← Back
Dormitory
21 UNION SQUARE
MANHATTAN · BIN 1087303
💬 Discuss this project
1986Year Built
12Stories
H8Building Class
C6-2AZoning
238,204 sfGross Floor Area
4Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMP
Dormitory · 28,125 sf lot · 8.47 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
BulkheadUnder Construction1p · 1 filing · 4 docs
Floor 123p · 2 filings · 16 docs
Floor 112p · 2 filings · 16 docs
Floor 103p · 1 filing · 8 docs
Floor 91p · 1 filing · 8 docs
Floor 8
Floor 72p · 1 filing · 8 docs
Floor 61p · 1 filing · 8 docs
Floor 51p · 1 filing · 8 docs
Floor 4
Floor 31p · 1 filing · 8 docs
Floor 21p · 1 filing · 8 docs
Floor 1Under Construction1p · 2 filings · 20 docs
CellarUnder Construction2p · 2 filings · 20 docs
1 job · most recent 07/30/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2026Signed-offINTERSTATE AIR COND & HTGAir Conditioning Systems
Cooling
Carrier 48FETA06C2A3A3A0C0 5 tons · Rooftop Unit ×1
Heating
Carrier 48FETA06C2A3A3A0C0 5 tons · Rooftop Unit ×1
1 job · most recent 03/24/2026
FiledStatusContractorScope
03/24/2026Permit IssuedSIRINA FIRE PROT CORP16 heads
1 job · most recent 03/24/2026
Water/Sanitary
FiledStatusContractorScope
03/24/2026Permit IssuedTRISTATE PLBG SVCS CORPWater/Sanitary
5 jobs · most recent 05/18/2026
General Wiring
FiledStatusContractorScope
05/18/2026Permit IssuedTOP SHELF ELECTRIC CORP—
02/10/2026Permit IssuedTRINITY ELECTRIC GROUPGeneral Wiring
07/27/2025Permit IssuedTRINITY ELECTRIC GROUPGeneral Wiring
08/05/2022CompleteNEAD ELECTRIC INC.General Wiring
07/06/2022CancelledNEAD ELECTRIC INC.1 meters
1 job · most recent 07/07/2026
Sidewalk Shed
FiledStatusContractorScope
07/07/2026Signed-offPJP INSTALLERS INCSidewalk Shed
1 job · most recent 07/30/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/30/2026Signed-offINTERSTATE AIR COND & HTGTenant Protection Plan 72 Hour
1 job · most recent 04/27/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/27/2026Permit IssuedDNA CONTRACTING LLCSuspended Scaffold (SC)
Building Lifecycle
All (171)Filed (23)Permit Issued (21)Signed Off (8)Facade (FISP) (12)Violation (60)Inspection (15)Objection (2)Special Inspection (30)
08/18/2026
Permit issued — Sidewalk Shed
M01399822-I1-SH
08/05/2026
Filed — Alteration
ERECT A NON-ILLUMINATED BUSINESS ACCESSORY BLADE SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01434206-I1
08/05/2026
Permit issued — Sign
M01434206-I1-SG
08/05/2026
Permit issued — Mechanical Systems
M01437404-I1-MS
07/30/2026
Filed — Alteration
PROPOSED REPLACEMENT OF EXISTING(1) PACKAGED ROOFTOP UNIT AT THE ROOFOF TOWER 1.
M01437404-I1
07/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
ELIAS RASABI
07/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
07/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
07/28/2026
Special inspection requirement — Final
ELIAS RASABI
07/28/2026
Special inspection requirement — Shutoff dampers
ELIAS RASABI
07/28/2026
Special inspection requirement — Mechanical Systems
ELIAS RASABI
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
07/07/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01399822-P1
06/18/2026
Permit issued — Protection and Mechanical Methods
M01417160-I1-PMM
06/16/2026
Filed — Alteration
M01417160-I1
05/20/2026
Permit issued — General Construction
M01354461-I1-GC
05/20/2026
Permit issued — Sidewalk Shed
M01399822-I1-SH
05/19/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01399822-I1
05/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/07/2026
Permit issued — General Construction
M01353536-I1-GC
05/07/2026
Permit issued — Plumbing
M01353536-S2-EW-SP
05/06/2026
Permit issued — Plumbing
M01353536-S2-PL
05/06/2026
Permit issued — Mechanical Systems
M01353536-S1-MS
04/29/2026
Permit issued — Suspended Scaffold
M01390717-I1-SC
04/27/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01390717-I1
03/24/2026
Filed — Alteration
Filing herewith general construction to include interior renovation and minor demo as per plans
M01353536-S2
03/24/2026
Filed — Alteration
Filing herewith general construction to include interior renovation and minor demo as per plans
M01353536-S1
03/20/2026
Filed — Alteration
Filing herewith general construction to include interior renovation and minor demo as per plans
M01353536-I1
03/19/2026
Filed — Alteration
Filing herewith facade repair as per plans
M01354461-I1
02/10/2026
Signed off — Alteration
MECHANICAL WORK INCLUDING COMMERCIAL KITCHEN RANGE-HOOD EXHAUST SYSTEM IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTING SPACE FOR POP UP BAGELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01198476-S2
02/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD LEMANSKY
02/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD LEMANSKY
02/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD LEMANSKY
02/06/2026
Special inspection requirement — Interior lighting power
RICHARD LEMANSKY
02/06/2026
Special inspection requirement — Maintenance information
RICHARD LEMANSKY
02/06/2026
Special inspection requirement — Lighting controls
RICHARD LEMANSKY
02/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
RICHARD LEMANSKY
02/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
RICHARD LEMANSKY
02/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
Roberta Levine
02/02/2026
Special inspection requirement — Final
Roberta Levine
01/30/2026
Special inspection requirement — Mechanical Systems
RICHARD LEMANSKY
01/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD LEMANSKY
01/30/2026
Special inspection requirement — Final
RICHARD LEMANSKY
01/30/2026
Special inspection requirement — Post-installed Anchors
RICHARD LEMANSKY
01/30/2026
Special inspection requirement — Final
RICHARD LEMANSKY
01/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/08/2026
Signed off — Alteration
MECHANICAL WORK INCLUDING COMMERCIAL KITCHEN RANGE-HOOD EXHAUST SYSTEM IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTING SPACE FOR POP UP BAGELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01198476-I1
01/02/2026
Filed — Alteration
MECHANICAL WORK INCLUDING COMMERCIAL KITCHEN RANGE-HOOD EXHAUST SYSTEM IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTING SPACE FOR POP UP BAGELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01198476-P3
01/02/2026
Special inspection requirement — Interior lighting power
RAFAEL FIGUEROA
01/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
RAFAEL FIGUEROA
01/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAFAEL FIGUEROA
01/02/2026
Special inspection requirement — Lighting controls
RAFAEL FIGUEROA
01/02/2026
Special inspection requirement — Final
RAFAEL FIGUEROA
01/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
RAFAEL FIGUEROA
12/31/2025
Filed — Alteration
MECHANICAL WORK INCLUDING COMMERCIAL KITCHEN RANGE-HOOD EXHAUST SYSTEM IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTING SPACE FOR POP UP BAGELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01198476-P2
12/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/30/2025
Special inspection requirement — Final
RAFAEL FIGUEROA
Latest 60 of 171 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK UNIVERSITY4208/29/2026
POPUP BAGELS1104/09/2026
NYU103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHVISION DESIGN STUDIO603/21/2026
OUTSOURCE CONSULTANTS, INC.603/21/2026
LOUIS STRIAR203/21/2026
JM ZONING, LLC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DNA CONTRACTING LLCGeneral Contractor507/08/2026
STRUCTURE TONE, LLCGeneral Contractor407/08/2026
PJP INSTALLERS INCGeneral Contractor308/20/2026
SIRINA FIRE PROT CORPFire Protection207/08/2026
TRISTATE PLBG SVCS CORPPlumbing207/08/2026
CUAN CORPGeneral Contractor203/21/2026
PRISTINE AIR CONDITIONINGGeneral Contractor104/09/2026
BEDROCK PLBG. & HTG., INCPlumbing107/08/2026
KING, ARTHURElectrical103/21/2026
MAUCERI SIGN SYSTEMSScaffold108/06/2026
MADZY, JOHNElectrical103/21/2026
PIMPINELLA, FRANKElectrical103/21/2026
BEDROCK MECHANICAL INCFire Protection107/08/2026
GBI INDUSTRY CORPGeneral Contractor104/09/2026
INTERSTATE AIR COND & HTGGeneral Contractor108/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416107/30/2026
SONI ENGINEERING CONSULTI9819104/27/2026
RICHMOND TESTING LAB263303/24/2026
LPE ENGINEERING PC3102103/19/2026
COLLECTIF ENGINEERING, PL7799701/02/2026
MOHAMMAD AHEAD - PROFESSI9286111/18/2025
SKYLINE ENGINEERING, PLLC267202/21/2024
KLINE ENGINEERING, PC1007307/07/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC08/18/2026
DOB NOWSignSigned-offMAUCERI SIGN CO., INC08/05/2026
DOB NOWMechanical SystemsSigned-offINTERSTATE AIR COND & HTG08/05/2026
DOB NOWProtection and Mechanical MethodsSigned-offPJP INSTALLERS INC06/18/2026
DOB NOWGeneral ConstructionPermit IssuedDNA CONTRACTING LLC05/20/2026
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC05/20/2026
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE TONE, LLC05/07/2026
DOB NOWPlumbingPermit IssuedSIRINA FIRE PROT CORP05/07/2026
DOB NOWPlumbingPermit IssuedTRISTATE PLBG SVCS CORP05/06/2026
DOB NOWMechanical SystemsPermit IssuedSTRUCTURE TONE, LLC05/06/2026
DOB NOWSuspended ScaffoldPermit IssuedDNA CONTRACTING LLC04/29/2026
DOB NOWGeneral ConstructionSigned-offGBI INDUSTRY12/11/2025
DOB NOWMechanical SystemsSigned-offPRISTINE AIR CONDITIONING07/07/2025
DOB NOWSprinklersSigned-offBEDROCK PLBG. & HTG., INC07/02/2025
DOB NOWSprinklersSigned-offBEDROCK MECHANICAL INC07/02/2025
DOB NOWGeneral ConstructionSigned-offCUAN06/25/2025
DOB NOWProtection and Mechanical MethodsSigned-offPAUL CHARLTON12/14/2023
DOB NOWGeneral ConstructionSigned-offPAUL CHARLTON10/26/2023
DOB NOWGeneral ConstructionSigned-offSTRUCTURE TONE, LLC05/20/2022
DOB NOWSprinklersSigned-offTRISTATE PLBG SVCS CORP05/13/2022
DOB NOWPlumbingSigned-offSIRINA FIRE PROT CORP05/13/2022
BISPLISSUEDMAXWELL PLUMB MECH. CORP07/11/2018
BISSPISSUEDMAXWELL PLUMB MECH. CORP07/11/2018
BISOTISSUEDSKYLINE RESTORATION INC02/25/2018
BISOTISSUEDSKYLINE RESTORATION INC01/23/2018
BISOTISSUEDYOUN DESIGN CORP11/15/2017
BISEQISSUEDCARLITOS CONTRACTING CORP08/31/2017
BISOTISSUEDSKYLINE RESTORATION INC08/21/2017
BIS—ISSUEDUNITECH DESIGN INC11/21/2016
BIS—ISSUEDUNITECH DESIGN INC11/21/2016
BISMHISSUEDLM CONSTRUCTION GROUP INC11/07/2016
BISSPISSUEDGO PRO FIRE PROTECTION C10/28/2016
BISPLISSUEDPARAMOUNT PLUMBING CO.,IN08/15/2016
BISSPISSUEDPARAMOUNT PLBG CO OF NY I08/15/2016
BISOTISSUEDLM CONSTRUCTION GROUP INC08/11/2016
BISEQISSUEDLM CONSTRUCTION GROUP INC08/11/2016
BISOTISSUEDBROSNA CONSTRUCTION CORPO06/15/2016
BISMHISSUEDBROSNA CONSTRUCTION CORPO06/15/2016
BISOTISSUEDSKYLINE RESTORATION INC07/10/2014
BISEQISSUEDSPRING SCAFFOLDING LLC05/20/2014
+ 5 more permits on file
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
05/15/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/15/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/15/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/15/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/19/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/05/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/29/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
06/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
07/30/2026Tenant Protection Plan ComplianceELIAS RASABIspecial
07/28/2026Mechanical SystemsELIAS RASABIspecial
07/28/2026HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
07/28/2026Shutoff dampersELIAS RASABIenergy_progress
07/28/2026HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
07/28/2026Energy Code Compliance InspectionsELIAS RASABIprogress
07/28/2026FinalELIAS RASABIprogress
02/06/2026HVAC-R and service water heating equipmentRICHARD LEMANSKYenergy_progress
02/06/2026HVAC-R and service water heating system controlsRICHARD LEMANSKYenergy_progress
02/06/2026Maintenance informationRICHARD LEMANSKYenergy_progress
02/06/2026Lighting controlsRICHARD LEMANSKYenergy_progress
02/06/2026Interior lighting powerRICHARD LEMANSKYenergy_progress
02/06/2026HVAC-R and service water piping design and insulationRICHARD LEMANSKYenergy_progress
02/03/2026Tenant Protection Plan ComplianceRICHARD LEMANSKYspecial
02/02/2026Tenant Protection Plan ComplianceRoberta Levinespecial
02/02/2026Tenant Protection Plan ComplianceRICHARD LEMANSKYspecial
02/02/2026FinalRoberta Levineprogress
01/30/2026Fire-Resistant Penetrations and JointsRICHARD LEMANSKYspecial
01/30/2026FinalRICHARD LEMANSKYprogress
01/30/2026Post-installed AnchorsRICHARD LEMANSKYspecial
01/30/2026Mechanical SystemsRICHARD LEMANSKYspecial
01/30/2026FinalRICHARD LEMANSKYprogress
01/02/2026Fire-Resistance Rated ConstructionRAFAEL FIGUEROAprogress
01/02/2026Tenant Protection Plan ComplianceRAFAEL FIGUEROAspecial
01/02/2026Fire-Resistant Penetrations and JointsRAFAEL FIGUEROAspecial
Latest 25 of 69.
▾Documents — 352 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/29/2026M00922533-I1Request digital key ↗
08/29/2026M00922533-P1Request digital key ↗
08/29/2026M00922533-S1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits59
▸BISPLAN / WORK APPROVAL APPLICATION35
04/20/2022120360509Open ↗
03/09/2018120360509Open ↗
03/01/2018120360509Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION22
07/26/2018120360509Open ↗
07/24/2018120360509Open ↗
11/16/2017120312802Open ↗
Showing 3 of 22 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
02/12/2015140200299Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1131
11/22/2010120382674Open ↗
▸Seals & Professional Certifications110
▸DOB NOWProgress Inspector Seal & Signature25
09/25/2026M01300982-I1Open ↗
09/01/2026M00922533-P1Open ↗
09/01/2026M01198476-S2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/18/2026M01354461-I1Open ↗
08/18/2026M01353536-S2Open ↗
08/18/2026M01353536-S1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/25/2026M01300982-I1Open ↗
09/01/2026M00922533-P1Open ↗
09/01/2026M00922533-P1Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
01/09/2019122734586Open ↗
11/26/2018122734586Open ↗
10/05/2018140667357Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
08/30/2017140688478Open ↗
07/24/2017140667357Open ↗
11/28/2016122951369Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
11/28/2016122951369Open ↗
11/25/2016122951350Open ↗
06/16/2016122734586Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/30/2017140688478Open ↗
07/24/2017140667357Open ↗
05/19/2014140200299Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/30/2017140688478Open ↗
07/24/2017140667357Open ↗
05/19/2014140200299Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment23
▸BISSCHEDULE B - PLUMBING6
02/04/2015122185946Open ↗
09/16/2010120360509Open ↗
09/07/2010120360509Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
07/17/2014120360509Open ↗
02/02/2011120360509Open ↗
10/01/2010120360509Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
05/31/2022120382674Open ↗
08/01/2013120382674Open ↗
10/26/2011110050818Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
10/12/2016122185946Open ↗
06/16/2016122734586Open ↗
12/04/2014122185946Open ↗
▸BISSIGN HANGER CERTIFICATE2
05/09/2017122951350Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/10/2019122734586Open ↗
05/10/2017122185946Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
09/17/2015122185946Open ↗
▸BISEQUIPMENT USE PERMITS1
05/10/2017122185946Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes4
11/28/2016122951369Open ↗
11/25/2016122951350Open ↗
08/30/2017140688478Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
01/10/2019122734586Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/18/2026M01354461-I1Open ↗
08/18/2026M01353536-S2Open ↗
08/18/2026M01353536-S1Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
11/28/2016122951369Open ↗
11/25/2016122951350Open ↗
11/18/2014122185946Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/24/2017140667357Open ↗
▸BIS* ASBESTOS ACP 7 OR 5 OR ASB 41
04/06/2022120360509Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
01/09/2019122734586Open ↗
11/26/2018122734586Open ↗
10/05/2018140667357Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
01/09/2019122734586Open ↗
11/26/2018122734586Open ↗
10/05/2018140667357Open ↗
Showing 3 of 5 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
08/30/2017140688478Open ↗
05/19/2014140200299Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/21/2017140667357Open ↗
07/24/2017140667357Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/24/2017140667357Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00707328-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/14/2022120360509Open ↗
08/30/2017140688478Open ↗
08/21/2017140667357Open ↗
Showing 3 of 4 on file for this type
▸BISMASONRY2
04/06/2022120360509Open ↗
04/06/2022120360509Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/06/2022120360509Open ↗
▸Approvals, Objections & Sign-offs29
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
08/25/2022120382674Open ↗
04/19/2022120360509Open ↗
04/07/2022120360509Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
08/25/2022120382674Open ↗
04/20/2022120360509Open ↗
05/09/2017122951369Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER2
07/26/2018120360509Open ↗
07/24/2018120360509Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00707328-I1Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT18
10/05/2018140667357Open ↗
07/24/2017140667357Open ↗
05/09/2017122951369Open ↗
Showing 3 of 18 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
08/11/2022120382674Open ↗
04/06/2022120360509Open ↗
▸Filing & Intake Forms27
▸BISEFILING COVER SHEET11
11/28/2016122951369Open ↗
11/25/2016122951350Open ↗
06/16/2016122734586Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM9
01/09/2019122734586Open ↗
10/05/2018140667357Open ↗
04/30/2018140688478Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION4
01/31/2017122185946Open ↗
01/09/2017122185946Open ↗
10/26/2016122185946Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/30/2017140688478Open ↗
07/24/2017140667357Open ↗
05/19/2014140200299Open ↗
▸Other Documents5
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
08/13/2026M00707357-I1Open ↗
08/13/2026M00707357-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/17/2015122185946Open ↗
▸DOB NOWCalculations1
08/17/2026M01390717-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/17/2026M01390717-I1Open ↗