← Back
Three families
21 ST MARKS PLACE
BROOKLYN · BIN 3006022
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
3,600 sfGross Floor Area
3Units
Rent Stabilized11 Open Violations ▸
Three families · 2,083 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction19p · 1 filing · 20 docs
Floor 2Under Construction19p · 1 filing · 20 docs
Floor 1Under Construction21p · 1 filing · 20 docs
CellarUnder Construction22p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EILAT REALTY909/08/2026
21 SAINT MARKS GROUP LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/24/2025$2.4M—— → —$667/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN308/18/2026
ALWAYS FAST SERVICES CORP107/30/2026
M. HAMDI GUNAL, PE, P. C.206/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CSR EXPEDITERS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor207/31/2026
RONEY ELECTRIC INCElectrical103/22/2026
RISHON HOMES CORPGeneral Contractor104/09/2026
UNICORN BUILDERS GROUP LLGeneral Contractor104/09/2026
VSP MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SH ENGINEERING PLLC7024508/18/2026
Building Lifecycle
All (66)Filed (6)Permit Issued (5)Violation (25)Special Inspection (30)
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahriar Rafi
08/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahriar Rafi
08/21/2026
Special inspection requirement — Concrete - Cast-In-Place
Shahriar Rafi
08/21/2026
Special inspection requirement — Footing and Foundation
Shahriar Rafi
08/21/2026
Special inspection requirement — Final
Shahriar Rafi
08/21/2026
Special inspection requirement — Fenestration air leakage
Shahriar Rafi
08/21/2026
Special inspection requirement — Insulation placement and R values
Shahriar Rafi
08/21/2026
Special inspection requirement — Metering
Shahriar Rafi
08/21/2026
Special inspection requirement — Air barrier - visual inspection
Shahriar Rafi
08/21/2026
Special inspection requirement — Interior lighting power
Shahriar Rafi
08/21/2026
Special inspection requirement — Maintenance information
Shahriar Rafi
08/21/2026
Special inspection requirement — Permanent certificate
Shahriar Rafi
08/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahriar Rafi
08/21/2026
Special inspection requirement — Fenestration areas
Shahriar Rafi
08/18/2026
Filed — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation of the existing three family dwellings. Filed in conjunction with ALT II app#B01325761-I1
B01325761-P2
08/15/2026
Special inspection requirement — Metering
Shahriar Rafi
08/15/2026
Special inspection requirement — Concrete - Cast-In-Place
Shahriar Rafi
08/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahriar Rafi
08/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahriar Rafi
08/15/2026
Special inspection requirement — Final
Shahriar Rafi
08/15/2026
Special inspection requirement — Footing and Foundation
Shahriar Rafi
08/15/2026
Special inspection requirement — Insulation placement and R values
Shahriar Rafi
08/15/2026
Special inspection requirement — Air barrier - visual inspection
Shahriar Rafi
08/15/2026
Special inspection requirement — Maintenance information
Shahriar Rafi
08/15/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahriar Rafi
08/15/2026
Special inspection requirement — Fenestration air leakage
Shahriar Rafi
08/15/2026
Special inspection requirement — Fenestration areas
Shahriar Rafi
08/15/2026
Special inspection requirement — Interior lighting power
Shahriar Rafi
08/15/2026
Special inspection requirement — Permanent certificate
Shahriar Rafi
07/30/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B01428278-I1
07/30/2026
Permit issued — Sidewalk Shed
B01428278-I1-SH
07/30/2026
Permit issued — Supported Scaffold
B01428278-I1-SF
06/15/2026
Special inspection requirement — Footing and Foundation
Shahriar Rafi
06/15/2026
Special inspection requirement — Final
Shahriar Rafi
06/05/2026
Filed — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation of the existing three family dwellings. Filed in conjunction with ALT II app#B01325761-I1
B01325761-P1
05/06/2026
Permit issued — Plumbing
B01325761-S3-PL
05/06/2026
Violation issued (HPD, open)
A
04/08/2026
Filed — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation of the existing three family dwellings. Filed in conjunction with ALT II app#B01325761-I1
B01325761-S3
03/17/2026
Permit issued — Foundation
B01325761-S2-GC-CX
02/12/2026
Permit issued — General Construction
B01325761-I1-GC
02/03/2026
Filed — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation of the existing three family dwellings. Filed in conjunction with ALT II app#B01325761-I1
B01325761-S2
12/03/2025
Filed — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation of the existing three family dwellings. Filed in conjunction with ALT II app#B01325761-I1
B01325761-I1
04/11/2024
Violation issued (HPD, closed)
A
01/07/2024
Violation issued (HPD, open)
C
01/07/2024
Violation issued (HPD, open)
C
01/03/2024
Violation issued (HPD, open)
C
01/03/2024
Violation issued (HPD, open)
C
01/03/2024
Violation issued (HPD, open)
C
11/20/2023
Violation issued (HPD, open)
B
11/20/2023
Violation issued (HPD, closed)
I
11/20/2023
Violation issued (HPD, open)
C
11/20/2023
Violation issued (HPD, open)
C
11/20/2023
Violation issued (HPD, open)
B
11/20/2023
Violation issued (HPD, closed)
C
11/14/2023
Violation issued (HPD, open)
C
03/27/2023
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
A
03/02/2022
Violation issued (HPD, closed)
I
04/13/2021
Violation issued (HPD, closed)
I
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC07/30/2026
DOB NOWSupported ScaffoldPermit IssuedPHOENIX SUTTON STR INC07/30/2026
DOB NOWPlumbingPermit IssuedVSP MECHANICAL INC05/06/2026
DOB NOWFoundationPermit IssuedRISHON HOMES CORP03/17/2026
DOB NOWGeneral ConstructionPermit IssuedUNICORN BUILDERS GROUP LL02/12/2026
1 project · most recent 08/18/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/18/2026Permit IssuedVSP MECHANICAL INCGas, Storm, Water/Sanitary
2 projects · most recent 07/30/2026
General Wiring
FiledStatusContractorScope
07/30/2026Permit IssuedRICHARD NEU—
03/29/2026Permit IssuedRONEY ELECTRIC INCGeneral Wiring
1 project · most recent 08/18/2026
Steel Concrete Wood
FiledStatusContractorScope
08/18/2026Permit IssuedVSP MECHANICAL INCSteel, Concrete, Wood
1 project · most recent 07/30/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/30/2026Permit IssuedPHOENIX SUTTON STR INCScaffold, Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
08/21/2026Fire-Resistant Penetrations and JointsShahriar Rafispecial
08/21/2026Structural Stability – Alterations of existing buildingsShahriar Rafispecial
08/21/2026Concrete - Cast-In-PlaceShahriar Rafispecial
08/21/2026Footing and FoundationShahriar Rafiprogress
08/21/2026FinalShahriar Rafiprogress
08/21/2026Fenestration air leakageShahriar Rafienergy_progress
08/21/2026Insulation placement and R valuesShahriar Rafienergy_progress
08/21/2026MeteringShahriar Rafienergy_progress
08/21/2026Air barrier - visual inspectionShahriar Rafienergy_progress
08/21/2026Interior lighting powerShahriar Rafienergy_progress
08/21/2026Maintenance informationShahriar Rafienergy_progress
08/21/2026Permanent certificateShahriar Rafienergy_progress
08/21/2026Fenestration and door U-factor and product ratingsShahriar Rafienergy_progress
08/21/2026Fenestration areasShahriar Rafienergy_progress
08/15/2026MeteringShahriar Rafienergy_progress
08/15/2026Concrete - Cast-In-PlaceShahriar Rafispecial
08/15/2026Fire-Resistant Penetrations and JointsShahriar Rafispecial
08/15/2026Structural Stability – Alterations of existing buildingsShahriar Rafispecial
08/15/2026FinalShahriar Rafiprogress
08/15/2026Footing and FoundationShahriar Rafiprogress
08/15/2026Insulation placement and R valuesShahriar Rafienergy_progress
08/15/2026Air barrier - visual inspectionShahriar Rafienergy_progress
08/15/2026Maintenance informationShahriar Rafienergy_progress
08/15/2026Fenestration and door U-factor and product ratingsShahriar Rafienergy_progress
08/15/2026Fenestration air leakageShahriar Rafienergy_progress
Latest 25 of 56.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/18/2026B01325761-P2Request digital key ↗
08/16/2026B01325761-I1Request digital key ↗
08/16/2026B01325761-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION5
09/10/2021321560832Open ↗
09/10/2021321471475Open ↗
05/02/2017321560832Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B01325761-P1Open ↗
09/01/2026B01325761-S3Open ↗
09/01/2026B01325761-S3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/16/2026B01325761-I1Open ↗
08/16/2026B01325761-S3Open ↗
08/16/2026B01325761-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B01325761-P1Open ↗
09/01/2026B01325761-S3Open ↗
08/28/2026B01325761-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/02/2017321560832Open ↗
10/19/2016321467355Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/02/2017321560832Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/02/2017321560832Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
05/02/2017321560832Open ↗
10/19/2016321467355Open ↗
▸BISSTREET TREE CHECKLIST2
05/02/2017321560832Open ↗
10/19/2016321467355Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026B01325761-I1Open ↗
08/16/2026B01325761-P2Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/16/2026B01325761-S2Open ↗
08/16/2026B01325761-S3Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/02/2017321560832Open ↗
10/19/2016321467355Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/02/2017321560832Open ↗
10/19/2016321467355Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
05/01/2017321560832Open ↗
11/02/2016321471475Open ↗
10/19/2016321467355Open ↗
▸BISBOROUGH INTAKE FORM2
09/10/2021321560832Open ↗
09/10/2021321471475Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM2
05/02/2017321560832Open ↗
10/19/2016321467355Open ↗