 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Vaja Group7107/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/20/2021$782K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Vasilios Artemiou PE406/13/2023
Engineering Solutions710/12/2022
FL&M Engineering Design & Inspection409/22/2022
Blue SKY Design806/29/2022
South Bay Engineering212/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YG Expediting1403/21/2026
Tom Winter Architect1003/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Manhattan D EnterprisesScaffold807/08/2026
City Wide Builders GroupGeneral Contractor707/08/2026
City Wide Builders GroupScaffold607/08/2026
Pat Sementa P & H CoPlumbing403/22/2026
Prime Piping & HeatingFire Protection407/08/2026
Prime Piping & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161806/13/2023
Building Lifecycle
All (196)Filed (25)Permit Issued (19)Signed Off (12)Violation (60)Inspection (14)Objection (36)Special Inspection (30)
09/04/2026
Violation issued (HPD, open)
B
09/04/2026
Violation issued (HPD, open)
B
09/04/2026
Violation issued (HPD, open)
C
06/26/2026
Violation issued (HPD, open)
B
06/26/2026
Violation issued (HPD, open)
C
06/16/2026
Violation issued (HPD, open)
B
06/16/2026
Violation issued (HPD, open)
C
06/07/2026
Violation issued (HPD, closed)
B
06/07/2026
Violation issued (HPD, open)
C
06/07/2026
Violation issued (HPD, open)
A
06/07/2026
Violation issued (HPD, closed)
B
05/26/2026
Violation issued (HPD, open)
C
05/26/2026
Violation issued (HPD, closed)
B
05/26/2026
Violation issued (HPD, open)
C
05/26/2026
Violation issued (HPD, closed)
B
05/18/2026
Violation issued (HPD, closed)
B
05/18/2026
Violation issued (ECB, open)
Elevators
05/18/2026
Violation issued (HPD, open)
C
05/18/2026
Violation issued (HPD, closed)
C
05/12/2026
Violation issued (HPD, open)
C
05/12/2026
Violation issued (HPD, open)
C
05/12/2026
Violation issued (HPD, closed)
C
05/11/2026
Violation issued (HPD, closed)
C
05/11/2026
Violation issued (HPD, open)
C
05/05/2026
Violation issued (HPD, open)
B
05/05/2026
Violation issued (HPD, closed)
C
05/05/2026
Violation issued (HPD, open)
B
03/05/2026
Violation issued (HPD, closed)
C
03/05/2026
Violation issued (HPD, closed)
C
03/05/2026
Violation issued (HPD, closed)
C
03/05/2026
Violation issued (HPD, closed)
B
02/24/2026
Violation issued (HPD, open)
C
02/24/2026
Violation issued (HPD, closed)
C
02/24/2026
Violation issued (HPD, closed)
A
02/24/2026
Violation issued (HPD, closed)
C
02/24/2026
Violation issued (HPD, closed)
C
02/18/2026
Violation issued (ECB, open)
Elevators
02/06/2026
Violation issued (HPD, closed)
A
02/06/2026
Violation issued (HPD, closed)
C
02/06/2026
Violation issued (HPD, closed)
C
02/06/2026
Violation issued (HPD, closed)
A
02/06/2026
Violation issued (HPD, closed)
C
01/23/2026
Violation issued (HPD, closed)
C
01/23/2026
Violation issued (HPD, closed)
C
01/23/2026
Violation issued (HPD, closed)
B
01/23/2026
Violation issued (HPD, closed)
C
01/23/2026
Violation issued (HPD, closed)
B
01/23/2026
Violation issued (HPD, closed)
B
01/09/2026
Violation issued (HPD, closed)
B
01/09/2026
Violation issued (HPD, closed)
C
01/09/2026
Violation issued (HPD, closed)
C
12/09/2025
Violation issued (HPD, closed)
C
11/05/2025
Violation issued (HPD, closed)
C
10/18/2025
Violation issued (HPD, closed)
C
10/18/2025
Violation issued (HPD, closed)
C
10/15/2025
Violation issued (HPD, closed)
B
10/15/2025
Violation issued (HPD, closed)
C
10/15/2025
Violation issued (HPD, closed)
C
10/15/2025
Violation issued (HPD, open)
C
10/15/2025
Violation issued (HPD, closed)
C
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCity Wide Builders Group05/05/2023
DOB NOWSprinklersSigned-offAmb Mechanical03/29/2023
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises03/07/2023
DOB NOWConstruction FenceSigned-offCity Wide Builders Group02/01/2023
DOB NOWStandpipeSigned-offAmb Mechanical01/30/2023
DOB NOWSupport of ExcavationSigned-offCity Wide Builders Group01/04/2023
DOB NOWConstruction FenceSigned-offCity Wide Builders Group12/21/2022
DOB NOWPlumbingSigned-offPrime Piping & Heating11/16/2022
DOB NOWStandpipeSigned-offAmb Mechanical10/20/2022
DOB NOWProtection and Mechanical MethodsSigned-offManhattan D Enterprises09/22/2022
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises09/07/2022
DOB NOWSupport of ExcavationSigned-offCity Wide Builders Group07/15/2022
DOB NOWSprinklersSigned-offAmb Mechanical03/29/2022
DOB NOWPlumbingSigned-offPrime Piping & Heating03/29/2022
DOB NOWFoundationSigned-offCity Wide Builders Group03/16/2022
DOB NOWStructuralSigned-offCity Wide Builders Group03/15/2022
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises03/10/2022
DOB NOWConstruction FenceSigned-offCity Wide Builders Group01/05/2022
DOB NOWConstruction FenceSigned-offCity Wide Builders Group01/04/2022
BIS—ISSUEDCity Wide Builders Group12/13/2022
BIS—ISSUEDYatziv02/11/2022
BIS—ISSUEDYatziv02/11/2022
BISPLISSUEDPat Sementa P & H Co04/17/2019
BISOTISSUEDA.N.C. Contracting Co02/17/2011
1 project · most recent 07/26/2022
FiledStatusContractorScope
07/26/2022———
1 project · most recent 07/26/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/26/2022——Gas, Storm, Water/Sanitary
3 projects · most recent 10/03/2023
General Wiring
FiledStatusContractorScope
10/03/2023CompleteAccurate ElectricalGeneral Wiring
06/14/2023CompleteStar Electrical Contractors—
03/08/2022CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
09/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/01/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
09/01/2023Pass-Final SD - Fire PumpPassView ↗
08/25/2023Fail-Final SD - Fire PumpFailView ↗
06/23/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/21/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/14/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/12/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/05/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
11/25/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/17/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/24/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
06/15/2023Standpipe SystemsFAHAD FATEHspecial
06/06/2023Standpipe SystemsFAHAD FATEHspecial
06/02/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/02/2023Maintenance informationFAHAD FATEHenergy_progress
06/02/2023Sprinkler SystemsFAHAD FATEHspecial
06/02/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/02/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/01/2022Standpipe SystemsFAHAD FATEHspecial
07/26/2022HVAC-R and service water heating system controls—energy_progress
07/26/2022Sprinkler Systems—special
07/26/2022HVAC-R and service water piping design and insulation—energy_progress
07/26/2022Maintenance information—energy_progress
07/26/2022HVAC-R and service water heating equipment—energy_progress
07/19/2022HVAC-R and service water piping design and insulation—energy_progress
07/01/2022Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
07/01/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
07/01/2022UnderpinningFAHAD FATEHspecial
07/01/2022Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
07/01/2022Subgrade InspectionsFAHAD FATEHspecial
07/01/2022Structural Steel - WeldingFAHAD FATEHspecial
07/01/2022Structural Steel - DetailsFAHAD FATEHspecial
06/28/2022Structural Steel - WeldingFAHAD FATEHspecial
06/28/2022Subgrade InspectionsFAHAD FATEHspecial
06/28/2022Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
06/28/2022UnderpinningFAHAD FATEHspecial
Latest 25 of 65.
▾Documents — 221 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/24/2026X00587113-I1Request digital key ↗
08/24/2026X00587105-I1Request digital key ↗
08/24/2026X00658236-P1Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION11
06/28/2023210182112Open ↗
06/26/2023210182112Open ↗
12/01/2022210182112Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION5
12/15/2022210182112Open ↗
02/11/2022220738316Open ↗
02/11/2022220738487Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
09/30/2022240314520Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/03/2023210182112Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
12/05/2023210182112Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/27/2023210182112Open ↗
▸BISZONING DIAGRAM1
05/23/2022210182112Open ↗
▸Seals & Professional Certifications58
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/24/2026X00587113-I1Open ↗
08/24/2026X00587105-I1Open ↗
08/24/2026X00658236-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/17/2026X07997617-I1Open ↗
09/02/2026X00658835-I1Open ↗
09/02/2026X00658835-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026X00658767-P2Open ↗
09/01/2026X00656589-P3Open ↗
09/01/2026X00656589-P3Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
12/13/2022210182112Open ↗
05/17/2019220641606Open ↗
05/17/2019220641606Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/11/2019220641606Open ↗
11/08/2010220090906Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/30/2022240314520Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/08/2010220090906Open ↗
▸Trade Schedules & Equipment10
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0213
12/13/2022210182112Open ↗
02/11/2022220738316Open ↗
02/11/2022220738487Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/07/2019220641606Open ↗
04/11/2019220641606Open ↗
▸BISGAS CUT-OFF2
02/11/2022220738316Open ↗
02/11/2022220738487Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SC1
12/13/2022210182112Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
06/27/2023210182112Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/1
12/13/2022210182112Open ↗
▸Safety & Tenant Protection11
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
02/11/2022220738316Open ↗
02/11/2022220738487Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
02/11/2022220738487Open ↗
02/11/2022220738487Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
02/11/2022220738316Open ↗
02/11/2022220738487Open ↗
▸BISSTREET TREE CHECKLIST2
09/30/2022240314520Open ↗
05/17/2022210182112Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/30/2022240314520Open ↗
▸BISSTREET TREE SIGNOFF1
12/05/2023210182112Open ↗
▸BISFINAL - STREET TREE SIGNOFF1
12/06/2023210182112Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
02/11/2022220738316Open ↗
02/11/2022220738487Open ↗
04/11/2019220641606Open ↗
▸BISRODENT CONTROL2
02/11/2022220738316Open ↗
02/11/2022220738487Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/13/2022210182112Open ↗
04/11/2019220641606Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/27/2023210182112Open ↗
05/18/2022210182112Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026X00656589-I1Open ↗
08/13/2026X00656699-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/27/2023210182112Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
12/06/2023210182112Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
04/08/2022210182112Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/17/2019220641606Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY4
06/27/2023210182112Open ↗
05/18/2022210182112Open ↗
05/17/2022210182112Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT3
08/13/2026X00658835-P1Open ↗
08/13/2026X00658835-P2Open ↗
08/13/2026X00658835-I1Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
06/27/2023210182112Open ↗
12/09/2022210182112Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
09/29/2023210182112Open ↗
12/13/2022210182112Open ↗
▸BISSOIL REPORT1
05/17/2022210182112Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/17/2022210182112Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
12/13/2022210182112Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
07/05/2023210182112Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00658835-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00658835-I1Open ↗
▸Approvals, Objections & Sign-offs20
▸BISLETTERS - SUPPORTING DOCUMENTATION7
12/15/2022210182112Open ↗
02/11/2022220738316Open ↗
02/11/2022220738487Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
06/28/2023210182112Open ↗
06/26/2023210182112Open ↗
12/01/2022210182112Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
02/14/2022210182112Open ↗
01/20/2022210182112Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM2
02/11/2022220738316Open ↗
02/11/2022220738487Open ↗
▸BISFINAL - BPP: FINAL SIGNOFF1
12/06/2023210182112Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/08/2010220090906Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
07/03/2023210182112Open ↗
▸BISBPP: FINAL SIGNOFF1
12/06/2023210182112Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/17/2019220641606Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT3
05/17/2019220641606Open ↗
04/11/2019220641606Open ↗
11/08/2010220090906Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE3
12/13/2022210182112Open ↗
02/11/2022220738316Open ↗
02/11/2022220738487Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION12
07/05/2023210182112Open ↗
07/05/2023210182112Open ↗
07/05/2023210182112Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM5
02/11/2022220738316Open ↗
02/11/2022220738487Open ↗
07/06/2021220738487Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
07/06/2021220738487Open ↗
07/06/2021220738316Open ↗
04/11/2019220641606Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
09/30/2022240314520Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/30/2022240314520Open ↗
▸Other Documents7
▸BISCOMMUNITY BOARD NOTIFICATION2
02/11/2022220738487Open ↗
02/11/2022220738487Open ↗
▸BISBPP: FILING REQUIRED1
09/30/2022240314520Open ↗
▸BISPLOT DIAGRAM1
05/17/2022210182112Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/17/2022210182112Open ↗
▸BISFINAL - SUBMIT TAX MAP TO VERIFY BLOCK AND LOT OF PROPERTY1
12/06/2023210182112Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00658835-I1Open ↗