Office only, 2-6 stories
21 WEST 26 STREET
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1015641
💬 Discuss this project
1881Year Built
3Stories
O2Building Class
M1-8A/R11Zoning
5,250 sfGross Floor Area
1Units
3 Open Violations ▸
Office only, 2-6 stories · Owner of record: REALESTATEPOLITIK LLC · 2,469 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof92p · 5 filings · 20 docs
Floor 413p · 6 filings · 20 docs
Floor 3156p · 6 filings · 20 docs
Floor 2159p · 6 filings · 20 docs
Floor 1151p · 6 filings · 20 docs
Cellar161p · 5 filings · 20 docs
Basement55p · 2 filings · 20 docs
Sub-Basement101p · 5 filings · 20 docs
Site & exterior49p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REALESTATEPOLITIK5207/08/2026
JJ MATTHEWS INC503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/29/2021$6.7M—AZ ASSOCIATES, L.P. → REALESTATEPOLITIK LLC$1,276/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING3203/21/2026
EUROCELT EXPEDITING, INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QWEST CONTRACTING CORPGeneral Contractor1507/08/2026
JJ MATTHEWS INCGeneral Contractor203/21/2026
ADVANCED PLUMBING MECHPlumbing207/08/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
ADVANCED PLBG, MECH & SPRFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678502/19/2026
MADE ARCHITECTURE PLLC24271202/19/2026
SKYLINE ENGINEERING, PLLC267505/19/2023
Building Lifecycle
All (126)Filed (17)Permit Issued (14)Signed Off (2)Violation (10)Inspection (10)Objection (43)Special Inspection (30)
04/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/09/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/25/2026
Objection raised — Scope
02/19/2026
Filed — Alteration
MECHANICAL WORK PROPOSED AS PER PLANS FILED HEREWITH.
M00680133-P2
02/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
02/18/2026
Special inspection requirement — Mechanical Systems
Ari Kamo
02/18/2026
Special inspection requirement — Heating Systems
Ari Kamo
02/18/2026
Special inspection requirement — Final
Ari Kamo
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/06/2025
Signed off — Alteration
INSTALLATION OF A NEW SPRINKLER SYSTEM
M00679889-I1
06/12/2025
Permit issued — General Construction
M00673255-I1-GC
09/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/19/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/18/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/29/2024
Signed off — Alteration
M00691265-I1
08/07/2024
Filed — Alteration CO
TAX LOT COMBINATION OF TWO EXISTING COMMERCIAL BUILDINGS. AN ENLARGEMENT, INTERIOR AND EXTERIOR RENOVATION PROPOSED AS PER PLANS FILED HEREWITH.
M00673255-P3
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
08/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
08/05/2024
Special inspection requirement — Sprinkler Systems
Ari Kamo
08/04/2024
Filed — Alteration
MECHANICAL WORK PROPOSED AS PER PLANS FILED HEREWITH.
M00680133-P1
08/04/2024
Filed — Alteration
INSTALLATION OF A NEW SPRINKLER SYSTEM
M00679889-P1
08/04/2024
Filed — Alteration
PLUMBING WORK PROPOSED AS PER PLANS FILED HEREWITH.
M00679919-P2
07/25/2024
Permit issued — Foundation
M00693965-I1-FO
07/22/2024
Special inspection requirement — Mechanical Systems
Ari Kamo
07/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
07/22/2024
Special inspection requirement — Heating Systems
Ari Kamo
07/22/2024
Special inspection requirement — Final
Ari Kamo
07/18/2024
Permit issued — Plumbing
M00679919-I1-PL
07/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
07/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
07/17/2024
Special inspection requirement — Sprinkler Systems
Ari Kamo
07/15/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/11/2024
Permit issued — General Construction
M00673255-I1-GC
06/19/2024
Filed — Alteration CO
TAX LOT COMBINATION OF TWO EXISTING COMMERCIAL BUILDINGS. AN ENLARGEMENT, INTERIOR AND EXTERIOR RENOVATION PROPOSED AS PER PLANS FILED HEREWITH.
M00673255-P2
06/07/2024
Permit issued — General Construction
M00691265-I1-GC
06/03/2024
Special inspection requirement — Air barrier - visual inspection
Benjamin Bischoff
06/03/2024
Special inspection requirement — Insulation placement and R values
Benjamin Bischoff
06/03/2024
Special inspection requirement — Fenestration air leakage
Benjamin Bischoff
06/03/2024
Special inspection requirement — Protection of exposed foundation insulation
Benjamin Bischoff
06/03/2024
Special inspection requirement — Fenestration areas
Benjamin Bischoff
06/03/2024
Special inspection requirement — Chimneys and vents
06/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
06/03/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Benjamin Bischoff
06/03/2024
Special inspection requirement — Luminous Exit Path Markings
Benjamin Bischoff
05/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/03/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/16/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/24/2023
Permit issued — Structural
M00683319-I1-ST
08/23/2023
Filed — Alteration CO
TAX LOT COMBINATION OF TWO EXISTING COMMERCIAL BUILDINGS. AN ENLARGEMENT, INTERIOR AND EXTERIOR RENOVATION PROPOSED AS PER PLANS FILED HEREWITH.
M00673255-P1
08/18/2023
Special inspection requirement — Insulation placement and R values
Benjamin Bischoff
08/18/2023
Special inspection requirement — Fenestration air leakage
Benjamin Bischoff
08/18/2023
Special inspection requirement — Fenestration areas
Benjamin Bischoff
08/18/2023
Special inspection requirement — Luminous Exit Path Markings
Benjamin Bischoff
08/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
08/18/2023
Special inspection requirement — Chimneys and vents
Benjamin Bischoff
08/18/2023
Special inspection requirement — Protection of exposed foundation insulation
Benjamin Bischoff
07/28/2023
Permit issued — Supported Scaffold
M00909943-I1-SF
07/27/2023
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AT THE ELEVATOR SHAFT AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33
M00909943-I1
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedQWEST CONTRACTING CORP06/12/2025
DOB NOWFoundationPermit IssuedQWEST CONTRACTING CORP07/25/2024
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH07/18/2024
DOB NOWGeneral ConstructionPermit IssuedQWEST CONTRACTING CORP07/11/2024
DOB NOWGeneral ConstructionSigned-offQWEST CONTRACTING CORP06/07/2024
DOB NOWStructuralPermit IssuedQWEST CONTRACTING CORP08/24/2023
DOB NOWSupported ScaffoldPermit IssuedJJ MATTHEWS07/28/2023
DOB NOWSprinklersSigned-offADVANCED PLBG, MECH & SPR07/18/2023
DOB NOWGeneral ConstructionPermit IssuedQWEST CONTRACTING CORP07/14/2023
DOB NOWMechanical SystemsPermit IssuedQWEST CONTRACTING CORP06/22/2023
DOB NOWGeneral ConstructionPermit IssuedQWEST CONTRACTING CORP06/15/2023
DOB NOWEarth WorkSigned-offQWEST CONTRACTING CORP06/09/2023
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH04/13/2023
DOB NOWGeneral ConstructionPermit IssuedQWEST CONTRACTING CORP10/25/2022
BISMHISSUEDMUSA & SAMI CONSTRUCTION10/27/2011
BISSPISSUEDVINRAY PLG & HTG INC10/07/1993
BISPLISSUEDABRA MECH.SERVICES,INC.04/28/1992
BISEQISSUEDABRA CONSTRUCTION CORP01/22/1992
BISPLISSUEDABRA MECH.SERVICES,INC.08/30/1991
BISEQISSUEDABRA CONSTRUCTION CORP07/17/1991
BIS—ISSUEDABRA CONST. CORP.07/02/1991
1 project · most recent 08/04/2024
Gas Water/Sanitary
FiledStatusContractorScope
08/04/2024Permit IssuedADVANCED PLUMBING MECHGas, Water/Sanitary
2 projects · most recent 08/22/2023
General Wiring
FiledStatusContractorScope
08/22/2023CompleteEXECUTIVE ELECTL SER INCGeneral Wiring
05/26/2023Permit IssuedSTAR ELEC'L CONTRACTORS C—
1 project · most recent 08/24/2022
Steel Concrete
FiledStatusContractorScope
08/24/2022Permit IssuedQWEST CONTRACTING CORPSteel, Concrete
1 project · most recent 07/27/2023
Scaffold
FiledStatusContractorScope
07/27/2023Permit IssuedJJ MATTHEWS INCScaffold
1 project · most recent 05/19/2023
Earthwork
FiledStatusContractorScope
05/19/2023Signed-offQWEST CONTRACTING CORPEarthwork
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/09/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/18/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
07/15/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/03/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/16/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
02/18/2026Fire-Resistant Penetrations and JointsBenjamin Bischoffspecial
02/18/2026Heating SystemsAri Kamospecial
02/18/2026Mechanical SystemsAri Kamospecial
02/18/2026FinalAri Kamoprogress
08/06/2024Fire-Resistant Penetrations and JointsBenjamin Bischoffspecial
08/05/2024Fire-Resistant Penetrations and JointsBenjamin Bischoffspecial
08/05/2024Sprinkler SystemsAri Kamospecial
07/22/2024Heating SystemsAri Kamospecial
07/22/2024FinalAri Kamoprogress
07/22/2024Fire-Resistant Penetrations and JointsBenjamin Bischoffspecial
07/22/2024Mechanical SystemsAri Kamospecial
07/17/2024Sprinkler SystemsAri Kamospecial
07/17/2024Fire-Resistant Penetrations and JointsBenjamin Bischoffspecial
07/17/2024Fire-Resistant Penetrations and JointsBenjamin Bischoffspecial
06/03/2024Insulation placement and R valuesBenjamin Bischoffenergy_progress
06/03/2024Fenestration and door U-factor and product ratingsBenjamin Bischoffenergy_progress
06/03/2024Air barrier - visual inspectionBenjamin Bischoffenergy_progress
06/03/2024Fenestration areasBenjamin Bischoffenergy_progress
06/03/2024Chimneys and vents—special
06/03/2024Fire-Resistant Penetrations and JointsBenjamin Bischoffspecial
06/03/2024Luminous Exit Path MarkingsBenjamin Bischoffspecial
06/03/2024Fenestration air leakageBenjamin Bischoffenergy_progress
06/03/2024Protection of exposed foundation insulationBenjamin Bischoffenergy_progress
08/18/2023Protection of exposed foundation insulationBenjamin Bischoffenergy_progress
08/18/2023Chimneys and ventsBenjamin Bischoffspecial
Latest 25 of 61.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Furasia GroupOffice—
Project M00693965 Alteration · Permit Entire · 12/22/2022
Project M00683319 Alteration · Permit Entire · 08/24/2022
Eurasia GroupOffice—
Project M00691265 Alteration · LOC Issued · 03/10/2022
Project M00673255 Alteration CO · Permit Entire · 03/04/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 172 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
09/02/2026M00691265-I1Request digital key ↗
09/02/2026M00679889-I1Request digital key ↗
09/02/2026M00679889-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits18
▸DOB NOWLPC Approval/Permit15
08/26/2026M00673255-P1Open ↗
08/26/2026M00673255-P2Open ↗
08/26/2026M00673255-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
06/07/2024102745629Open ↗
08/15/2011120786088Open ↗
▸BISWORK PERMIT APPLICATION1
10/31/2011120786088Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/26/2026M00673255-I1Open ↗
08/26/2026M00673255-P1Open ↗
08/26/2026M00673255-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/26/2026M00673255-I1Open ↗
08/26/2026M00673255-P1Open ↗
08/26/2026M00673255-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications77
▸DOB NOWSpecial Inspector Seal & Signature37
09/03/2026M00683319-I1Open ↗
09/03/2026M00683319-I1Open ↗
09/03/2026M00683319-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/03/2026M00683319-I1Open ↗
09/01/2026M00673255-P1Open ↗
09/01/2026M00673255-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/02/2026M00679889-I1Open ↗
09/01/2026M00693965-I1Open ↗
08/31/2026M00874883-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION3
01/11/2012120786088Open ↗
01/11/2012120786088Open ↗
08/15/2011120786088Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/15/2011120786088Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/15/2011120786088Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE PERMITS2
01/12/2012120786088Open ↗
01/12/2012120786088Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT1
01/11/2012120786088Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/26/2026M00673255-I1Open ↗
08/26/2026M00673255-P1Open ↗
08/26/2026M00673255-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026M00673255-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026M00673255-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
09/01/2026M00693965-I1Open ↗
08/31/2026M00874883-I1Open ↗
08/26/2026M00680133-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/15/2011120786088Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00691265-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLANDMARKS APPROVAL1
10/24/2011120786088Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/15/2011120786088Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/15/2011120786088Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/15/2011120786088Open ↗
▸Other Documents29
▸DOB NOWProof of Historic Building8
08/13/2026M00691265-I1Open ↗
08/13/2026M00680133-P2Open ↗
08/13/2026M00679919-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlot Diagram6
08/26/2026M00673255-P1Open ↗
08/26/2026M00673255-P2Open ↗
08/26/2026M00673255-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial4
08/26/2026M00673255-P2Open ↗
08/26/2026M00673255-P1Open ↗
08/26/2026M00673255-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/26/2026M00673255-P1Open ↗
08/26/2026M00673255-P2Open ↗
08/26/2026M00673255-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/26/2026M00673255-P1Open ↗
08/26/2026M00673255-P2Open ↗
08/26/2026M00673255-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00874883-I1Open ↗
▸DOB NOWPW1 (from plan PDF)1
08/16/2026M00680133-P2Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026M00673255-I1Open ↗