21 WEST 26TH STREET
MANHATTAN · BIN 1015641
💬 Discuss this project
1881Year Built
3Stories
O2Building Class
M1-8A/R11Zoning
5,250 sfGross Floor Area
1Units
2 Active Violations 1 old, status unconfirmed ▸
Office only, 2-6 stories · Owner of record: Realestatepolitik · 2,469 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFurasia Group100p · 6 filings · 20 docs
BulkheadFurasia Group1p · 1 filing · 20 docs
Floor 4Furasia Group13p · 6 filings · 20 docs
Floor 3Furasia Group154p · 6 filings · 20 docs
Floor 2Furasia Group156p · 6 filings · 20 docs
Floor 1Furasia Group147p · 6 filings · 20 docs
MezzanineFurasia Group4p · 1 filing · 20 docs
CellarFurasia Group154p · 5 filings · 20 docs
BasementFurasia Group58p · 4 filings · 20 docs
Sub-BasementFurasia Group98p · 5 filings · 20 docs
Site & exteriorFurasia Group48p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Realestatepolitik5207/08/2026
Writers House403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/29/2021$6.7M—AZ ASSOCIATES, L.P. → Realestatepolitik$1,276/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J Callahan Consulting3203/21/2026
Eurocelt Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Qwest ContractingGeneral Contractor1507/08/2026
JJ MatthewsScaffold203/21/2026
Advanced Plumbing MechanicalPlumbing207/08/2026
Star Electrical ContractorsElectrical103/22/2026
Advanced Plumbing, Mechanical & SprinklerFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK Engineering678502/19/2026
Made Architecture24271202/19/2026
Skyline Engineering267505/19/2023
Building Lifecycle
All (124)Filed (17)Permit Issued (14)Signed Off (2)Violation (10)Inspection (8)Objection (43)Special Inspection (30)
03/25/2026
Objection raised — Scope
02/19/2026
Filed — Alteration
MECHANICAL WORK PROPOSED AS PER PLANS FILED HEREWITH.
M00680133-P2
02/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
02/18/2026
Special inspection requirement — Heating Systems
Ari Kamo
02/18/2026
Special inspection requirement — Mechanical Systems
Ari Kamo
02/18/2026
Special inspection requirement — Final
Ari Kamo
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/06/2025
Signed off — Alteration
INSTALLATION OF A NEW SPRINKLER SYSTEM
M00679889-I1
06/12/2025
Permit issued — General Construction
M00673255-I1-GC
09/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/19/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/18/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/29/2024
Signed off — Alteration
M00691265-I1
08/07/2024
Filed — Alteration CO
TAX LOT COMBINATION OF TWO EXISTING COMMERCIAL BUILDINGS. AN ENLARGEMENT, INTERIOR AND EXTERIOR RENOVATION PROPOSED AS PER PLANS FILED HEREWITH.
M00673255-P3
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
08/05/2024
Special inspection requirement — Sprinkler Systems
Ari Kamo
08/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
08/04/2024
Filed — Alteration
MECHANICAL WORK PROPOSED AS PER PLANS FILED HEREWITH.
M00680133-P1
08/04/2024
Filed — Alteration
INSTALLATION OF A NEW SPRINKLER SYSTEM
M00679889-P1
08/04/2024
Filed — Alteration
PLUMBING WORK PROPOSED AS PER PLANS FILED HEREWITH.
M00679919-P2
07/25/2024
Permit issued — Foundation
M00693965-I1-FO
07/22/2024
Special inspection requirement — Heating Systems
Ari Kamo
07/22/2024
Special inspection requirement — Mechanical Systems
Ari Kamo
07/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
07/22/2024
Special inspection requirement — Final
Ari Kamo
07/18/2024
Permit issued — Plumbing
M00679919-I1-PL
07/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
07/17/2024
Special inspection requirement — Sprinkler Systems
Ari Kamo
07/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
07/15/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/11/2024
Permit issued — General Construction
M00673255-I1-GC
06/19/2024
Filed — Alteration CO
TAX LOT COMBINATION OF TWO EXISTING COMMERCIAL BUILDINGS. AN ENLARGEMENT, INTERIOR AND EXTERIOR RENOVATION PROPOSED AS PER PLANS FILED HEREWITH.
M00673255-P2
06/07/2024
Permit issued — General Construction
M00691265-I1-GC
06/03/2024
Special inspection requirement — Fenestration air leakage
Benjamin Bischoff
06/03/2024
Special inspection requirement — Air barrier - visual inspection
Benjamin Bischoff
06/03/2024
Special inspection requirement — Fenestration areas
Benjamin Bischoff
06/03/2024
Special inspection requirement — Luminous Exit Path Markings
Benjamin Bischoff
06/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Bischoff
06/03/2024
Special inspection requirement — Protection of exposed foundation insulation
Benjamin Bischoff
06/03/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Benjamin Bischoff
06/03/2024
Special inspection requirement — Chimneys and vents
06/03/2024
Special inspection requirement — Insulation placement and R values
Benjamin Bischoff
05/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/03/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/16/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/24/2023
Permit issued — Structural
M00683319-I1-ST
08/23/2023
Filed — Alteration CO
TAX LOT COMBINATION OF TWO EXISTING COMMERCIAL BUILDINGS. AN ENLARGEMENT, INTERIOR AND EXTERIOR RENOVATION PROPOSED AS PER PLANS FILED HEREWITH.
M00673255-P1
08/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Benjamin Bischoff
08/18/2023
Special inspection requirement — Air barrier - visual inspection
Benjamin Bischoff
08/18/2023
Special inspection requirement — Protection of exposed foundation insulation
Benjamin Bischoff
08/18/2023
Special inspection requirement — Insulation placement and R values
Benjamin Bischoff
08/18/2023
Special inspection requirement — Fenestration air leakage
Benjamin Bischoff
08/18/2023
Special inspection requirement — Fenestration areas
Benjamin Bischoff
08/18/2023
Special inspection requirement — Luminous Exit Path Markings
Benjamin Bischoff
07/28/2023
Permit issued — Supported Scaffold
M00909943-I1-SF
07/27/2023
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AT THE ELEVATOR SHAFT AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33
M00909943-I1
07/18/2023
Permit issued — Sprinklers
M00679889-I1-EW-SP
07/14/2023
Permit issued — General Construction
M00673255-I1-GC
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedQwest Contracting06/12/2025
DOB NOWFoundationPermit IssuedQwest Contracting07/25/2024
DOB NOWPlumbingPermit IssuedAdvanced Plumbing Mechanical07/18/2024
DOB NOWGeneral ConstructionPermit IssuedQwest Contracting07/11/2024
DOB NOWGeneral ConstructionSigned-offQwest Contracting06/07/2024
DOB NOWStructuralPermit IssuedQwest Contracting08/24/2023
DOB NOWSupported ScaffoldPermit IssuedJJ Matthews07/28/2023
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler07/18/2023
DOB NOWGeneral ConstructionPermit IssuedQwest Contracting07/14/2023
DOB NOWMechanical SystemsPermit IssuedQwest Contracting06/22/2023
DOB NOWGeneral ConstructionPermit IssuedQwest Contracting06/15/2023
DOB NOWEarth WorkSigned-offQwest Contracting06/09/2023
DOB NOWPlumbingPermit IssuedAdvanced Plumbing Mechanical04/13/2023
DOB NOWGeneral ConstructionPermit IssuedQwest Contracting10/25/2022
BISMHISSUEDMusa & Sami Construction10/27/2011
BISSPISSUEDVinray PLG & Heating10/07/1993
BISPLISSUEDAbra Mechanical Services04/28/1992
BISEQISSUEDAbra Construction01/22/1992
BISPLISSUEDAbra Mechanical Services08/30/1991
BISEQISSUEDAbra Construction07/17/1991
BIS—ISSUEDAbra Construction07/02/1991
1 project · most recent 08/04/2024
Gas Water/Sanitary
FiledStatusContractorScope
08/04/2024Permit IssuedAdvanced Plumbing MechanicalGas, Water/Sanitary
2 projects · most recent 08/22/2023
General Wiring
FiledStatusContractorScope
08/22/2023CompleteExecutive Electl ServicesGeneral Wiring
05/26/2023Permit IssuedStar Electrical Contractors—
1 project · most recent 08/24/2022
Steel Concrete
FiledStatusContractorScope
08/24/2022Permit IssuedQwest ContractingSteel, Concrete
1 project · most recent 07/27/2023
Scaffold
FiledStatusContractorScope
07/27/2023Permit IssuedJJ MatthewsScaffold
1 project · most recent 05/19/2023
Earthwork
FiledStatusContractorScope
05/19/2023Signed-offQwest ContractingEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/18/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
07/15/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/03/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/16/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
02/18/2026Mechanical SystemsAri Kamospecial
02/18/2026FinalAri Kamoprogress
02/18/2026Heating SystemsAri Kamospecial
02/18/2026Fire-Resistant Penetrations and JointsBenjamin Bischoffspecial
08/06/2024Fire-Resistant Penetrations and JointsBenjamin Bischoffspecial
08/05/2024Fire-Resistant Penetrations and JointsBenjamin Bischoffspecial
08/05/2024Sprinkler SystemsAri Kamospecial
07/22/2024Heating SystemsAri Kamospecial
07/22/2024Fire-Resistant Penetrations and JointsBenjamin Bischoffspecial
07/22/2024FinalAri Kamoprogress
07/22/2024Mechanical SystemsAri Kamospecial
07/17/2024Fire-Resistant Penetrations and JointsBenjamin Bischoffspecial
07/17/2024Sprinkler SystemsAri Kamospecial
07/17/2024Fire-Resistant Penetrations and JointsBenjamin Bischoffspecial
06/03/2024Fire-Resistant Penetrations and JointsBenjamin Bischoffspecial
06/03/2024Fenestration and door U-factor and product ratingsBenjamin Bischoffenergy_progress
06/03/2024Fenestration areasBenjamin Bischoffenergy_progress
06/03/2024Chimneys and vents—special
06/03/2024Insulation placement and R valuesBenjamin Bischoffenergy_progress
06/03/2024Luminous Exit Path MarkingsBenjamin Bischoffspecial
06/03/2024Air barrier - visual inspectionBenjamin Bischoffenergy_progress
06/03/2024Protection of exposed foundation insulationBenjamin Bischoffenergy_progress
06/03/2024Fenestration air leakageBenjamin Bischoffenergy_progress
08/18/2023Fenestration and door U-factor and product ratingsBenjamin Bischoffenergy_progress
08/18/2023Chimneys and ventsBenjamin Bischoffspecial
Latest 25 of 61.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Furasia GroupOfficeCellar, Sub-basement, Basement, Floors 1–4, Roof
Project M00693965 Alteration · Permit Entire · 12/22/2022
Project M00683319 Alteration · Permit Entire · 08/24/2022
Project M00679889 Alteration · LOC Issued · 08/23/2022
Project M00679919 Alteration · Permit Entire · 08/23/2022
Project M00680133 Alteration · Permit Entire · 08/23/2022
Project M00691265 Alteration · LOC Issued · 03/10/2022
Project M00673255 Alteration CO · Permit Entire · 03/04/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 172 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
09/02/2026M00691265-I1Request digital key ↗
09/02/2026M00679889-P1Request digital key ↗
09/02/2026M00679889-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits18
▸DOB NOWLPC Approval/Permit15
08/26/2026M00673255-I1Open ↗
08/26/2026M00673255-P2Open ↗
08/26/2026M00673255-P1Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
06/07/2024102745629Open ↗
08/15/2011120786088Open ↗
▸BISWORK PERMIT APPLICATION1
10/31/2011120786088Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/26/2026M00673255-P1Open ↗
08/26/2026M00673255-P2Open ↗
08/26/2026M00673255-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/26/2026M00673255-P1Open ↗
08/26/2026M00673255-P2Open ↗
08/26/2026M00673255-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications77
▸DOB NOWSpecial Inspector Seal & Signature37
09/03/2026M00683319-I1Open ↗
09/03/2026M00683319-I1Open ↗
09/03/2026M00683319-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/03/2026M00683319-I1Open ↗
09/01/2026M00673255-P1Open ↗
09/01/2026M00673255-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/02/2026M00679889-I1Open ↗
09/01/2026M00693965-I1Open ↗
08/31/2026M00874883-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION3
01/11/2012120786088Open ↗
01/11/2012120786088Open ↗
08/15/2011120786088Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/15/2011120786088Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/15/2011120786088Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE PERMITS2
01/12/2012120786088Open ↗
01/12/2012120786088Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT1
01/11/2012120786088Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/26/2026M00673255-P2Open ↗
08/26/2026M00673255-P1Open ↗
08/26/2026M00673255-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026M00673255-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026M00673255-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
09/01/2026M00693965-I1Open ↗
08/31/2026M00874883-I1Open ↗
08/26/2026M00680133-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/15/2011120786088Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00691265-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLANDMARKS APPROVAL1
10/24/2011120786088Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/15/2011120786088Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/15/2011120786088Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/15/2011120786088Open ↗
▸Other Documents29
▸DOB NOWProof of Historic Building8
08/13/2026M00691265-I1Open ↗
08/13/2026M00679919-I1Open ↗
08/13/2026M00679919-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlot Diagram6
08/26/2026M00673255-P1Open ↗
08/26/2026M00673255-P2Open ↗
08/26/2026M00673255-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial4
08/26/2026M00673255-P2Open ↗
08/26/2026M00673255-P1Open ↗
08/26/2026M00673255-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/26/2026M00673255-I1Open ↗
08/26/2026M00673255-P2Open ↗
08/26/2026M00673255-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/26/2026M00673255-P1Open ↗
08/26/2026M00673255-P2Open ↗
08/26/2026M00673255-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00874883-I1Open ↗
▸DOB NOWPW1 (from plan PDF)1
08/16/2026M00680133-P2Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026M00673255-I1Open ↗