Elevator apt, semi-fireproof with stores
21 WEST 19 STREET
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1015471
💬 Discuss this project
1911Year Built
7Stories
D7Building Class
C6-4AZoning
11,375 sfGross Floor Area
7Units
18 Open Violations 16 unresolved · 2 paperwork only ▸FISP: UNSAFE
Elevator apt, semi-fireproof with stores · Owner of record: 19 FUNDING INC. · 2,300 sf lot · 4.95 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction14p · 4 filings · 20 docs
Floor 7Under Construction10p · 4 filings · 20 docs
Floor 6Under Construction9p · 4 filings · 20 docs
Floor 5Under Construction9p · 4 filings · 20 docs
Floor 4Under Construction9p · 4 filings · 20 docs
Floor 3Under Construction9p · 4 filings · 20 docs
Floor 2Under Construction9p · 4 filings · 20 docs
Floor 1Under Construction9p · 1 filing · 10 docs
CellarUnder Construction7p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
19 FUNDING2003/22/2026
J.M. REAL ESTATE COMPA103/22/2026
CITY ST RLTY CORP103/22/2026
TALICO CONTRACTING303/21/2026
TRANS WORLD EQUITIES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STRACAR ENGINEERING, P.C.407/09/2026
INTELLECT DESIGN311/18/2024
RIGID STRUCTURAL DESIGN, LLC108/15/2024
MELONE ARCHITECTS105/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STRACAR ENGINEERING P C603/21/2026
TRANSWORLD EQUITIES103/21/2026
CONCEPT DESIGN GROUP303/21/2026
Rigid Structural Design, LLC203/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ASPEN TRUSS INCGeneral Contractor1509/22/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor207/08/2026
TROADIO MENENDEZElectrical103/21/2026
DDS MECHANICAL FPS CORPFire Protection109/24/2026
INTERSYSTEM CONSTRUCTIONGeneral Contractor104/09/2026
SOVA CONSTRUCTION INCGeneral Contractor107/08/2026
ARISTA PLBG & HTG CORPPlumbing109/24/2026
ENOBRAC PLUMBING, INCPlumbing107/08/2026
ANTHONY LUCIANOElectrical103/21/2026
RUGOVA GROUP LLCPlumbing106/23/2026
TORRES IVANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRACAR SPECIAL INSPECTIO229407/09/2026
CDG ARCHITECTS LLC /DBA:1327311/18/2024
MELONE ARCHITECTS2944105/28/2024
Building Lifecycle
All (147)Filed (10)Permit Issued (22)Facade (FISP) (18)Violation (60)Inspection (2)Objection (14)Special Inspection (21)
09/23/2026
Permit issued — Plumbing
M01435219-I1-PL
09/23/2026
Permit issued — Sprinklers
M01435219-S1-EW-SP
09/21/2026
Permit issued — Mechanical Systems
M01435219-S2-MS
09/08/2026
Permit issued — Mechanical Systems
M01340008-I1-MS
09/08/2026
Permit issued — General Construction
M01280561-I1-GC
09/08/2026
Permit issued — General Construction
M01049546-I1-GC
09/08/2026
Permit issued — General Construction
M01241940-I1-GC
09/08/2026
Permit issued — General Construction
M01385573-I1-GC-CX
07/17/2026
Cycle 9 facade report submitted
07/17/2026
Cycle 9 facade report signed — SWARMP
07/13/2026
Permit issued — General Construction
M01385573-I1-GC-CX
07/09/2026
Filed — Alteration
ROOF REPLACEMENT WITH NEW BULKHEAD & SKYLIGHT.
M01385573-I1
07/01/2026
Cycle 9 facade inspection completed
04/20/2026
Violation issued (ECB, open)
Local Law
04/10/2026
Special inspection requirement — Final
MIRO Stracar
04/10/2026
Special inspection requirement — Structural Steel - Details
MIRO Stracar
04/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIRO Stracar
04/10/2026
Special inspection requirement — Structural Cold-Formed Steel
MIRO Stracar
04/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MIRO Stracar
04/10/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MIRO Stracar
04/10/2026
Special inspection requirement — Structural Steel - Welding
MIRO Stracar
03/31/2026
Permit issued — General Construction
M01241940-I1-GC
01/29/2026
Permit issued — Mechanical Systems
M01340008-I1-MS
01/23/2026
Filed — Alteration
INSTALLATION OF NEW HVAC SYSTEMS AS PER PLAN.
M01340008-I1
01/21/2026
Permit issued — Sidewalk Shed
M01095829-I1-SH
01/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIRO Stracar
01/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MIRO Stracar
01/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
MIRO Stracar
01/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
MIRO Stracar
12/26/2025
Special inspection requirement — Mechanical Systems
MIRO Stracar
12/26/2025
Special inspection requirement — Final
MIRO Stracar
12/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/12/2025
Special inspection requirement — Energy Code Compliance Inspections
MIRO Stracar
11/05/2025
Filed — Alteration CO
M01241940-I1
10/15/2025
Permit issued — General Construction
M01049546-I1-GC
10/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2025
Permit issued — Plumbing
M00990677-S2-PL
09/11/2025
Permit issued — General Construction
M01280561-I1-GC
09/08/2025
Filed — Alteration
M01280561-I1
08/04/2025
Permit issued — Sidewalk Shed
M01095829-I1-SH
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIRO Stracar
06/16/2025
Special inspection requirement — Lighting in dwelling units
MIRO Stracar
02/11/2025
Cycle 9 facade report submitted
02/09/2025
Cycle 9 facade report signed — UNSAFE
01/25/2025
Cycle 9 facade inspection completed
11/18/2024
Filed — Alteration
M00990677-S2
10/15/2024
Permit issued — General Construction
M01049546-I1-GC
08/22/2024
Permit issued — Suspended Scaffold
M01095953-I1-SC
08/21/2024
Objection raised — Other
08/21/2024
Objection resolved — Addressed
08/15/2024
Filed — Alteration
M01095829-I1
08/15/2024
Permit issued — Sidewalk Shed
M01095829-I1-SH
08/14/2024
Filed — Alteration
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01095953-I1
07/31/2024
Permit issued — General Construction
M01049546-I1-GC
07/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
Yongho Kim
06/04/2024
Permit issued — Mechanical Systems
M00990677-I1-MS
05/28/2024
Filed — Alteration
M01049546-I1
05/28/2024
Permit issued — Plumbing
M00990677-S1-PL
05/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
Nicholas Melone
05/10/2024
Special inspection requirement — Masonry
Nicholas Melone
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedARISTA PLBG & HTG CORP09/23/2026
DOB NOWSprinklersPermit IssuedDDS MECHANICAL FPS CORP09/23/2026
DOB NOWMechanical SystemsPermit IssuedASPEN TRUSS INC09/21/2026
DOB NOWMechanical SystemsPermit IssuedASPEN TRUSS INC09/08/2026
DOB NOWGeneral ConstructionPermit IssuedASPEN TRUSS INC09/08/2026
DOB NOWGeneral ConstructionPermit IssuedASPEN TRUSS INC09/08/2026
DOB NOWGeneral ConstructionPermit IssuedASPEN TRUSS INC09/08/2026
DOB NOWGeneral ConstructionPermit IssuedASPEN TRUSS INC09/08/2026
DOB NOWGeneral ConstructionPermit IssuedASPEN TRUSS INC07/13/2026
DOB NOWGeneral ConstructionPermit IssuedASPEN TRUSS03/31/2026
DOB NOWMechanical SystemsPermit IssuedASPEN TRUSS01/29/2026
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEM CONSTRUCTION01/21/2026
DOB NOWGeneral ConstructionPermit IssuedASPEN TRUSS10/15/2025
DOB NOWPlumbingPermit IssuedRUGOVA GROUP LLC10/03/2025
DOB NOWGeneral ConstructionPermit IssuedASPEN TRUSS09/11/2025
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S08/04/2025
DOB NOWGeneral ConstructionPermit IssuedASPEN TRUSS10/15/2024
DOB NOWSuspended ScaffoldPermit IssuedEVERLAST SOLUTIONS CORP08/22/2024
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S08/15/2024
DOB NOWGeneral ConstructionPermit IssuedASPEN TRUSS07/31/2024
DOB NOWMechanical SystemsPermit IssuedSOVA CONSTRUCTION INC06/04/2024
DOB NOWPlumbingPermit IssuedENOBRAC PLUMBING, INC05/28/2024
BISMHISSUEDASPEN TRUSS INC06/25/2019
BISEQISSUEDTALICO CONTRACTING INC01/03/2017
BISOTISSUEDFORT-CICA ROOFING & GEN10/19/2016
BISEQISSUEDTALICO CONTRACTING INC08/10/2015
BISPLISSUEDREEM P&H CORP07/18/2012
BISOTISSUEDWILLIAM A. SPROSTON07/06/2012
BISFSISSUEDA R FUELS_INC07/22/1997
BISBLISSUEDA R FUELS INC06/27/1990
2 projects · most recent 01/23/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
01/23/2026Permit IssuedASPEN TRUSS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NLHZ 60,000 BTU · Condensing Unit ×6
Ventilation
York R-11 600 CFM · Erv ×1
11/18/2024Permit IssuedSOVA CONSTRUCTION INCAir Conditioning Systems, Heating Systems
Cooling
Trane 4TXCC007DS3HCBA 48,000 BTU · Fan Coil Indoor ×2
Odyssey TTA09043DAA02BS010 92,000 BTU · Condensing Unit ×1
Heating
Trane S8X1C100M5PSC-BA 80,700 BTU · Furnace ×2
1 project · most recent 11/18/2024
Gas
FiledStatusContractorScope
11/18/2024Permit IssuedRUGOVA GROUP LLCGas
3 projects · most recent 06/22/2026
General Wiring
FiledStatusContractorScope
06/22/2026Permit IssuedBASS ELECTRICAL CORP.General Wiring
11/03/2025Permit IssuedJAM ELECTRICAL CORP—
08/16/2024Permit IssuedAURORA ELECL CONTG INC—
1 project · most recent 07/09/2026
Steel
FiledStatusContractorScope
07/09/2026Permit IssuedASPEN TRUSS INCSteel
1 project · most recent 08/14/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
08/14/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
04/10/2026FinalMIRO Stracarprogress
04/10/2026Structural Steel - DetailsMIRO Stracarspecial
04/10/2026Fire-Resistant Penetrations and JointsMIRO Stracarspecial
04/10/2026Structural Cold-Formed SteelMIRO Stracarspecial
04/10/2026Structural Stability – Alterations of existing buildingsMIRO Stracarspecial
04/10/2026Structural Steel - High Strength BoltingMIRO Stracarspecial
04/10/2026Structural Steel - WeldingMIRO Stracarspecial
01/13/2026Fire-Resistant Penetrations and JointsMIRO Stracarspecial
01/13/2026HVAC-R and service water piping design and insulationMIRO Stracarenergy_progress
01/13/2026HVAC-R and service water heating equipmentMIRO Stracarenergy_progress
01/13/2026HVAC-R and service water heating system controlsMIRO Stracarenergy_progress
12/26/2025Mechanical SystemsMIRO Stracarspecial
12/26/2025FinalMIRO Stracarprogress
12/12/2025Energy Code Compliance InspectionsMIRO Stracarprogress
06/16/2025Fire-Resistant Penetrations and JointsMIRO Stracarspecial
06/16/2025Lighting in dwelling unitsMIRO Stracarenergy_progress
07/07/2024Tenant Protection Plan ComplianceYongho Kimspecial
05/10/2024Tenant Protection Plan ComplianceNicholas Melonespecial
05/10/2024MasonryNicholas Melonespecial
05/10/2024FinalNicholas Meloneprogress
01/16/2024Tenant Protection Plan ComplianceYongho Kimspecial
▾Documents — 128 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026M01049546-I1Request digital key ↗
08/26/2026M01095829-I1Request digital key ↗
08/25/2026M00990677-S2Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION6
06/26/2019123812133Open ↗
01/11/2017140387007Open ↗
10/25/2016122793129Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLPC Approval/Permit6
08/16/2026M01385573-I1Open ↗
08/13/2026M00990677-S2Open ↗
08/13/2026M01049546-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
06/24/2019123812133Open ↗
06/06/2016122793129Open ↗
08/07/2015140387007Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M01241940-I1Open ↗
▸Seals & Professional Certifications43
▸DOB NOWSpecial Inspector Seal & Signature13
09/16/2026M01340008-I1Open ↗
09/16/2026M01340008-I1Open ↗
08/31/2026M01385573-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026M01049546-I1Open ↗
08/26/2026M01095829-I1Open ↗
08/25/2026M00990677-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/16/2026M01340008-I1Open ↗
09/16/2026M01340008-I1Open ↗
09/16/2026M01340008-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
07/08/2019123812133Open ↗
06/24/2019123812133Open ↗
12/09/2016122793129Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/26/2019123812133Open ↗
08/07/2015140387007Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/24/2019123812133Open ↗
07/05/2012121138777Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/05/2012121138777Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/07/2015140387007Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/07/2015140387007Open ↗
▸Trade Schedules & Equipment12
▸BISEQUIPMENT USE APPLICATION/PERMIT7
07/01/2019123812133Open ↗
07/01/2019123812133Open ↗
07/01/2019123812133Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
10/04/2012121138777Open ↗
08/17/2012121138777Open ↗
▸BISSCHEDULE B - PLUMBING2
08/13/2012121138777Open ↗
07/05/2012121138777Open ↗
▸BISEQUIPMENT USE PERMITS1
07/01/2019123812133Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
06/26/2019123812133Open ↗
06/06/2016122793129Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M01241940-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026M01049546-I1Open ↗
08/21/2026M01280561-I1Open ↗
08/19/2026M01340008-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
06/24/2019123812133Open ↗
06/06/2016122793129Open ↗
07/05/2012121138777Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/09/2016122793129Open ↗
06/06/2016122793129Open ↗
07/05/2012121138777Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
12/09/2016122793129Open ↗
12/17/2012121138777Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/07/2015140387007Open ↗
▸Approvals, Objections & Sign-offs12
▸BISLANDMARKS APPROVAL6
07/08/2019123812133Open ↗
06/26/2019123812133Open ↗
06/24/2019123812133Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
07/08/2019123812133Open ↗
01/04/2017122793129Open ↗
01/04/2017122793129Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
07/05/2012121138777Open ↗
▸BISSHED LETTER1
01/11/2017140387007Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
07/08/2019123812133Open ↗
06/24/2019123812133Open ↗
12/09/2016122793129Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
06/24/2019123812133Open ↗
06/06/2016122793129Open ↗
07/05/2012121138777Open ↗
▸BISBOROUGH INTAKE FORM1
07/08/2019123812133Open ↗
▸BISADDITIONAL INFORMATION1
10/24/2016122793129Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/07/2015140387007Open ↗
▸Other Documents4
▸DOB NOWCalculations1
08/13/2026M01095953-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01095953-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026M01385573-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026M01241940-I1Open ↗