← Back
Dormitory
Carlyle Court
21 UNION SQUARE · BIN 1087304
💬 Discuss this project
1986Year Built
12Stories
H8Building Class
C6-2AZoning
238,204 sfGross Floor Area
4Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMPFDNY Report ↗
Dormitory · 28,125 sf lot · 8.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction41p · 2 filings · 20 docs
Bulkhead2p · 1 filing · 2 docs
Penthouse41p · 1 filing · 20 docs
Floor 1242p · 1 filing · 20 docs
Floor 1140p · 1 filing · 20 docs
Floor 1040p · 1 filing · 20 docs
Floor 940p · 1 filing · 20 docs
Floor 840p · 1 filing · 20 docs
Floor 740p · 1 filing · 20 docs
Floor 640p · 1 filing · 20 docs
Floor 540p · 1 filing · 20 docs
Floor 440p · 1 filing · 20 docs
Floor 340p · 1 filing · 20 docs
Floor 240p · 1 filing · 20 docs
Floor 151p · 2 filings · 20 docs
Cellar48p · 2 filings · 20 docs
2 jobs · most recent 07/30/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2026Signed-offINTERSTATE AIR COND & HTGAir Conditioning Systems
Cooling
Carrier 48FETA06C2A3A3A0C0 5 tons · Rooftop Unit ×1
Heating
Carrier 48FETA06C2A3A3A0C0 5 tons · Rooftop Unit ×1
11/12/2025Permit IssuedSTRUCTURE TONE, LLCHeating and Air Conditioning Systems
Heat / Cool
Jaga ×5
Panasonic FV-0511VQ1 80 CFM · Exhaust Fan ×1
1 job · most recent 11/12/2025
FiledStatusContractorScope
11/12/2025Signed-offSIRINA FIRE PROT CORP636 heads
1 job · most recent 11/12/2025
FiledStatusContractorScope
11/12/2025Signed-offTRISTATE PLBG SVCS CORP—
7 jobs · most recent 05/18/2026
General Wiring
FiledStatusContractorScope
05/18/2026Permit IssuedTOP SHELF ELECTRIC CORP—
05/15/2026Permit IssuedNEAD ELECTRIC INC.General Wiring
01/16/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
05/14/2025CompleteNEAD ELECTRIC INC.General Wiring
06/10/2024CompleteTOP SHELF ELECTRIC CORP—
08/03/2022CancelledNEAD ELECTRIC INC.General Wiring
08/03/2022CancelledNEAD ELECTRIC INC.General Wiring
1 job · most recent 11/12/2025
Steel
FiledStatusContractorScope
11/12/2025Permit IssuedSTRUCTURE TONE, LLCSteel
2 jobs · most recent 05/19/2026
Sidewalk Shed Fence
FiledStatusContractorScope
05/19/2026Signed-offPJP INSTALLERS INCSidewalk Shed
07/15/2025Signed-offPLATFORM SOLUTIONS, INCFence
2 jobs · most recent 04/23/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/23/2026Permit IssuedDNA CONTRACTING LLCSuspended Scaffold (SC)
11/16/2023Permit Issued——
Building Lifecycle
All (128)Filed (30)Permit Issued (20)Signed Off (9)Facade (FISP) (12)Violation (13)Inspection (14)Special Inspection (30)
08/18/2026
Permit issued — Sidewalk Shed
M01399823-I1-SH
08/05/2026
Permit issued — Mechanical Systems
M01437447-I1-MS
07/30/2026
Filed — Alteration
REPLACEMENT OF EXISTING (1) PACKAGED ROOFTOP UNIT AT THE ROOFOF TOWER 3.
M01437447-I1
07/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
ELIAS RASABI
07/28/2026
Special inspection requirement — Mechanical Systems
ELIAS RASABI
07/28/2026
Special inspection requirement — Final
ELIAS RASABI
07/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
07/28/2026
Special inspection requirement — Shutoff dampers
ELIAS RASABI
07/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
07/17/2026
Signed off — Alteration
Installation of a Marquee on the entry way 1st floor as per plans. There will be no change in use, egress, or occupancy.
M01205829-S2
06/24/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY FENCE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION FENCE TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M01255365-I1
06/18/2026
Permit issued — Protection and Mechanical Methods
M01417175-I1-PMM
06/16/2026
Filed — Alteration
M01417175-I1
05/21/2026
Permit issued — General Construction
M01354113-I1-GC
05/20/2026
Permit issued — Sidewalk Shed
M01399823-I1-SH
05/19/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01399823-I1
05/08/2026
Permit issued — Suspended Scaffold
M01391705-I1-SC
04/23/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01391705-I1
03/19/2026
Filed — Alteration
Filing herewith Facade repairs as per plans.
M01354113-I1
02/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/13/2026
Signed off — Alteration
M01272719-I1
02/10/2026
Violation issued (FDNY_ORDER, closed)
02/10/2026
Violation issued (FDNY_ORDER, closed)
02/09/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/02/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/02/2026
Special inspection requirement — Final
Roberta Levine
02/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
Roberta Levine
01/14/2026
Violation issued (FDNY_NOV, closed)
01/06/2026
Signed off — Alteration
FILING FOR RENOVATION OF EXISTING RETAIL SPACE AT CELLAR AND 1ST FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01238482-S1
12/26/2025
Signed off — Alteration
FILING FOR RENOVATION OF EXISTING RETAIL SPACE AT CELLAR AND 1ST FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01238482-S2
12/22/2025
Permit issued — Mechanical Systems
M01238482-S2-MS
12/19/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jeffrey Stones
12/18/2025
Special inspection requirement — Mechanical Systems
Jeffrey Stones
12/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jeffrey Stones
12/18/2025
Special inspection requirement — Final
Jeffrey Stones
12/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
12/18/2025
Special inspection requirement — Shutoff dampers
Jeffrey Stones
12/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jeffrey Stones
12/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Stones
12/17/2025
Signed off — Alteration
FILING FOR RENOVATION OF EXISTING RETAIL SPACE AT CELLAR AND 1ST FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01238482-I1
12/17/2025
Filed — Alteration
FILING FOR RENOVATION OF EXISTING RETAIL SPACE AT CELLAR AND 1ST FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01238482-P4
12/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jeffrey Stones
12/11/2025
Filed — Alteration
FILING FOR RENOVATION OF EXISTING RETAIL SPACE AT CELLAR AND 1ST FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01238482-P3
12/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jeffrey Stones
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
12/04/2025
Special inspection requirement — Final
Jeffrey Stones
12/03/2025
Filed — Alteration
FILING FOR RENOVATION OF EXISTING RETAIL SPACE AT CELLAR AND 1ST FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01238482-P2
12/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/01/2025
Special inspection requirement — Final
Jeffrey Stones
12/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
11/12/2025
Filed — Alteration
Installation of a Marquee on the entry way 1st floor as per plans. There will be no change in use, egress, or occupancy.
M01205829-P4
11/03/2025
Special inspection requirement — Final
RICHARD LEMANSKY
11/03/2025
Special inspection requirement — Structural Steel - Welding
RICHARD LEMANSKY
11/03/2025
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD LEMANSKY
11/03/2025
Special inspection requirement — Structural Steel - Details
RICHARD LEMANSKY
11/03/2025
Special inspection requirement — Post-installed Anchors
RICHARD LEMANSKY
10/08/2025
Special inspection requirement — Sprinkler Systems
RICHARD LEMANSKY
Latest 60 of 128 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK UNIVERSITY7509/13/2026
PLATFORM SOLUTIONS INC.503/22/2026
NYU103/22/2026
D P CONSULTING103/22/2026
DP CONSULTING103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EUROCELT EXPEDITING, INC203/21/2026
BURNHAM NATIONWIDE INC2803/21/2026
GENE KAUFMAN ARCHITECT703/21/2026
SKYLINE ACCESS103/21/2026
INDESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PJP INSTALLERS INCGeneral Contractor508/20/2026
STRUCTURE TONE, LLCGeneral Contractor404/09/2026
DNA CONTRACTING LLCGeneral Contractor307/08/2026
PLATFORM SOLUTIONS, INCGeneral Contractor303/21/2026
BEAMAN, MARCElectrical203/21/2026
INTERSTATE AIR COND & HTGGeneral Contractor108/26/2026
MAXWELL PLUMB MECH CORPGeneral Contractor107/08/2026
SIGN MASTER USA INCGeneral Contractor104/09/2026
URBAN CONSTR & DESIGN LLCGeneral Contractor104/09/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
TRISTATE PLBG SVCS CORPPlumbing107/08/2026
KING, ARTHURElectrical103/21/2026
PIMPINELLA, FRANKElectrical103/21/2026
SIRINA FIRE PROT CORPFire Protection107/08/2026
DONE RIGHT KITCHEN EXHAUSGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416107/30/2026
LPE ENGINEERING PC3102103/19/2026
JSPECS,INC9429512/17/2025
RICHMOND TESTING LAB2631811/12/2025
YOU GAO9407108/20/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC08/18/2026
DOB NOWMechanical SystemsSigned-offINTERSTATE AIR COND & HTG08/05/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPJP INSTALLERS INC06/18/2026
DOB NOWGeneral ConstructionPermit IssuedDNA CONTRACTING LLC05/21/2026
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC05/20/2026
DOB NOWSuspended ScaffoldPermit IssuedDNA CONTRACTING LLC05/08/2026
DOB NOWMechanical SystemsSigned-offDONE RIGHT KITCHEN EXHAUS12/22/2025
DOB NOWGeneral ConstructionSigned-offSIGN MASTER USA INC08/25/2025
DOB NOWConstruction FenceSigned-offPLATFORM SOLUTIONS, INC07/15/2025
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC06/25/2025
DOB NOWGeneral ConstructionSigned-offURBAN CONSTR & DESIGN LLC06/20/2025
DOB NOWStructuralPermit IssuedSTRUCTURE TONE, LLC06/05/2025
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP05/27/2025
DOB NOWPlumbingSigned-offTRISTATE PLBG SVCS CORP05/19/2025
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE TONE, LLC05/01/2025
DOB NOWMechanical SystemsPermit IssuedSTRUCTURE TONE, LLC05/01/2025
DOB NOWMechanical SystemsSigned-offMAXWELL PLUMB MECH CORP08/05/2024
DOB NOWGeneral ConstructionSigned-offPAUL CHARLTON07/12/2024
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC06/10/2024
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC12/05/2023
BISOTISSUEDSTRUCTURE TONE, LLC06/20/2025
BISSPISSUEDMAXWELL PLUMB MECH. CORP07/11/2018
BISOTISSUEDSKYLINE RESTORATION INC02/25/2018
BISOTISSUEDSKYLINE RESTORATION INC01/23/2018
BISEQISSUEDCARLITOS CONTRACTING CORP08/31/2017
BISOTISSUEDSKYLINE RESTORATION INC08/21/2017
BIS—ISSUEDNATIONAL MAINTENANCE, INC12/01/2015
BIS—ISSUEDNATIONAL MAINTENANCE, INC12/01/2015
BISOTISSUEDSPK/LEWIS INC08/03/2015
BISMHISSUEDSPK/LEWIS INC08/03/2015
BISSPISSUEDPLUMBING NYC, INC07/14/2015
BISPLISSUEDPARKVIEW P&H INC07/13/2015
BISPLISSUEDTW PLUMBING & HEATING INC06/17/2015
BISMHISSUEDSPK/LEWIS INC06/09/2015
BISOTISSUEDSPK/LEWIS INC06/09/2015
BISOTISSUEDPRODUCTION CONTRACT. LLC04/30/2015
BISMHISSUEDPRODUCTION CONTRACT. LLC04/30/2015
BISOTISSUEDSKYLINE RESTORATION INC06/27/2014
BISEQISSUEDSPRING SCAFFOLDING LLC05/20/2014
BISOTISSUEDSKYLINE RESTORATION INC04/24/2014
+ 8 more permits on file
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
02/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/09/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/02/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/25/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 87
DateRequirementInspectorRole
07/30/2026Tenant Protection Plan ComplianceELIAS RASABIspecial
07/28/2026Mechanical SystemsELIAS RASABIspecial
07/28/2026FinalELIAS RASABIprogress
07/28/2026HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
07/28/2026Shutoff dampersELIAS RASABIenergy_progress
07/28/2026HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
02/02/2026Tenant Protection Plan ComplianceRoberta Levinespecial
02/02/2026FinalRoberta Levineprogress
12/18/2025Energy Code Compliance InspectionsJeffrey Stonesprogress
12/18/2025Tenant Protection Plan ComplianceJeffrey Stonesspecial
12/18/2025HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
12/18/2025FinalJeffrey Stonesprogress
12/18/2025Mechanical SystemsJeffrey Stonesspecial
12/18/2025HVAC-R and service water heating equipmentJeffrey Stonesenergy_progress
12/18/2025HVAC-R and service water heating system controlsJeffrey Stonesenergy_progress
12/18/2025Shutoff dampersJeffrey Stonesenergy_progress
12/12/2025Tenant Protection Plan ComplianceJeffrey Stonesspecial
12/08/2025Tenant Protection Plan Compliance—special
12/04/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
12/04/2025Tenant Protection Plan ComplianceJeffrey Stonesspecial
12/04/2025FinalJeffrey Stonesprogress
12/02/2025Tenant Protection Plan Compliance—special
12/01/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
12/01/2025FinalJeffrey Stonesprogress
11/03/2025Structural Steel - WeldingRICHARD LEMANSKYspecial
Latest 25 of 87.
▾Documents — 463 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
08/28/2026M00963588-I1Request digital key ↗
08/27/2026M01062668-I1Request digital key ↗
08/25/2026M01058211-S1Request digital key ↗
Showing 3 of 31 on file for this type
▸Applications & Permits70
▸BISPLAN / WORK APPROVAL APPLICATION43
06/10/2025141027626Open ↗
03/09/2018120365201Open ↗
02/26/2018120365201Open ↗
Showing 3 of 43 on file for this type
▸BISWORK PERMIT APPLICATION26
06/20/2025141027626Open ↗
07/24/2018120365201Open ↗
08/30/2017140688496Open ↗
Showing 3 of 26 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications145
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION38
10/05/2018140667366Open ↗
05/10/2018140688496Open ↗
03/22/2018122458134Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/25/2026M01058211-P1Open ↗
08/25/2026M01058211-S1Open ↗
08/25/2026M01058211-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/19/2026M01058211-S1Open ↗
09/05/2026M01354113-I1Open ↗
09/02/2026M01205829-S2Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/19/2026M01058211-S1Open ↗
09/19/2026M01058211-S1Open ↗
09/05/2026M01354113-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
06/10/2025141027626Open ↗
08/30/2017140688496Open ↗
07/24/2017140667366Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
01/11/2016122628638Open ↗
08/05/2015122458134Open ↗
05/05/2015122380636Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
06/10/2025141027626Open ↗
08/30/2017140688496Open ↗
07/24/2017140667366Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
06/10/2025141027626Open ↗
08/30/2017140688496Open ↗
07/24/2017140667366Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment39
▸BISEQUIPMENT USE PERMITS10
03/22/2018122458134Open ↗
07/25/2017122380636Open ↗
07/25/2017122380636Open ↗
Showing 3 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
03/15/2022120382692Open ↗
02/24/2021122381421Open ↗
06/20/2017122192527Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
10/05/2015122380636Open ↗
10/02/2015122380636Open ↗
07/23/2015122383456Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT6
03/22/2018122458134Open ↗
07/25/2017122380636Open ↗
Showing 2 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
06/14/2016122380636Open ↗
06/10/2016122380636Open ↗
06/16/2015122383456Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
11/28/2014120365201Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES2
08/30/2017140688496Open ↗
07/24/2017140667366Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos43
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
08/25/2026M01058211-P1Open ↗
08/25/2026M01058211-S1Open ↗
08/25/2026M01058211-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
06/10/2025141027626Open ↗
01/11/2016122628638Open ↗
01/11/2016122628647Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
06/26/2019120365201Open ↗
07/24/2017140667366Open ↗
▸BISASBESTOS: EXEMPTION (ASB4)1
05/07/2015122380636Open ↗
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
10/05/2018140667366Open ↗
03/27/2018122458134Open ↗
07/31/2017122380636Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
10/05/2018140667366Open ↗
03/27/2018122458134Open ↗
07/31/2017122380636Open ↗
Showing 3 of 7 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
08/30/2017140688496Open ↗
05/19/2014140200342Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/24/2017140667366Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/24/2017140667366Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
06/10/2025141027626Open ↗
06/10/2025141027626Open ↗
08/30/2017140688496Open ↗
Showing 3 of 5 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/20/2025141027626Open ↗
▸Approvals, Objections & Sign-offs26
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
11/09/2023120382692Open ↗
04/01/2021122381421Open ↗
06/26/2019120365201Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSUPERSEDING LETTER1
07/24/2018120365201Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership32
▸BISCOST AFFIDAVIT31
06/10/2025141027626Open ↗
04/01/2021122381421Open ↗
06/26/2019120365201Open ↗
Showing 3 of 31 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/08/2023120382692Open ↗
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET19
01/11/2016122628638Open ↗
01/11/2016122628647Open ↗
08/05/2015122458134Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM8
06/26/2019120365201Open ↗
10/05/2018140667366Open ↗
05/10/2018140688496Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION5
06/14/2016122380636Open ↗
06/10/2016122380636Open ↗
06/09/2016122380636Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
06/10/2025141027626Open ↗
08/30/2017140688496Open ↗
07/24/2017140667366Open ↗
Showing 3 of 4 on file for this type
▸Other Documents4
▸BISSD/SP FIRE PUMP TEST : FP-861
12/21/2015122380636Open ↗
▸DOB NOWIRA Certification1
08/13/2026M00963588-I1Open ↗
▸DOB NOWCalculations1
08/17/2026M01391705-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/17/2026M01391705-I1Open ↗